WEBVTT

00:00:05.300 --> 00:00:09.820
going to call the meeting to order of the for Monday April 23rd of the Twin

00:00:09.820 --> 00:00:17.340
Falls City Council. We have six of the seven members here and everybody who

00:00:17.340 --> 00:00:44.060
would like to join us in the Pledge of Allegiance please stand. Travis do we have

00:00:44.060 --> 00:00:48.340
any amendments to the agenda this evening? Madam Vice Mayor members the

00:00:48.340 --> 00:00:54.180
Council staff would ask for an addition of one member to be included one item to

00:00:54.180 --> 00:01:03.520
be included, and that is the city's commitment to a safer grant which stands for Staffing for

00:01:03.520 --> 00:01:13.430
Adequate Fire and Emergency Response personnel. The safer grant requires us to fund the individuals

00:01:13.430 --> 00:01:19.390
that we would bring on that were requesting for a 36 month period because this would encumber

00:01:19.390 --> 00:01:25.630
funds in future years we wanted to get counsel's commitment prior to submitting to the grant.

00:01:25.630 --> 00:01:31.230
We are asking tonight as opposed to next week because this requirement just came up

00:01:31.230 --> 00:01:37.230
and was made aware of it and the grant applications do this Friday.

00:01:37.230 --> 00:01:42.520
So we want to put it on the agenda tonight to have the conversation out of the debate.

00:01:42.520 --> 00:01:45.760
So would it be an item of consideration?

00:01:45.760 --> 00:01:50.760
It would be an item of consideration and we would move it to item D as in dog.

00:01:50.760 --> 00:01:51.760
Thank you very much.

00:01:51.760 --> 00:01:59.860
Motion by Chris Tuckington, seconded by Suzanne Moten.

00:01:59.860 --> 00:02:00.860
Suzanne Moten.

00:02:00.860 --> 00:02:06.000
I changed her last name.

00:02:06.000 --> 00:02:15.200
Does Sharon Roll call vote please?

00:02:15.200 --> 00:02:16.200
Suzanne Hockington?

00:02:16.200 --> 00:02:17.200
Yes.

00:02:17.200 --> 00:02:18.200
Nikki Boyd?

00:02:18.200 --> 00:02:19.200
Yes.

00:02:19.200 --> 00:02:20.200
Don Bambar.

00:02:20.200 --> 00:02:22.200
Chris Hockington?

00:02:22.200 --> 00:02:23.200
Yes.

00:02:23.200 --> 00:02:24.200
Greg Lanting?

00:02:24.200 --> 00:02:25.200
Yes.

00:02:25.200 --> 00:02:26.200
Christopher Reed?

00:02:26.200 --> 00:02:27.200
Yes.

00:02:27.200 --> 00:02:38.630
Ruth Pierce?

00:02:38.630 --> 00:02:52.700
carries 6 to 0. Proclamation is Arbor Day. Earth Day was Earth Day Sunday.

00:02:52.700 --> 00:03:04.180
Arbor Day Proclamation, whereas in 1872, J. Sterling Morton proposed to the Nebraska

00:03:04.180 --> 00:03:09.060
Board of Agriculture that a special day be set aside for the planting of trees,

00:03:09.700 --> 00:03:15.700
and whereas this holiday called Arbor Day was first observed with the planting of more than

00:03:15.700 --> 00:03:21.380
in a million trees in Nebraska, and whereas Arbor Day is now observed throughout the nation

00:03:21.380 --> 00:03:27.780
and the world, and whereas trees can reduce the erosion of our precious topsoil by wind

00:03:27.780 --> 00:03:35.580
and water, cut heating and cooling costs, moderate the temperature, clean the air, produce oxygen,

00:03:35.580 --> 00:03:42.820
and provide habitat for wildlife, and whereas trees are a renewable resource giving us paper,

00:03:42.820 --> 00:03:49.540
for our homes, fuel for our fires, and countless other wood products, and whereas trees in our

00:03:49.540 --> 00:03:56.820
city increase property values, enhance the economic vitality of business areas, and beautify

00:03:56.820 --> 00:04:03.220
our community. And whereas trees wherever they are planted are a source of joy and spiritual

00:04:03.220 --> 00:04:10.500
renewal. Now therefore, I, Sean Verger, Mayor of the City of Twin Falls, do hereby proclaim

00:04:10.500 --> 00:04:17.700
Friday, April 27, 2018, as Arbor Day in the City of Twin Falls, and I urge all

00:04:17.700 --> 00:04:22.640
citizens to celebrate Arbor Day and to support efforts to protect our trees and

00:04:22.640 --> 00:04:28.980
woodlands. And further, I urge all citizens to plant trees to gladden the heart and

00:04:28.980 --> 00:04:32.980
promote the well-being of this and future generations,

00:04:32.980 --> 00:04:38.860
it's dated the 23rd day of April signed by the mayor. I'd like to present this to

00:04:38.860 --> 00:05:01.340
our parks and recreation director with the city's

00:05:01.340 --> 00:05:06.460
Arbor Day celebration will be held at 4 p.m. on Friday, April

00:05:06.460 --> 00:05:12.220
20th. Oh boy. Great, so thank you. At 4 p.m. at Oregon Trail

00:05:12.220 --> 00:05:17.780
Youth Complex, we partner with cactus peats, always makes a

00:05:17.780 --> 00:05:20.820
donation for a couple of trees and bring a bunch of

00:05:20.820 --> 00:05:25.300
volunteers out and we invite anybody to join us out there at

00:05:25.300 --> 00:05:31.300
and we'll read the proclamation and this is our 20th year as a tree city so that's

00:05:31.300 --> 00:05:39.700
kind of a neat thing to do so we'll get our award for our for our for our tree city USA and then we'll have plenty of

00:05:39.700 --> 00:05:49.690
shovels to have people help us plant some trees. Thank you very much. At this time it is an opportunity

00:05:50.940 --> 00:05:56.060
for general public input if there's anyone who wishes to speak on an item that is not on the

00:05:56.060 --> 00:06:00.460
this evening's agenda. Please come down and state your name and whether you live

00:06:00.460 --> 00:06:20.900
or own property in the city. I'm on down. I'm not sure that one is really working.

00:06:20.900 --> 00:06:30.050
Has it been fixed? It is. Oh, here. No. Okay. Thanks. I'm Terry Edwards. I own property

00:06:30.050 --> 00:06:34.410
in Twin Falls. I have a question and I might not be in the right location, but

00:06:34.410 --> 00:06:41.930
under general public input, her items not on the agenda. Does that include what Travis

00:06:41.930 --> 00:06:50.340
just talked about. No, that comes under under art. There are any amendments to the agenda item number three.

00:06:50.340 --> 00:06:57.950
Okay. Well, can I speak on it then at this time? I guess what I'm trying to get at is I'd like a little bit more

00:06:57.950 --> 00:07:06.950
clarification if this is an obligation for the city to expend expenditures past the grant period of the safe program.

00:07:06.950 --> 00:07:12.610
I'd like to know a little bit more details about the program and what kind of financial

00:07:13.910 --> 00:07:22.670
Requirement it would be for the city. Also. I would like in the future that any grants that we get that we get the full detail of the grant

00:07:22.670 --> 00:07:27.300
And the city's obligation for that grant. Does that make sense?

00:07:28.500 --> 00:07:31.820
We get grants and everybody's old clapping their hands

00:07:31.820 --> 00:07:36.580
but then when the grant goes away then we have to foot the bill generally and I

00:07:36.580 --> 00:07:40.380
would like to know what the details would be on that if there's any grants

00:07:40.380 --> 00:07:45.300
that we get that have long-term obligations that encumber the city in

00:07:45.300 --> 00:07:49.780
any way I would like to know that up from when those grants are presented and

00:07:49.780 --> 00:07:55.660
accepted. So, Madam Vice Mayor, Mr. Edwards this is going to be discussed on

00:07:55.660 --> 00:08:01.620
the agenda under items of consideration 7D isn't up and I will be more than

00:08:01.620 --> 00:08:06.620
I'm happy to address all of your questions to my best ability at that point in time.

00:08:06.620 --> 00:08:10.620
Okay, so I will be able to get up and ask you some additional questions.

00:08:10.620 --> 00:08:14.620
That will be up to the chair of the meeting as to whether that should be able to participate.

00:08:14.620 --> 00:08:20.620
Yeah, I was going to say it's not a public hearing, but often we have somebody who has questions, so that's fine.

00:08:20.620 --> 00:08:23.620
And I have another question.

00:08:23.620 --> 00:08:24.620
Yes.

00:08:24.620 --> 00:08:30.620
While I'm talking here, on the back of this is public input procedures, but I don't see any statements saying that if it's...

00:08:30.620 --> 00:08:37.240
If it's on the agenda, we can't speak about it.

00:08:37.240 --> 00:08:40.220
You said, when you mentioned and made the announcement

00:08:40.220 --> 00:08:44.620
of general public input for items not on the agenda,

00:08:44.620 --> 00:08:48.260
where does that, where is that indicated in our code

00:08:48.260 --> 00:08:50.780
or on this public input procedures?

00:08:50.780 --> 00:08:56.290
Well, that is our general standard of operation in that.

00:08:56.290 --> 00:08:59.250
If it's on the agenda, of course we're going to talk about it.

00:08:59.250 --> 00:09:03.950
And so if somebody has something that isn't on the agenda,

00:09:03.950 --> 00:09:05.910
where would we place it on the agenda?

00:09:05.910 --> 00:09:08.350
So that's why we call it general public input.

00:09:08.350 --> 00:09:12.190
So that gives people an opportunity to come up and say

00:09:12.190 --> 00:09:15.550
something or ask a question that's not on the agenda,

00:09:15.550 --> 00:09:18.510
because we follow our agenda as a order of rule.

00:09:18.510 --> 00:09:19.750
I understand that.

00:09:19.750 --> 00:09:22.950
OK.

00:09:22.950 --> 00:09:26.230
This question really is, what are the rules of the public speaking

00:09:26.230 --> 00:09:28.510
during the items of consideration as opposed

00:09:28.510 --> 00:09:30.350
to the public hearings?

00:09:30.350 --> 00:09:32.350
I believe so, I just want to add a different answer.

00:09:32.350 --> 00:09:35.350
And the answer is, it's up to the city council.

00:09:35.350 --> 00:09:38.350
You don't have a right to speak unless they recognize you.

00:09:38.350 --> 00:09:39.350
Allow you to speak.

00:09:39.350 --> 00:09:43.350
You have no right statutory or under code on items of consideration.

00:09:43.350 --> 00:09:50.350
But as the acting mayor just said, I think frequently want that information from the public.

00:09:50.350 --> 00:09:55.520
So you don't have the right to, but they may allow you to.

00:09:55.520 --> 00:09:59.520
And that was my question when he brought that up for items of consideration,

00:09:59.520 --> 00:10:02.600
because it's a slam dunk tonight to get this done

00:10:02.600 --> 00:10:06.000
because apparently he needs to submit that request

00:10:06.000 --> 00:10:14.470
or that approval for that to make a decision on it tonight

00:10:14.470 --> 00:10:18.970
and it leaves a consideration item for consideration, correct?

00:10:18.970 --> 00:10:19.810
Yes.

00:10:19.810 --> 00:10:20.930
Okay, so it can't be discussed

00:10:20.930 --> 00:10:22.250
because it wasn't somewhere else

00:10:22.250 --> 00:10:24.760
on the agenda prior to tonight.

00:10:24.760 --> 00:10:28.720
I believe he believes that this is sneaking in

00:10:28.720 --> 00:10:32.200
under an item that doesn't allow public input.

00:10:32.200 --> 00:10:38.200
The only items that go on public hearings are those items that statutorily require public hearings.

00:10:38.200 --> 00:10:46.740
So whether this was on a regular agenda or not, it would appear on consideration and not the six o'clock calendar for this.

00:10:46.740 --> 00:10:51.740
Does it this encumber and cost the city some money and it is a budget item?

00:10:51.740 --> 00:10:56.740
Well, actually we're going to have a presentation by Travis and we'll get all the details.

00:10:56.740 --> 00:11:03.420
details. The only reason it came up is something changed in the procedure and now the applications

00:11:03.420 --> 00:11:27.390
are due on Friday. Okay. Yeah. You're welcome. Council wishes on the consent calendar. Second.

00:11:27.390 --> 00:11:44.040
Motion by Chris Reed and seconded by Ruth Pierce. Any questions? Go call vote please.

00:11:44.040 --> 00:11:45.040
Thank you, boy.

00:11:45.040 --> 00:11:46.330
Yes.

00:11:46.330 --> 00:11:47.330
Chris Hockington.

00:11:47.330 --> 00:11:48.330
Yes.

00:11:48.330 --> 00:11:49.330
Greg Lanting.

00:11:49.330 --> 00:11:50.330
Yes.

00:11:50.330 --> 00:11:51.330
Christopher Reed.

00:11:51.330 --> 00:11:52.330
Yes.

00:11:52.330 --> 00:11:53.330
Chris Pierce.

00:11:53.330 --> 00:11:54.330
Yes.

00:11:54.330 --> 00:11:56.550
Zann Hocking.

00:11:56.550 --> 00:11:57.550
Yes.

00:11:57.550 --> 00:12:13.680
That's a six to zero.

00:12:13.680 --> 00:12:14.680
Thank you.

00:12:14.680 --> 00:12:15.680
Items of consideration.

00:12:15.680 --> 00:12:21.280
Our first one is a presentation on the Twin Falls County Emergency Operations Plan with

00:12:21.280 --> 00:12:25.680
the request for a mayor signature on memorandum of understanding.

00:12:25.680 --> 00:12:27.680
We have Jackie Fry.

00:12:27.680 --> 00:12:28.680
Welcome.

00:12:28.680 --> 00:12:30.230
Thank you.

00:12:30.230 --> 00:12:58.600
Yes, I am the coordinator for the Office of Emergency Management and I do appreciate your time to the Twin Falls City Council to address the signature that I would like to ask you consider to sign, which would be the number and understanding to accept the Twin Falls County plan, which as you sign a tour to be a party to the plan, which is mirrored after the natural

00:12:58.600 --> 00:13:02.480
National Response Plan is standard operating procedures that our first

00:13:02.480 --> 00:13:08.000
responders use to support an event or incident within Twin Falls County. There

00:13:08.000 --> 00:13:13.280
is no cost for your participation. At this time, I have a working relationship

00:13:13.280 --> 00:13:18.280
with your first-responding agencies and over the last 21 years that I've been in

00:13:18.280 --> 00:13:24.160
this job, which I deeply appreciate. But one of the things that I thought would be

00:13:24.160 --> 00:13:31.120
very productive for each of you. I had visited with Brian Pike, was to give you

00:13:31.120 --> 00:13:36.360
a brief overview of what I do and then actually show you a list of the items

00:13:36.360 --> 00:13:40.040
that I've been able to support your city with with your first-responding

00:13:40.040 --> 00:13:46.720
agencies that have actually been no breakdown for what I would say share

00:13:46.720 --> 00:13:52.920
cost for you. It is of course federal funds but it is grants that I pursued on

00:13:52.920 --> 00:13:54.680
on behalf of your agencies.

00:13:54.680 --> 00:13:58.600
So I do a number of training and exercise

00:13:58.600 --> 00:14:01.440
that I incorporate your first responders with,

00:14:01.440 --> 00:14:05.040
as well as elected officials, or as well as any party

00:14:05.040 --> 00:14:08.640
that you have within your community or city.

00:14:08.640 --> 00:14:11.160
Citizens have been invited as well as those

00:14:11.160 --> 00:14:13.000
that are from your public works,

00:14:14.000 --> 00:14:17.280
fired upon law enforcement, any of those realms.

00:14:17.280 --> 00:14:21.220
And those also have come at no cost to your city.

00:14:21.220 --> 00:14:26.140
The incident command system is a methodology that we follow, all of the

00:14:26.140 --> 00:14:30.680
first responding agencies address that, and so that we can coordinate, there's a

00:14:30.680 --> 00:14:35.300
common practice to be able to respond to an incident. The eight cities that would

00:14:35.300 --> 00:14:41.740
sign on to the plan are the eight cities under Twin Falls County. At this time here

00:14:41.740 --> 00:14:47.980
one of two that are left to sign, but again it envelop or I guess I should say

00:14:47.980 --> 00:14:51.800
and encompasses that opportunity for us to work as partners

00:14:51.800 --> 00:14:54.060
and to be able to be team players,

00:14:54.060 --> 00:14:56.100
to be able to support incidents,

00:14:56.100 --> 00:15:00.690
or I guess I would say disasters within the county.

00:15:00.690 --> 00:15:02.970
We certainly don't want to address that,

00:15:02.970 --> 00:15:06.170
but we've seen the 2017 flooding issues.

00:15:06.170 --> 00:15:09.010
We've seen that things that have happened.

00:15:09.010 --> 00:15:11.090
With the state emergency relief funding,

00:15:11.090 --> 00:15:14.170
we're seeing the city be able to receive some funding

00:15:14.170 --> 00:15:16.490
that can come in to help support your infrastructure

00:15:16.490 --> 00:15:18.650
in the city, such as the streets

00:15:18.650 --> 00:15:27.170
the roads. So those are all kind of positive things. I also maintain a shelter board resource

00:15:27.170 --> 00:15:32.410
inventory, critical infrastructure list at the state. So if something happens, we're

00:15:32.410 --> 00:15:37.410
able to set up shelters with the American Red Cross, manage evacuations, and be able

00:15:37.410 --> 00:15:43.610
to do those things to promote life safety. So all of those things are part of the, part

00:15:43.610 --> 00:15:48.290
of those, I would say, mission for me, are the things that I believe strongly

00:15:48.290 --> 00:15:52.490
and to make my program very positive. I'm working right now on a number of

00:15:52.490 --> 00:15:56.050
whether it be school safety plans, it be plans for our functional needs

00:15:56.050 --> 00:16:02.370
populations are with the Humane Society also with pets and being able to just

00:16:02.370 --> 00:16:08.210
manage all of these rounds if something happened within the county. So, while my

00:16:08.210 --> 00:16:13.090
job is very diverse and why it encompasses a lot of things, I have deeply

00:16:13.090 --> 00:16:17.290
appreciate it, the opportunity to work with all of you and your first

00:16:17.290 --> 00:16:22.090
responding agencies, and be able to have the support needed to continue

00:16:22.090 --> 00:16:27.610
that. What I believe is a very positive relationship. And so that's really why

00:16:27.610 --> 00:16:32.790
I was here today. I don't know if Mitch would be able to, well, present

00:16:32.790 --> 00:16:38.090
that. But I know I have limited time, so I'm trying to be very professional.

00:16:38.090 --> 00:16:42.690
But I do want to share with you in the 21 years that I've been in this job

00:16:42.690 --> 00:16:51.050
After 9-11, it was critical that as a nation, we really see that the resources needed to sustain

00:16:51.050 --> 00:16:54.730
and to promote safety within our country.

00:16:54.730 --> 00:16:58.710
And the federal grants that were released to the county through pass-through funds from

00:16:58.710 --> 00:17:04.650
the state of Idaho, Idaho Office of Emergency Management, is actually done by a population.

00:17:04.650 --> 00:17:11.130
And I have been very fortunate to have this job for 21 years, but I feel strongly that

00:17:11.130 --> 00:17:19.590
those funds should be used in a manner needed to support all agencies that help promote life

00:17:19.590 --> 00:17:27.050
safety and also will help respond to manage and be able to recover from an incident or

00:17:27.050 --> 00:17:28.050
disaster.

00:17:28.050 --> 00:17:34.410
So the first grant actually or the first opportunity I had was to work with your bomb

00:17:34.410 --> 00:17:40.730
squad for the City of Twin was our very first project and it was a $179,000 project to get

00:17:40.730 --> 00:17:45.950
the robot which you're still using now which I was just able to if you look at

00:17:45.950 --> 00:17:51.290
the very bottom project be able to work with JPO Donald and the team that you have

00:17:51.290 --> 00:17:57.530
which again I have nothing but respect for to get a new robot the laptop and

00:17:57.530 --> 00:18:02.170
portable x-ray machine so that it's smaller it's not as cumbersome and they're

00:18:02.170 --> 00:18:06.410
able to respond to events I am having the hundred first civil support team

00:18:06.410 --> 00:18:12.410
come into our county tomorrow. Over the years we've been very blessed. They're an incredible resource

00:18:12.410 --> 00:18:18.010
and they will be working with your bomb squad, law enforcement, fire and our hospital tomorrow

00:18:18.890 --> 00:18:26.170
to be able to really work on an event and use those resources to help support that. So

00:18:26.890 --> 00:18:33.530
it's been really a neat opportunity. I've as you can see I've done things for the engineering department,

00:18:33.530 --> 00:18:39.130
here again your police and bomb squad, your water department, fire police,

00:18:39.130 --> 00:18:43.970
radios, a lot of the radios that we've needed have been to support, again

00:18:43.970 --> 00:18:50.610
communication during an incident or disaster to promote life safety, and then

00:18:50.610 --> 00:18:59.170
also now moving on down with current purchase. So totally I've been able to

00:18:59.170 --> 00:19:10.170
support your city was $627,372.28, which I can tell you, none of the funding was, I guess

00:19:10.170 --> 00:19:15.210
what I would say as it was gifted to your city or your departments, there was no matching

00:19:15.210 --> 00:19:21.850
funds required, which I think is a tremendous blessing with the way that we see our budgets

00:19:21.850 --> 00:19:26.770
and we see a cost to be able to continue those programs.

00:19:26.770 --> 00:19:31.090
this I believe offsets money that you would have to use from your general fund

00:19:31.090 --> 00:19:38.490
for these products we're able to support them. This is along with also our Twin

00:19:38.490 --> 00:19:43.570
Falls Sheriff's Department. The eight cities we have five law enforcement

00:19:43.570 --> 00:19:49.530
departments. I have four fire departments. I have public works departments that we've

00:19:49.530 --> 00:19:57.650
put fencing and been able to do projects for and so not that I'm here to please

00:19:57.650 --> 00:20:02.250
that I don't come to you because I'm arrogant. I think over the years that I've

00:20:02.250 --> 00:20:06.170
been in my job people have questioned or wanted to know really what I've been

00:20:06.170 --> 00:20:09.930
able to do and I thought it was important and Brian did too that I really

00:20:09.930 --> 00:20:16.010
addressed those things with each. So I just wanted to give you that bit of

00:20:16.010 --> 00:20:21.570
information. I am very excited to work with your new fire chief. I've done an

00:20:21.570 --> 00:20:27.290
incredible job of firing him and we have already met several times and I believe

00:20:27.290 --> 00:20:33.730
that the City of Twin with the growth we're seeing in population, transportation

00:20:33.730 --> 00:20:39.730
issues and stuff. I want to I guess pledge to you or commit to you that I

00:20:39.730 --> 00:20:43.970
will continue to support your community and continue to work with your departments.

00:20:43.970 --> 00:20:51.070
So, thank you so much for the time and I hope that you will consider signing the MOU.

00:20:51.070 --> 00:20:52.070
Susan Hawkins.

00:20:52.070 --> 00:20:56.970
Jackie, I just want to thank you so much for all you do, not just the financial part of

00:20:56.970 --> 00:21:02.270
it, but your monthly meetings, every month I learn something new that I don't know, and

00:21:02.270 --> 00:21:06.910
the way that you go to other things, the joining forces and wherever you can be a support

00:21:06.910 --> 00:21:12.230
in this community, it's noted and I'm very thankful for you and all you do and give back

00:21:12.230 --> 00:21:13.230
to this area.

00:21:13.230 --> 00:21:14.230
So thank you.

00:21:14.230 --> 00:21:18.950
You do a very good job by attending one of your new elected official meetings.

00:21:18.950 --> 00:21:25.490
Actually, I attended with Suzanne, and it was really eye-opening, and it's very impressive

00:21:25.490 --> 00:21:28.750
to learn, and it was in our packet today if you didn't really read.

00:21:28.750 --> 00:21:30.390
It was very lengthy, right?

00:21:30.390 --> 00:21:33.830
A lot of pages there, I'm hundreds.

00:21:33.830 --> 00:21:42.210
No, that's good, but it really showed the breakdown of the chain of command, and it's

00:21:42.210 --> 00:21:43.210
very specific.

00:21:43.210 --> 00:21:50.210
the exercises that you do at the class are really, really good if anybody else, you know,

00:21:50.210 --> 00:21:56.350
touch Jackie Cuchel, give you the schedule and you can attend one of those.

00:21:56.350 --> 00:22:08.410
Thank you very much. Does anybody else have any questions?

00:22:08.410 --> 00:22:15.510
Request for the mayor's signature on the memorandum of understanding.

00:22:15.510 --> 00:22:21.800
We have a second made by Chris Reed, the motion made by Chris Reed in the second by Greg Lanthie.

00:22:21.800 --> 00:22:23.800
Do you have any questions?

00:22:23.800 --> 00:22:26.980
Chair Enroll, call vote please.

00:22:26.980 --> 00:22:44.810
Chris Hockington, Greg Lanting, Christopher Reed, Chris Pierce, Zann Hockington, Nicky Boyd.

00:22:44.810 --> 00:22:47.070
Yes. Thank you so much.

00:22:47.070 --> 00:22:52.160
You're welcome. Motion passes 6 to 0. Thank you, Jackie.

00:22:52.160 --> 00:23:03.480
Next, we have a request to sign a contract with JAB engineers for the remainder of the Canyon Springs Road.

00:23:03.480 --> 00:23:13.480
Project Design and Construction Services in the amount of $343,900 and Troy B. Tech is going to talk to us.

00:23:13.480 --> 00:23:30.080
Good Council Members, I'm going to break this into two parts tonight. One, I'm here to talk about a contract with J.E.B. Engineers.

00:23:30.080 --> 00:23:37.400
There's a contract that we would like to re-execute with J.E.B. Engineers from the amount of $343,900.

00:23:37.400 --> 00:23:44.020
I'll tell you a little bit about our processes. On September of 2015, we executed a contract.

00:23:44.020 --> 00:23:49.620
I came before a council before that. Not authorization to execute a contract with JB. We did that.

00:23:49.620 --> 00:23:57.200
And they began designing the public process, so we all remember, so they did it well.

00:23:57.200 --> 00:24:04.420
Jay runs from October, so come October, we're into one next year, starting in September.

00:24:04.420 --> 00:24:31.970
So I immediately have to income funds to keep them. The funds are there. I talked with Public Finance Department.

00:24:31.970 --> 00:24:50.860
They were set aside, slid, we would like the slide on that, budget is budgeted in this year's cycle in 2018 cycle for $700,000 out of streets phones, and $1,000,000 in a waste water treatment plan.

00:24:50.860 --> 00:24:57.120
That is enough for the construction. It's not enough to cover the construction and the design side of it.

00:24:57.120 --> 00:25:09.390
So if you have the option of saying no tonight, we can go forward with our e-budget of funds, but it means the project shrinks a little bit hard for us to complete it as we're listening to do.

00:25:09.390 --> 00:25:22.560
to do. That brings me to get a discussion tonight. Originally part of the public process, option

00:25:22.560 --> 00:25:47.430
six, option six is essentially a wide zero down to 28 feet. That puts in that grade sidewalk

00:25:47.430 --> 00:26:04.220
about eight feet wide. That's all that. And it's 4.8 down on January. And staff's recommendations

00:26:04.220 --> 00:26:17.180
on the public works came with council and said roadways are really hard. Takes away from

00:26:17.180 --> 00:26:22.500
away from other projects, in this case it really took away from this project. It doesn't

00:26:22.500 --> 00:26:28.170
leave me, it doesn't destroy this project. Coming up before we eat tonight is to reaffirm

00:26:28.170 --> 00:26:36.800
that we believe all time before is still, it doesn't address the walkway portion of the

00:26:36.800 --> 00:27:13.200
present, create that sidewalk. So, on a presentation tonight, going forward with our schedule, finish

00:27:13.200 --> 00:27:37.560
design, the engineering. Be 30th, I'll talk to the public and say, you should expect to

00:27:37.560 --> 00:28:03.200
out there. There's also going to be during the residence of that notice of a word on August 15th,

00:28:03.200 --> 00:28:08.240
then we are trying to hold off the notices to proceed to around Labor Day. It's a little

00:28:08.240 --> 00:28:12.840
little Italy in the summer, but when kids around here start to get back to school, because

00:28:12.840 --> 00:28:39.120
using the road as long as we can, scaling up the rocks half the runway, it'll be flagged

00:28:39.120 --> 00:29:19.940
during the day, lights drop that on the road. Some of this items is a guy for the council.

00:29:19.940 --> 00:29:31.140
This is originally I presented an active restraint system and it will show you what that looks like.

00:29:31.140 --> 00:29:40.160
This is an active restraint system for the rock wall.

00:29:40.160 --> 00:29:44.160
This is what I permitted, or I present to you guys previously.

00:29:44.160 --> 00:29:50.060
I'm recommending a slight change from that to a drink method.

00:29:50.060 --> 00:29:56.310
The reason is this stuff is four times the cost of their alternative areas.

00:29:56.310 --> 00:30:17.920
I would recommend proceeding with this tree system just due to the amount of flee restraint

00:30:17.920 --> 00:30:25.520
and cost savings of this.

00:30:25.520 --> 00:30:36.410
Others are very much of an asset to our town there so I'm trying to make the impact as low

00:30:36.410 --> 00:30:46.480
as possible but still do the job that we have set us on.

00:30:46.480 --> 00:30:54.440
So, tonight I engineered.

00:30:54.440 --> 00:31:05.980
We have some Greg Lanting.

00:31:05.980 --> 00:31:22.360
is right. So we're bringing all of that down or we just bringing out what we feel is unsteady or unstable is just a better term.

00:31:22.360 --> 00:31:57.590
The, what I've just told from Strata via JUB is a, there's a particular aspect of that system.

00:31:57.590 --> 00:32:00.570
Talking to.

00:32:00.570 --> 00:32:09.570
This actually is a legal question as much as engineering. If we proceed with this road improvement,

00:32:09.570 --> 00:32:13.670
without I guess I don't for us when we're talking about 34

00:32:15.030 --> 00:32:22.280
That's uh, we're not providing an improvement in a safe safety improved walkway

00:32:23.370 --> 00:32:25.370
writer the lane

00:32:25.570 --> 00:32:27.570
is an increased liability

00:32:28.370 --> 00:32:34.370
Over this I say that because five years that for years for exercise, and I've had a rock actually drop

00:32:34.850 --> 00:32:38.970
The lady was coming down. I was coming up and we were on opposite sides of the road

00:32:38.970 --> 00:32:41.670
I mean, rocks can actually fall.

00:32:41.670 --> 00:32:45.950
They can kill people if they hit you from that height.

00:32:45.950 --> 00:32:52.950
So, with this action increase or liability over what we might expect it to be anyway.

00:32:52.950 --> 00:32:57.040
I don't really expect any build.

00:32:57.040 --> 00:33:02.560
I'll just start with people that use that for recreational purposes or using it for free.

00:33:02.560 --> 00:33:12.920
We have, we can take advantage of their recreational use statute to provide in terms of vehicles that might get hit.

00:33:12.920 --> 00:33:23.880
This makes it safer. I would say reduces our increase signage of any help of that warning people of...

00:33:23.880 --> 00:33:30.520
I was just as control. I thought we had to put a sign up and you probably know better than I do

00:33:30.520 --> 00:33:37.360
that a sign up there warning the walkers about the... I didn't know if we need to pull over lawyer

00:33:37.360 --> 00:33:47.330
but when every 20 feet or so. I think we have the country when you drive next to areas like this.

00:33:47.330 --> 00:33:59.280
you will see one sign following Rock and everybody else thinks it's good enough so I would think it that

00:33:59.280 --> 00:34:06.560
Suzanne Hawkins, Troy, you showed us the two different versions of the mesh drape and you said there was a cost

00:34:06.560 --> 00:34:10.560
savings what is the cost difference between the two options?

00:34:10.560 --> 00:34:17.250
The active one is full cost.

00:34:17.250 --> 00:34:50.070
A question, or does that come to the bottom of the drape?

00:34:50.070 --> 00:34:55.070
How much open rock that's not being distracted from? How much is there?

00:34:55.070 --> 00:35:11.580
So it's going to be right near the bottom of it. There's rock catches in this area right here.

00:35:11.580 --> 00:35:16.580
This active one's way far away, but a good ass majority of places in the rock.

00:35:16.580 --> 00:35:21.580
This canerim sits above this location. Most of this area is the upper 2000 feet.

00:35:21.580 --> 00:35:26.960
In fact, it's 400 of the 1000 feet where this is really the dangerous portion

00:35:26.960 --> 00:35:35.730
towards the lower hairpin. It was existing talus, and it's kind of vegetated, and I think it's actually stable, isn't it?

00:35:35.730 --> 00:35:36.730
Sure.

00:35:36.730 --> 00:35:40.770
Listen.

00:35:40.770 --> 00:35:44.770
Cosmore puts a green merrier over everything.

00:35:44.770 --> 00:35:46.120
Yes.

00:35:46.120 --> 00:35:54.840
And this can still see and enjoy the beauty of the rock, and if something chipped off, it would catch it.

00:35:54.840 --> 00:35:55.840
It would.

00:35:55.840 --> 00:35:59.840
Yes, it would keep it on the inside, and then it actually falls to the bottom.

00:35:59.840 --> 00:36:01.840
It's just catch ditch right here.

00:36:01.840 --> 00:36:02.840
Not it.

00:36:02.840 --> 00:36:20.100
But those up with rocks and streets on every so often.

00:36:20.100 --> 00:36:22.140
Subsonded during the construction time,

00:36:22.140 --> 00:36:25.860
we're gonna upper-distute traffic.

00:36:25.860 --> 00:36:26.700
During the construction?

00:36:26.700 --> 00:36:27.540
Yes.

00:36:27.540 --> 00:36:29.700
It would be a recommendation not to allow pedestrian traffic.

00:36:29.700 --> 00:36:31.820
Thank you.

00:36:31.820 --> 00:36:37.700
So don't have to tell me twice I'm an Irish.

00:36:37.700 --> 00:36:38.860
Chris, did you have anything else?

00:36:38.860 --> 00:36:40.760
All right.

00:36:40.760 --> 00:36:42.920
I would motion that we authorize contract

00:36:42.920 --> 00:36:45.880
but JUB for the remainder of the King insurance.

00:36:45.880 --> 00:36:49.560
Well, a road project design and construction services

00:36:49.560 --> 00:36:55.680
in the amount of 343,900 dollars, following alternative four, as outlined.

00:36:55.680 --> 00:37:07.860
Seconded by Greg Lantine, request to sign a contract with JUB Engineers for the remainder

00:37:07.860 --> 00:37:13.000
of the Canyon Springs Road Project Design and construction services in the amount of

00:37:13.000 --> 00:37:30.220
343, 9. Other questions are just Chris Hockinton.

00:37:30.220 --> 00:37:31.220
Yes.

00:37:31.220 --> 00:37:32.220
Greg Lantine.

00:37:32.220 --> 00:37:33.220
Yes.

00:37:33.220 --> 00:37:34.220
Christopher W.

00:37:34.220 --> 00:37:35.220
Yes.

00:37:35.220 --> 00:37:36.220
Ruth Pierce.

00:37:36.220 --> 00:37:37.220
Yes.

00:37:37.220 --> 00:37:39.740
Nikki Boyd. Yes.

00:37:39.740 --> 00:37:41.740
I'll she can carry six to zero.

00:37:41.740 --> 00:37:58.580
Thank you, Troy.

00:37:58.580 --> 00:38:06.580
It's to adopt an ordinance in minting city code 973 and 976C regarding off street parking

00:38:06.580 --> 00:38:10.760
houses in Murray.

00:38:10.760 --> 00:38:12.760
Council citizens.

00:38:12.760 --> 00:38:20.550
Adam, we brought up last week to amend our code to the past program that we had previously.

00:38:20.550 --> 00:38:27.540
All these laws and our laws has meanings in the last few days.

00:38:27.540 --> 00:38:32.260
with me today and in the last week with our engineering staff and streets to talk

00:38:32.260 --> 00:38:40.300
about to roll this out and just maintenance and responsibility for what so

00:38:40.300 --> 00:38:45.220
we have to plan in place this is the streets our division's busy time so

00:38:45.220 --> 00:39:03.340
we'll take some time to kind of keep going but not so wishes we have a

00:39:03.340 --> 00:39:09.230
separate ordinance or we just doing these two here this is an amendment to

00:39:09.230 --> 00:39:17.530
This ordinance number 2018-12.

00:39:17.530 --> 00:39:37.230
I move that we suspend the rules on place ordinance 2018-12 and 3rd and final by title only.

00:39:37.230 --> 00:39:38.840
Second.

00:39:38.840 --> 00:39:45.600
Motion made by Greg Lanting, seconded by Suzanne Hopkins.

00:39:45.600 --> 00:39:47.600
Would you read the title please?

00:39:47.600 --> 00:39:50.600
No, I'm sorry, that comes next.

00:39:50.600 --> 00:39:51.600
Please.

00:39:51.600 --> 00:40:04.030
Greg Lanting.

00:40:04.030 --> 00:40:05.030
Yes.

00:40:05.030 --> 00:40:06.030
Christopher Reed.

00:40:06.030 --> 00:40:07.030
Yes.

00:40:07.030 --> 00:40:08.030
Yes.

00:40:08.030 --> 00:40:09.030
Yes.

00:40:09.030 --> 00:40:10.030
Yes.

00:40:10.030 --> 00:40:11.030
Yes.

00:40:11.030 --> 00:40:12.030
Yes.

00:40:12.030 --> 00:40:13.610
Yes.

00:40:13.610 --> 00:40:14.610
Yes.

00:40:14.610 --> 00:40:15.610
Yes.

00:40:15.610 --> 00:40:16.610
Yes.

00:40:16.610 --> 00:40:19.050
Yes.

00:40:19.050 --> 00:40:20.050
Yes.

00:40:20.050 --> 00:40:21.050
Yes.

00:40:21.050 --> 00:40:22.050
Yes.

00:40:22.050 --> 00:40:23.050
Yes.

00:40:23.050 --> 00:40:24.050
Yes.

00:40:24.050 --> 00:40:25.050
Yes.

00:40:25.050 --> 00:40:26.050
Yes.

00:40:26.050 --> 00:40:27.050
Yes.

00:40:27.050 --> 00:40:28.050
Yes.

00:40:28.050 --> 00:40:29.050
Yes.

00:40:29.050 --> 00:40:30.050
Yes.

00:40:30.050 --> 00:40:31.050
Yes.

00:40:31.050 --> 00:40:32.050
Yes.

00:40:32.050 --> 00:40:33.050
Yes.

00:40:33.050 --> 00:40:34.050
Yes.

00:40:34.050 --> 00:40:35.050
Yes.

00:40:35.050 --> 00:40:36.050
Yes.

00:40:36.050 --> 00:40:37.050
Yes.

00:40:37.050 --> 00:40:38.050
Yes.

00:40:38.050 --> 00:40:43.450
passes. Be it ordained by the mayor and council of the city of Twin Falls, Idaho.

00:40:43.450 --> 00:41:10.260
Made by Chris talking in second by Greg Lamteen. Christopher Reed. Yes.

00:41:10.260 --> 00:41:16.820
Ruth Pierce. Yes. Suzanne Hawkins. Yes. Nicky Boyd. Yes. Chris Hockington. Yes.

00:41:16.820 --> 00:41:31.830
Greg Lamteen. Yes. Motion passes 6 to 0. Move to our one manager Travis Rothweiler.

00:41:31.830 --> 00:41:44.310
I think that if we move this here, it probably works a little bit better.

00:41:44.310 --> 00:41:52.370
So, Madam Vice Mayor, members of the City Council, first let me again apologize for bringing this item to you on short notice.

00:41:52.370 --> 00:42:05.370
We've been working through the fiscal year 2018-2019 budget, and as you know, we started with that process through our long-term planning process, which begins shortly after Christmas.

00:42:05.370 --> 00:42:17.370
And from that entire period, our long-term planning members work collectively to build a budget that we ultimately will present to you after the Fourth of July holiday.

00:42:17.370 --> 00:42:22.140
And we'll spend the entire summer having that conversation moving forward.

00:42:22.140 --> 00:42:30.140
One of the things that we've spent considerable time in our organization taking a look at is making sure that as we continue to grow as a community,

00:42:30.140 --> 00:42:34.860
that we have adequate staffing needs for all of our departments to be able to

00:42:34.860 --> 00:42:41.600
deploy all the services that are expected by our citizens. And about a year and a

00:42:41.600 --> 00:42:48.740
half ago we came to you and shared the importance of being a hard-safe community

00:42:48.740 --> 00:42:54.600
and the importance of working forward and going on emergency medical calls as

00:42:54.600 --> 00:42:58.740
opposed to going on only fire suppression calls which was a significant change

00:42:58.740 --> 00:43:03.700
to our organization and we felt that as a professional fire team, and if you're looking

00:43:03.700 --> 00:43:08.660
at modern day fire departments, responding to EMS calls is one of the first and foremost

00:43:08.660 --> 00:43:10.060
functions that we do.

00:43:10.060 --> 00:43:15.700
In fact, when we looked at the total call volume, and I think that as Chief Kenworthy

00:43:15.700 --> 00:43:21.180
shared with you in his report just last week, the total number of calls that we had went

00:43:21.180 --> 00:43:26.660
from 2,700 total incidents to over 5,500 total incidents.

00:43:26.660 --> 00:43:28.740
It wasn't that we had more fires.

00:43:28.740 --> 00:43:33.700
It's what we went to more and more calls for service.

00:43:33.700 --> 00:43:37.740
Calls for service to render aid to members of our community.

00:43:37.740 --> 00:43:40.900
So we started to take a look and our team has been looking

00:43:40.900 --> 00:43:42.820
at the total number of firefighters

00:43:42.820 --> 00:43:47.060
that we have on our team and inside of the city of Twin Falls.

00:43:47.060 --> 00:43:49.740
We have 39 line personnel.

00:43:49.740 --> 00:43:53.500
We break those line personnel into three distinct shifts,

00:43:53.500 --> 00:43:58.500
A, B, and C, and those three men or 13 man shifts.

00:44:00.060 --> 00:44:03.580
Sometimes, and most of the time, will drop to 12,

00:44:03.580 --> 00:44:05.820
and that is because we may have an illness,

00:44:05.820 --> 00:44:08.380
we may have a light duty, we have vacations,

00:44:08.380 --> 00:44:12.100
and so being able to staff those all the time

00:44:12.100 --> 00:44:14.340
gets to be fairly challenging,

00:44:14.340 --> 00:44:19.340
and so 95% of the time we run on 12 man companies.

00:44:19.340 --> 00:44:25.820
companies. It's important to recognize that NFPA standard 1710, which is the standard for

00:44:25.820 --> 00:44:30.940
operations and deployment for fire suppression operations, emergency medical operations, and

00:44:30.940 --> 00:44:38.220
special operations to the public by career firefighters recommend a minimum of 14 individuals

00:44:39.770 --> 00:44:46.730
all of the time. And so if you do the math and you say that we have 12 95 percent of the time

00:44:46.730 --> 00:44:53.530
and we are down to every shift, and we run three shifts, you can see that that is at least

00:44:53.530 --> 00:44:59.530
six firefighters that we would need to be able to function all of the time.

00:44:59.530 --> 00:45:06.300
In fact, Chief Kenworthy could probably share with you all of those details in terms of what

00:45:06.300 --> 00:45:12.060
it looks like, but NFP standard also basically says that we should, as a public entity, strive

00:45:12.060 --> 00:45:17.400
to have four managing companies all of the time and in order to be able to do

00:45:17.400 --> 00:45:21.180
that we started to take a look at the total number of firefighter positions that

00:45:21.180 --> 00:45:27.220
we would need in our upcoming FY budget and in the position justification sheet

00:45:27.220 --> 00:45:32.220
that has been submitted by Chief Kenworthy he is asking and has asked for five

00:45:32.220 --> 00:45:37.740
firefighters to be included in the FY 19 and 19 budget again which we will be

00:45:37.740 --> 00:45:44.380
presented to you. And unfortunately, we don't have the ability to pick and determine when

00:45:44.380 --> 00:45:50.560
we can submit for grants and grant applications have a cycle and the end of this grant cycle

00:45:50.560 --> 00:45:58.180
occurs this Friday. That's when you get the window to be able to submit to move forward

00:45:58.180 --> 00:46:02.820
for firefighters under the Safer Grant. And this is a grant that is very, very familiar

00:46:02.820 --> 00:46:08.540
to us as an organization, but not on the firefighter side. We've done this routinely

00:46:08.540 --> 00:46:12.020
on the police officer's side through cops grants.

00:46:12.020 --> 00:46:16.500
And it is the very, very similar program for firefighters

00:46:16.500 --> 00:46:22.140
in which we have the opportunity to add folks immediately

00:46:22.140 --> 00:46:25.140
to our organization to be able to assist

00:46:25.140 --> 00:46:28.740
with those deficiencies should we be selected.

00:46:28.740 --> 00:46:30.740
Remember, this is a competitive grant process

00:46:30.740 --> 00:46:33.740
and there's absolutely no guarantee

00:46:33.740 --> 00:46:37.500
that we will be successful in our approach.

00:46:37.500 --> 00:46:46.200
But our idea is that if we can get some assistance to cover the immediate need, then that's a real win for the community.

00:46:46.200 --> 00:46:49.660
And so one of the questions that Mr. Edwards asks is, is there a cost?

00:46:49.660 --> 00:46:52.740
Yes, absolutely. There's a cost.

00:46:52.740 --> 00:47:07.250
The cost is that the City of Twin Falls would be asking for the federal government to assist in offsetting a total cost of $354,230,000 for firefighters.

00:47:07.250 --> 00:47:20.160
The federal government pays 75% of those costs or $265,673 for the first two years.

00:47:20.160 --> 00:47:32.800
And then in year three, the city would receive 35% of the fully burdened costs of $123,981.

00:47:32.800 --> 00:47:38.080
And then in year four, the city of Twin Falls would be responsible for those firefighter

00:47:38.080 --> 00:47:44.000
positions for a total cost of $354,230.

00:47:44.000 --> 00:47:49.280
What we've done in those grants is that we've put in, again, that's the fully burdened cost.

00:47:49.280 --> 00:47:54.960
So that's the Percy cost, the health insurance costs, all of those costs that are known to

00:47:54.960 --> 00:47:55.960
us.

00:47:55.960 --> 00:47:58.600
There are some additional costs and I'll look back to the Chief, but I believe that these

00:47:58.600 --> 00:47:59.600
are just for Manning.

00:47:59.600 --> 00:48:04.080
It doesn't include the protective clothing that we've come associated with that.

00:48:04.080 --> 00:48:11.080
That total cost is approximately $22,500, which we move forward inside of the budget.

00:48:11.080 --> 00:48:19.080
And so what we're asking is the opportunity to hire individuals and help the federal government,

00:48:19.080 --> 00:48:25.080
namely FEMA, through Homeland Security, assist in the immediate deployment of those individuals,

00:48:25.080 --> 00:48:33.080
just as we've done for the COPS grants, to ensure that we can continue to safely and effectively offer fire services throughout our entire community.

00:48:33.080 --> 00:48:37.400
Chief Kenworthy is here to answer this specific and technical questions, but again, this is

00:48:38.120 --> 00:48:43.880
firefighter grants to assist on the line level to help us meet NFPA 1710.

00:48:47.100 --> 00:48:53.430
Whether or not we submit the grant or whether or not we're successful in the grant

00:48:54.390 --> 00:48:58.790
does not diminish the need for hiring additional firefighters.

00:48:58.790 --> 00:49:13.270
So we felt as a staff that it would be advantageous to our community to try to receive some federal assistance in hiring firefighters.

00:49:13.270 --> 00:49:16.780
That's the purpose of the grant that's here today.

00:49:16.780 --> 00:49:23.780
We plan on bringing this request before the Council for its ultimate consideration in July.

00:49:23.780 --> 00:49:35.780
Unfortunately, when we bring that request to you in July, it will not have the funding source necessarily attached to it if we are not successful in the grant.

00:49:35.780 --> 00:49:43.550
Our approach is that if we are able to hire the five individuals, they would be part of that grant process.

00:49:43.550 --> 00:49:48.550
process and if we're not, then we'd have to have that conversation about what to do to move forward.

00:49:48.550 --> 00:49:54.550
And it's, and the other options that we've taken look at is hiring three.

00:49:54.550 --> 00:49:58.550
So I can share with you those numbers for looking at hiring three,

00:49:58.550 --> 00:50:04.550
but really what we're trying to do is to make up those minimum manning standards of, of two officers,

00:50:04.550 --> 00:50:07.550
or two firefighters, excuse me, per shift.

00:50:07.550 --> 00:50:13.580
I'm happy to stand for any questions and I, as I understand it, Mr Edwards might have some additional questions

00:50:13.580 --> 00:50:22.540
to Madam Vice Mayor, so if you would want to have him have the opportunity to ask his

00:50:22.540 --> 00:50:27.460
questions, we would certainly as a staff stand ready for him. Thank you very much.

00:50:27.460 --> 00:50:33.500
Ms. Tocky, Ted, how's it going? The bottom effect is that we're increasing fire by

00:50:33.500 --> 00:50:38.900
up to five people should the grant be accepted, which will be a sliding

00:50:38.900 --> 00:50:45.820
scale of reduction in federal level and increasing over those four years yes

00:50:45.820 --> 00:50:54.300
well I've seen any time we had personnel on that increase or departments doing it

00:50:54.300 --> 00:51:00.860
within the budgeting process is highly desirable this makes it look impromptu

00:51:00.860 --> 00:51:07.380
I'm assuming that this an FPA 1710 standard is a new one that we have not

00:51:07.380 --> 00:51:19.080
No, it's always been a requirement under the direction if Chief Kenworthy were starting to

00:51:19.080 --> 00:51:21.900
move forward to become closer to meet that requirement.

00:51:21.900 --> 00:51:30.420
And this is driven by our response to safety concerns, automobile accidents, everything

00:51:30.420 --> 00:51:32.500
and anything we're doing now.

00:51:32.500 --> 00:51:37.380
So what we're looking at is when you start taking a look at its desirous to have and meet

00:51:37.380 --> 00:51:42.500
closer to 1710 when you start taking a look at the breadth of the calls that we're running,

00:51:42.500 --> 00:51:47.500
whether they be the automobile calls, the hardiac, the cardiac arrest patients, the fire suppression.

00:51:47.500 --> 00:51:50.800
Well some of us are driven by our growth.

00:51:50.800 --> 00:51:54.340
Some of it is absolutely driven by our growth.

00:51:54.340 --> 00:52:01.190
One of the interesting things that, and I can't explain this in history of talking to

00:52:01.190 --> 00:52:09.430
You were probably the only one around in 1977 with the organization and I don't know

00:52:09.430 --> 00:52:13.950
if you were or not but in 1977 to put this in perspective the City of Twin Falls had

00:52:13.950 --> 00:52:20.570
43 line personnel protecting a community of 25,000 people.

00:52:20.570 --> 00:52:24.250
They we have 39,000 and I can't tell you what happened.

00:52:24.250 --> 00:52:29.330
We've always had 39 in my entire ten years so I can't tell you what occurred in that

00:52:29.330 --> 00:52:43.650
area and they ran 460 calls for service in 1977. Today, or last year they ran 5400 calls

00:52:43.650 --> 00:52:55.010
for service on 39 individuals, often times on 12 men groups, but I guess I just like to

00:52:55.010 --> 00:53:02.900
say that I understand the NHS of this request, I don't like fund personnel increases, but

00:53:02.900 --> 00:53:11.250
I can not justify it under the safety consideration and only the safety consideration to the city.

00:53:11.250 --> 00:53:16.720
We don't have this as an item, so I think this is in.

00:53:16.720 --> 00:53:24.720
I know we've been doing a lot of discussion recently on the Fire Department and we know that there's changes that we're going to have to make to keep up with the growth.

00:53:24.720 --> 00:53:30.720
Be nice if grants align with our budget process, but they don't.

00:53:30.720 --> 00:53:35.160
If we're not successful in the grant after we submit it,

00:53:35.160 --> 00:53:37.280
that doesn't mean we're still gonna hire

00:53:37.280 --> 00:53:38.680
those firefighters immediately,

00:53:38.680 --> 00:53:41.980
it'll still go through the process of the budget

00:53:41.980 --> 00:53:45.930
to get to that point, is that correct?

00:53:45.930 --> 00:53:48.410
I mean, we're not hiring firefighters next week.

00:53:48.410 --> 00:53:52.130
Oh no, oh, this is a really, really long process

00:53:52.130 --> 00:53:54.490
and what we're looking at is just the mere opportunity

00:53:54.490 --> 00:53:56.810
to be able to find some assistance.

00:53:56.810 --> 00:53:58.530
And what this says is that if we,

00:53:58.530 --> 00:54:00.730
the grant letter that we're asking you to say

00:54:00.730 --> 00:54:05.530
that should we be successful and we hire the firefighters we need to commit to

00:54:05.530 --> 00:54:10.890
holding them for the 36-month period which if you look at the 36-month period

00:54:10.890 --> 00:54:17.800
aligns with the federal schedule coming forward. What we're trying to do is to get

00:54:17.800 --> 00:54:22.440
a hit. Now let's say that the council says you know this is moving to fast

00:54:22.440 --> 00:54:26.460
force. What we want to do is to present this opportunity and if the council says

00:54:26.460 --> 00:54:31.580
this is moving too fast for us we can't have the conversation during the budget

00:54:31.580 --> 00:54:39.260
that says we will apply for that safer grant again in a subsequent year and we'll kind

00:54:39.260 --> 00:54:44.500
of move that forward and we can have conversations but unfortunately it never will align with our

00:54:44.500 --> 00:54:51.060
fiscal calendar as we as we move forward with those conversations just based upon the

00:54:51.060 --> 00:54:55.100
federal calendar is different than our calendar.

00:54:55.100 --> 00:55:00.220
With the exception of we know we're agreeing to maintain those employees for the three-year

00:55:00.220 --> 00:55:05.500
period. Are there any other stipulations or attachments to that grant that we have to meet?

00:55:06.060 --> 00:55:25.110
Not that we've seen. Thank you. Real quick, can you give me the $354,230? Okay, so it breaks down to

00:55:25.110 --> 00:55:35.260
$70,846 per FTE, which is the fully burdened cost. Okay, of which year one,

00:55:35.260 --> 00:55:44.660
and play 75% year 2 75% year 3 35% and then full amount is on our shoulders and

00:55:44.660 --> 00:55:48.860
year 4 that's correct would you like those numbers that's all right I can I

00:55:48.860 --> 00:55:57.650
should be able to do that hopefully I had it said to me how long from if this

00:55:57.650 --> 00:56:02.450
is approved when is the estimated amount of time what when should we know

00:56:02.450 --> 00:56:22.960
We either received it or no. We know that timeline.

00:56:22.960 --> 00:56:31.660
So we have 180 days to hire individuals, associate after the announcement of the award,

00:56:31.660 --> 00:56:35.660
and the announcement of the award is on July 1st of this year.

00:56:35.660 --> 00:56:39.980
Okay. We would wait announcement and hire people

00:56:39.980 --> 00:56:43.980
knowing that 75% of this would be paid for.

00:56:43.980 --> 00:56:48.980
So what will happen is there will be the next step in which you'll actually have to accept the grant

00:56:48.980 --> 00:56:54.380
in that process. It will give us the opportunity in our budgeting process to

00:56:54.380 --> 00:57:00.540
then put our local allocation forward because our our local allocation begin

00:57:00.540 --> 00:57:07.580
our fiscal year begins on October 1st. We have 180 days after July 1st to make

00:57:07.580 --> 00:57:13.820
those hires. We would not be able to hire anybody prior to the beginning of our

00:57:13.820 --> 00:57:20.820
fiscal year, but so sometime between October 1st of 2018 and January 1st of 2019 inside

00:57:22.780 --> 00:57:29.260
of that window, we would hire the individuals. So obviously, we're talking about full year

00:57:29.260 --> 00:57:35.220
costs. Our first year cost would be a little bit less than the $88,000 because we wouldn't

00:57:35.220 --> 00:57:41.900
have them on for that full fiscal year. Just how you'd wrap that for a year would be the

00:57:41.900 --> 00:57:44.740
the only thing that would be measured and different.

00:57:44.740 --> 00:57:47.340
We would come forward in our budget process.

00:57:47.340 --> 00:57:48.580
Again, a line for that.

00:57:48.580 --> 00:57:50.700
And there would be further debate and conversation

00:57:50.700 --> 00:57:53.620
that can certainly occur after we present that budget.

00:57:53.620 --> 00:57:56.580
This is really that step to move forward.

00:57:56.580 --> 00:57:59.120
I asked Mandy Thompson, our grand manager,

00:57:59.120 --> 00:58:01.940
would there be the opportunity that as we roll

00:58:01.940 --> 00:58:03.180
through the budgeting process,

00:58:03.180 --> 00:58:04.860
and let's say that something occurs,

00:58:04.860 --> 00:58:08.210
and could we refuse the grant?

00:58:08.210 --> 00:58:10.450
And she said, yes, you could refuse the grant.

00:58:10.450 --> 00:58:13.450
It doesn't look great with those federal agencies.

00:58:13.450 --> 00:58:15.610
There's no next person.

00:58:15.610 --> 00:58:18.570
It goes to those dollars just roll back to FEMA.

00:58:18.570 --> 00:58:22.570
But there is certainly the opportunity that should we not

00:58:22.570 --> 00:58:26.330
want to move forward, that possibility does exist.

00:58:26.330 --> 00:58:29.170
What we're committing is that we're committed to this grant.

00:58:29.170 --> 00:58:31.370
We believe that there's a true and valuable need, which

00:58:31.370 --> 00:58:33.770
I hopefully have started that process of demonstrating

00:58:33.770 --> 00:58:38.490
tonight, and that there is a way to offset that cost locally

00:58:38.490 --> 00:58:44.240
through this safer grant sponsored by Homeland Security and FEMA.

00:58:44.240 --> 00:58:49.780
So, can I summarize real quick to speak, sure I'm on the same page.

00:58:49.780 --> 00:58:57.030
Once it's approved or rejected, if it's approved at that point in time,

00:58:57.030 --> 00:59:01.450
we try to find those visuals.

00:59:01.450 --> 00:59:05.350
So there will be a commitment that will happen, so we will get the grant commitment

00:59:05.350 --> 00:59:08.250
and we will bring that forward, and that will be an agendized item

00:59:08.250 --> 00:59:11.250
and you will accept the conditions of the grant just as we have done

00:59:11.250 --> 00:59:12.950
with comps grants in the past.

00:59:12.950 --> 00:59:26.230
So ultimately it is helping us offset something that we need in the fire. I mean, these standards, it's offsetting that cost.

00:59:26.230 --> 00:59:27.230
Yes.

00:59:27.230 --> 00:59:48.530
I do really like the idea of being active and getting help with this because as we continue to grow, we know we have to have this and we already know.

00:59:48.530 --> 00:59:55.020
Like the police 48% of all their calls are for or outside of Twin Falls

00:59:55.820 --> 00:59:57.820
So this you know

00:59:58.180 --> 01:00:10.530
5500 total incidents pretty overwhelming and big smart. Yeah, nay

01:00:11.810 --> 01:00:13.850
I want to take some of the ownership of this

01:00:16.170 --> 01:00:22.590
Part of that ownership is really trying to understand what those staffing needs are

01:00:22.590 --> 01:00:28.710
are in fire departments and I really rely upon department leaders to be able to share with

01:00:28.710 --> 01:00:32.910
me how they need to be able to staff their departments to be able to fully function, to

01:00:32.910 --> 01:00:33.910
be able to move forward.

01:00:33.910 --> 01:00:41.310
And I will tell you that Chief Kenworthy has done a good job in helping build my own faculties

01:00:41.310 --> 01:00:45.630
and capacities on how we should be running departments and what that looks like.

01:00:45.630 --> 01:00:51.830
He comes from an area with a different collection of experiences that has already proven valuable

01:00:51.830 --> 01:01:00.370
to the city and I wish that I didn't place you into the situation this evening. These

01:01:00.370 --> 01:01:07.450
are the cards that I have and so I'm playing the hand that I'm dealt. We want to be obviously

01:01:07.450 --> 01:01:13.330
very judicious with property tax dollars and dollars as we move forward and we believe that

01:01:13.330 --> 01:01:21.650
yes, there's a cost. There's absolutely a cost but we also believe that if there's an opportunity

01:01:21.650 --> 01:01:26.170
to defer that cost and continue to provide the highest level of public safety services

01:01:26.170 --> 01:01:33.090
supplied by our fire department. Then it's willing to stand before you to make requests

01:01:33.090 --> 01:02:04.180
like this. At this time, would we like to hear audience? Yes, Mr. Edwards. Edwards, Twin

01:02:04.180 --> 01:02:14.770
Falls property owner. Government grants are still our money and I realize that what would

01:02:14.770 --> 01:02:18.870
come next from you folks, I'm assuming, would be, well, if we don't get it, somebody else

01:02:18.870 --> 01:02:19.870
is going to get it.

01:02:19.870 --> 01:02:27.130
I don't think that's appropriate way in the physical responsibility of you guys to decide

01:02:27.130 --> 01:02:32.770
how government spends their money if they're offering a grant and you take it, you're still

01:02:32.770 --> 01:02:33.770
spending our money.

01:02:33.770 --> 01:02:42.030
I understand that we have to have a staff safety service here with the fire department, the

01:02:42.030 --> 01:02:43.030
police department.

01:02:43.030 --> 01:02:54.630
My question is, is how long have we been operating out of compliance, making twice as many calls under the manned requirement?

01:02:54.630 --> 01:03:03.460
What were we 12? Are we 6? Were we 3? Now we got to be 14. How long has that gone on?

01:03:03.460 --> 01:03:12.220
And you guys didn't know about it that we were understaffed. You did? Now you do?

01:03:12.220 --> 01:03:18.780
No, no, but I mean, whenever you talk to the fire department, or you do a tour or whatever, you know that there are

01:03:19.820 --> 01:03:26.580
generally twelve firefighters on each of that company. Which is out of compliance and understaffed.

01:03:26.940 --> 01:03:30.420
Which is we were doing the very best with what we had.

01:03:30.940 --> 01:03:36.940
And so what's changed now the money, right? And the opportunity to get some more money and get some more staffing.

01:03:37.140 --> 01:03:39.140
Do a better job for our citizens.

01:03:39.140 --> 01:03:48.280
health and safety right that's what they expect absolutely well of course but why

01:03:48.280 --> 01:03:53.240
now because we have a grant available and its government money but it still

01:03:53.240 --> 01:04:03.160
comes from the public I just wanted to be clear on that

01:04:03.160 --> 01:04:08.800
one would during the latest fire chief Nikki that were

01:04:08.800 --> 01:04:15.400
vice mayor boy never both on that committee I wouldn't say they were incredulous but

01:04:15.400 --> 01:04:21.700
They were very surprised at the candidates that we are finalists that we were operating at 39 line officers.

01:04:22.200 --> 01:04:28.200
I felt that that was apparently an adequate for staff of 50,000 I think to a man

01:04:28.700 --> 01:04:31.700
talked about the need for additional firefighters.

01:04:32.500 --> 01:04:40.010
We, part of this game when we made the decision was made to our Nancy Moore calls.

01:04:40.010 --> 01:04:50.330
for answering all of the the accident ones that were medical emergencies. That's where a lot of the call

01:04:50.330 --> 01:04:56.090
of them. So to the point of when we became understaffed, I knew we were understaffed. I've known our staff for years.

01:04:56.090 --> 01:05:04.570
But the call of numbers did not justify to be the expense. We had bigger needs and other places in our budget.

01:05:04.570 --> 01:05:07.270
and we've been a very frugal bunch in here.

01:05:07.270 --> 01:05:10.550
And we've went years where we didn't take any percentage,

01:05:10.550 --> 01:05:12.670
let alone the three percent.

01:05:12.670 --> 01:05:18.280
And finally keep time, keep very apparent with the new,

01:05:18.360 --> 01:05:22.260
all demands to grow through our population.

01:05:22.260 --> 01:05:27.020
That we suddenly have 39 line officers, whenever,

01:05:27.020 --> 01:05:31.200
in 1977 or so, 40 years ago, we had 43 officers,

01:05:31.200 --> 01:05:33.160
or 43 line personnel, sure.

01:05:33.160 --> 01:05:34.760
Part of that's better equipment.

01:05:34.760 --> 01:05:40.700
that has helped us to meet that demand but it still doesn't run on the fact that

01:05:40.700 --> 01:05:45.560
we're it's time for us to expand our fire service and if we can get federal money

01:05:45.560 --> 01:05:51.080
to help us to expand that fire service yes that is my money but I feel I have a

01:05:51.080 --> 01:05:56.840
right to it just like anybody else does and if it helps deflect costs we're gonna

01:05:56.840 --> 01:06:01.680
have some problems most likely occur anyway from our citizens of Twin Falls

01:06:01.680 --> 01:06:08.600
I think that's my job. I present the citizens when falls not the citizens of other states

01:06:09.240 --> 01:06:14.400
And so if I can get money through this path to save the citizens of

01:06:16.680 --> 01:06:18.680
And I'll say yes every time

01:06:24.600 --> 01:06:26.600
You see analogy of the place department

01:06:27.520 --> 01:06:31.480
We're that 48% of all the service calls for people out of

01:06:31.480 --> 01:06:37.520
of city limits, or police department extremely efficiently

01:06:37.520 --> 01:06:42.820
on the manpower versus the issue of residents.

01:06:42.820 --> 01:06:48.260
The fire is as great as it is to some function of our growth.

01:06:48.260 --> 01:06:51.660
But I tell you, when it comes to safety,

01:06:51.660 --> 01:06:54.900
even though this is kind of the cart before the horse,

01:06:54.900 --> 01:06:58.820
or the whole thing is backwards, in my days days,

01:06:58.820 --> 01:07:01.880
I've seen fire at least in the M.T.

01:07:01.880 --> 01:07:09.560
safe lives and accidents. I've also seen and witnessed lives being lost by an adequate

01:07:09.560 --> 01:07:18.620
personnel. We're wasting money, but I'll tell you that I'll stand up and say to the people

01:07:18.620 --> 01:07:26.510
whose lives are saved, that safety is going to take my vote to the upside.

01:07:26.510 --> 01:07:39.700
I met a vice-americ, I don't maybe want to put this in perspective, so our local match is $88,557 for the first two years.

01:07:39.700 --> 01:07:48.780
The cost of each FTP, FTE is $70,846.

01:07:48.780 --> 01:07:52.780
How we staff, you can't bring them on one at a time.

01:07:52.780 --> 01:08:00.090
It doesn't functionally work, you want to have evenly deployed teams.

01:08:00.090 --> 01:08:03.570
So Mr. Edwards asked the question in terms of, is this a new standard?

01:08:03.570 --> 01:08:07.690
No, it's not a standard, it is a standard that has been there for a while and as we've

01:08:07.690 --> 01:08:13.690
been working to not only grow the competitive compensation but it's also important for us

01:08:13.690 --> 01:08:17.490
to be able to look at manning and these things take time.

01:08:17.490 --> 01:08:23.010
I get the sense that Mr. Edwards is looking for someone to blame and he can blame me because

01:08:23.010 --> 01:08:26.530
at the end of the day I'm responsible for the organization and if it's important to

01:08:26.530 --> 01:08:29.090
place blame, you can place that on me.

01:08:29.090 --> 01:08:47.400
Move this letter of support for the application by the Twin Falls Fire Department for a staffing

01:08:47.400 --> 01:08:53.880
of adequate firing emergency response safe for grant through the federal emergency management

01:08:53.880 --> 01:08:58.480
agency FEMA of the US Department of Homeland Security.

01:08:58.480 --> 01:09:24.460
Chris talking to Christopher Reed. Yes, Ruth Pierce. Yes, then Hawkins. Yes, Nicky boy. Yes, Chris talking to

01:09:24.460 --> 01:09:35.570
Yes, Reg Lanting. Yes, passes six to zero. Thank you very much. It is after six. We have

01:09:35.570 --> 01:09:51.840
Oh, let's cover our advisory board reports or any announcements, you know, just so that

01:09:51.840 --> 01:09:58.200
didn't get lost. Arbor Day is this Friday at four o'clock at the Oregon Trail Youth Complex.

01:09:58.200 --> 01:10:02.400
We hope that we'll see many individuals in attendance.

01:10:02.400 --> 01:10:11.530
Yes, it's always fun. Dicking in the dirt is always fun. And I actually think the weather is actually so

01:10:11.530 --> 01:10:18.170
in past it has been miserable. I think that this year it's it's looking to be a really nice day.

01:10:18.170 --> 01:10:24.200
that's a lot better than 44. Yeah, where's that?

01:10:24.200 --> 01:10:32.520
It's 330. Or a clock. Is that a youth complex? Is that actually on the Oregon? It's not an Oregon

01:10:32.520 --> 01:10:42.230
trail school. It's just north, correct? Cross the street. Yes. It's time for public hearings.

01:10:42.230 --> 01:10:49.790
Our first public hearing tonight is a request for a zoning district change and zoning map

01:10:49.790 --> 01:10:56.270
amendment from R2 to R2 Pro for property located at 104 Lincoln Street

01:10:56.270 --> 01:11:02.970
Cara Bryant Tanner and we have our brand new first meeting landing and zoning

01:11:02.970 --> 01:11:06.730
director

01:11:10.880 --> 01:11:18.580
Council members and members mayor for full disclosure the second item on this

01:11:18.580 --> 01:11:22.260
Has some lengthy discussion at the planning and zoning commission, so

01:11:23.100 --> 01:11:26.180
It took about I think was an hour and a bit

01:11:26.180 --> 01:11:31.300
I just don't know about a break for anybody that would want to be for you get in the public hearings if you guys feel like you

01:11:31.300 --> 01:11:35.620
Would like to do that or not? That's up to you. I just wanted to let you know about that

01:11:35.620 --> 01:11:38.410
I don't know if that'll take this long tonight

01:11:38.410 --> 01:11:42.680
I was just giving you the full disclosure for what happened at that meeting. Let's do it in the last time

01:11:42.920 --> 01:11:59.780
I'm gonna get the set up and show everything and then I will have

01:11:59.780 --> 01:12:12.080
have applicant come up to his presentation first, but be Brian Tanner.

01:12:12.080 --> 01:12:33.000
I have an office on 104 Lincoln that's really close to five points you've probably all

01:12:33.000 --> 01:12:39.120
been by there many many many times a day. It's a little great building. It's been a office

01:12:39.120 --> 01:12:45.770
for about 20 years I think. We have signs all around us I wanted to put in a little sign

01:12:45.770 --> 01:12:56.340
and I sign probably about this high. There's any questions today.

01:12:56.340 --> 01:13:04.660
Ryan, do you have a cop or a picture of what your science is going to look like?

01:13:04.660 --> 01:13:09.500
I know you asked for that and I do have a proposal from Little Science.

01:13:09.500 --> 01:13:17.620
It's I have an email but I don't have it on me right now on my cell phone right now.

01:13:17.620 --> 01:13:23.060
Did you use it? I can describe it if you want. That'd be fine. So it's um it'll be smooth.

01:13:23.060 --> 01:13:31.140
it'll have brick. I'm hoping that it can be lighted at night so there'll be

01:13:31.140 --> 01:13:39.760
some electrical input to it in monument time.

01:13:39.760 --> 01:13:45.630
Do you know the dimensions? I don't know exactly, but I'm anticipating it over.

01:13:45.630 --> 01:13:58.900
Are you winning the sign on the Blue Lakes side or on the Lincoln Street side?

01:13:58.900 --> 01:14:03.700
I was told last time I was here that I had anticipated originally putting it on

01:14:03.700 --> 01:14:08.860
the corner of Lincoln and Addison but the engineer told me I couldn't do that

01:14:08.860 --> 01:14:13.440
because you have to have like visibility and stuff like that so I'm

01:14:13.440 --> 01:14:17.940
actually planning on putting it very close to the car store so there's a

01:14:17.940 --> 01:14:22.540
camper downhill really close to where the air is maybe a little bit to you

01:14:22.540 --> 01:14:29.890
right there and there's a parking lot right behind there so that's where I

01:14:29.890 --> 01:14:39.190
I anticipate putting it in.

01:14:39.190 --> 01:14:46.170
Questions?

01:14:46.170 --> 01:14:48.130
I'll click here.

01:14:48.130 --> 01:14:49.130
I know.

01:14:49.130 --> 01:14:50.130
I'm sorry Jonathan.

01:14:50.130 --> 01:14:53.130
So Brian went to the heart of why he's here.

01:14:53.130 --> 01:14:58.420
What I'm going to do is help you walk you through what we're doing in staff here.

01:14:58.420 --> 01:15:03.420
He's in a R2 zone, which does not permit signs.

01:15:03.420 --> 01:15:09.420
It's also part of an older agreement called the Stoker Agreement Area that allowed for

01:15:09.420 --> 01:15:11.420
offices to be along Addison Avenue.

01:15:11.420 --> 01:15:14.860
had some very specific development criteria for signage.

01:15:14.860 --> 01:15:18.740
Mr. Tanner wants to kind of deviate from that agreement,

01:15:18.740 --> 01:15:22.580
and he wants to have his property be zoned

01:15:22.580 --> 01:15:24.180
as a professional office overlay.

01:15:24.180 --> 01:15:25.420
So that's actually what we're here for,

01:15:25.420 --> 01:15:28.140
is a rezone on the property.

01:15:28.140 --> 01:15:30.140
He went to the heart of the issue that he wanted to sign,

01:15:30.140 --> 01:15:32.100
that's what he approached us for.

01:15:32.100 --> 01:15:34.780
The council's decision will be on the rezone of the property

01:15:34.780 --> 01:15:38.540
and whether to put that professional office overlay

01:15:38.540 --> 01:15:43.300
on the property, then he can come in for a sign permit under the regulations that we

01:15:43.300 --> 01:15:44.300
currently have.

01:15:44.300 --> 01:15:50.970
So he would have to meet all the regulations they are as they're written in the Code Title

01:15:50.970 --> 01:15:53.900
10, Chapter 9.

01:15:53.900 --> 01:15:58.400
That's what the property looks on the exterior.

01:15:58.400 --> 01:16:03.720
The comprehensive plan shows it as neighborhood commercial or residential business along Addison

01:16:03.720 --> 01:16:05.960
on the south side and the north side.

01:16:05.960 --> 01:16:09.560
Currently all the properties on the south side have the professional office overlay.

01:16:09.560 --> 01:16:14.560
So there's nothing really crazy about this request.

01:16:14.560 --> 01:16:16.560
During the public hearing, there was,

01:16:16.560 --> 01:16:19.840
I believe there were one or two people that spoke.

01:16:19.840 --> 01:16:22.840
Their questions were more on what does the sign look like?

01:16:22.840 --> 01:16:26.840
Not necessarily as to whether it's appropriate to resolve the property.

01:16:26.840 --> 01:16:30.840
So those questions were kind of separate from what the action was.

01:16:30.840 --> 01:16:34.840
And the commission voted all and goes at nine to zero.

01:16:34.840 --> 01:16:39.320
I think everybody was there that night in favor of forwarding a positive

01:16:39.320 --> 01:16:41.480
to the city council for rezoning the property

01:16:41.480 --> 01:16:43.320
with the professional officer, really,

01:16:43.320 --> 01:16:45.600
and lighting as accepted.

01:16:45.600 --> 01:16:48.200
Lighting is accepted in some situations.

01:16:48.200 --> 01:16:50.400
We'd have to see some kind of what his plan looks like,

01:16:50.400 --> 01:16:52.760
but we'll make sure it meets the code,

01:16:52.760 --> 01:16:54.520
whichever it allows either a backlight

01:16:54.520 --> 01:16:56.800
or another lighting as lighting down.

01:16:56.800 --> 01:16:57.640
All you think is like.

01:16:57.640 --> 01:17:00.460
It's possible, yeah.

01:17:00.460 --> 01:17:05.300
So our charge this evening is to address the rezone.

01:17:05.300 --> 01:17:06.140
Correct.

01:17:06.140 --> 01:17:09.740
And if that's successful, then he will come back

01:17:09.740 --> 01:17:16.020
He'll come back to staff and just apply for a sign permit.

01:17:16.020 --> 01:17:24.030
That's an administrative approval per the code as it's written.

01:17:24.030 --> 01:17:27.030
Suzanne, just clarifying what I think I heard.

01:17:27.030 --> 01:17:32.030
Other adjoining properties already have the professional overlay in this area.

01:17:32.030 --> 01:17:33.030
Let me get back.

01:17:33.030 --> 01:17:34.030
Yeah.

01:17:34.030 --> 01:17:35.030
This area, there's a dotted line.

01:17:35.030 --> 01:17:38.030
It actually includes a lot of the original town site.

01:17:38.030 --> 01:17:41.030
That dotted line kind of indicates some of it.

01:17:41.030 --> 01:17:47.830
of it. Everything on Addison across the street, you can see this is pro right here, everything

01:17:47.830 --> 01:17:54.950
along this street has professional office overlay. So the signage, if you drove down Addison on

01:17:54.950 --> 01:17:59.110
the south side, you'd see a bunch of signage. On the north side, you may not see any of those

01:17:59.110 --> 01:18:03.750
type of monument signs. It's due to the zone that's on the south side of the road, but not on the

01:18:03.750 --> 01:18:10.610
north side. I see. And Lincoln Street is the street that we just put the heritage lighting on as well.

01:18:10.610 --> 01:18:11.610
Is that correct?

01:18:11.610 --> 01:18:14.810
Yeah, Blinken Street has that lighting and don't know how far it goes, but I do believe

01:18:14.810 --> 01:18:18.090
it starts at Aniston and goes north, a block or two.

01:18:18.090 --> 01:18:23.280
Thank you.

01:18:23.280 --> 01:18:29.500
Other questions?

01:18:29.500 --> 01:18:34.780
Right now we'll open up the public hearing portion and have anybody from the audience

01:18:34.780 --> 01:18:36.180
who wishes to speak.

01:18:36.180 --> 01:18:40.090
Mr Edwards.

01:18:40.090 --> 01:18:56.740
First of all, I'd like to say I never said it was a waste of money.

01:18:56.740 --> 01:19:03.900
I never said that you weren't looking for safety for the public and I resent the fact

01:19:03.900 --> 01:19:08.130
that you infer that I needed somebody to play.

01:19:08.130 --> 01:19:11.610
I just simply pointed out the fact that it's government money,

01:19:11.610 --> 01:19:14.650
that we've been operating below the standard

01:19:14.650 --> 01:19:16.810
for a number of years.

01:19:16.810 --> 01:19:20.010
And I realize that you're trying to work up to that fact.

01:19:20.010 --> 01:19:22.610
But I resent the fact that you would attack somebody

01:19:22.610 --> 01:19:28.260
from the public that pays your salary in this way.

01:19:28.260 --> 01:19:30.980
I resent it, and I'm not going to allow it to stand.

01:19:30.980 --> 01:19:33.140
I resent it, and I'm not going to allow it to stand

01:19:33.140 --> 01:19:40.840
If you are resented also for that comment that you made, you had no reason to do that.

01:19:40.840 --> 01:19:52.010
You sound like you're running for public office. That's for sure.

01:19:52.010 --> 01:20:11.120
I might stick around if you threaten my job. The last speaker wasn't speaking to the...

01:20:11.120 --> 01:20:17.920
Alright. There anybody who signed in to speak to this issue of the zoning change?

01:20:17.920 --> 01:20:23.720
See, no one will close that portion. Now we're back to council.

01:20:23.720 --> 01:20:34.160
I'm ready to make a motion.

01:20:34.160 --> 01:20:35.160
Fantastic.

01:20:35.160 --> 01:20:40.960
I would move that we approve the zoning district change in zoning map amendment from R2 to

01:20:40.960 --> 01:20:47.960
R2 Pro for the property located at 104 Lincoln Street.

01:20:47.960 --> 01:20:53.140
Motion passes in Hawkins, seconded by Greg Lanting, another discussion.

01:20:53.140 --> 01:21:05.060
Is it in Hawkins?

01:21:05.060 --> 01:21:06.060
Yes.

01:21:06.060 --> 01:21:07.060
Niki Boyd?

01:21:07.060 --> 01:21:08.060
Yes.

01:21:08.060 --> 01:21:09.060
Chris Tockington?

01:21:09.060 --> 01:21:10.060
No.

01:21:10.060 --> 01:21:11.060
Greg Lanting?

01:21:11.060 --> 01:21:12.060
Yes.

01:21:12.060 --> 01:21:13.060
Christopher Reed?

01:21:13.060 --> 01:21:14.570
Yes.

01:21:14.570 --> 01:21:25.560
passes 6 to 0. Thank you, Jonathan.

01:21:25.560 --> 01:21:31.150
Is a request for a P&M into the Preserve PUD number 261

01:21:31.150 --> 01:21:34.170
to reflect changes in proposed uses,

01:21:34.170 --> 01:21:37.650
project boundary completion of the Canyon Rim Trail,

01:21:37.650 --> 01:21:39.950
dedicating a trailhead park

01:21:39.950 --> 01:21:43.670
and to allow project specific roadway standards

01:21:43.670 --> 01:21:47.590
on approximately 370 acres plus or minus,

01:21:47.590 --> 01:21:51.390
located in the southeast corner of Eastwood Drive, North,

01:21:51.390 --> 01:21:58.080
Holline Road East, Cara of Gerald Martins on behalf of Connie Store. Welcome, Gerald.

01:21:58.080 --> 01:22:04.880
Thank you for the record. My name is Gerald Martins. I'm here this evening to talk to you about the

01:22:04.880 --> 01:22:12.080
Preserve Project. Just a little bit of history. First of all, I'm going to try to meet your goal

01:22:12.080 --> 01:22:18.000
of making it much shorter. At this evening, we're going to address the issue of this on the agenda,

01:22:18.000 --> 01:22:24.300
specifically the amendment to the PUD. I'll be back to see you with a final

01:22:24.300 --> 01:22:29.780
plan on the details of the project at a later date but I think for you to

01:22:29.780 --> 01:22:34.890
understand that some of the changes in the PUD I have to show you a little bit of

01:22:34.890 --> 01:22:38.850
what the vision is for the project and I'll try to limit that.

01:22:38.850 --> 01:22:47.140
Fourteen years ago, first came before the City Council with a kind of sexual plan for

01:22:47.140 --> 01:22:52.060
What was doing was to preserve mixed use residential

01:22:52.060 --> 01:22:59.100
with some commercial element development.

01:22:59.100 --> 01:23:02.700
Went through some master planning on the screen up here

01:23:02.700 --> 01:23:04.500
is basically shows you the property

01:23:04.500 --> 01:23:07.340
and basically shows you that master plan

01:23:07.340 --> 01:23:09.580
configuration in a general form

01:23:09.580 --> 01:23:12.580
as it was presented back 14 years ago.

01:23:12.580 --> 01:23:17.580
Then along came some difficult development times

01:23:17.580 --> 01:23:26.270
And Dr. Storr decided to focus more on raising cattle than the houses.

01:23:26.270 --> 01:23:30.270
And there seemed to be more demand for cattle than the houses at that time.

01:23:30.270 --> 01:23:36.650
In 2012 we came back with the PUD amendment and got it executed.

01:23:36.650 --> 01:23:40.650
And the PUD agreement was executed in 2012.

01:23:40.650 --> 01:23:45.650
Now we're moving forward with the actual development of the first phase, which we call the springs.

01:23:45.650 --> 01:23:48.650
And in doing that, working with staff, we...

01:23:48.650 --> 01:23:55.910
There are five, I believe, items in the PUD agreement or areas in the PUD agreement that need to be

01:23:56.330 --> 01:24:02.290
Mr. cleaned up in an amendment. First is housekeeping items

01:24:03.210 --> 01:24:05.760
which

01:24:05.760 --> 01:24:10.760
PUD have been called for dedication of a trail and dedication of a park. Those things have been completed

01:24:11.680 --> 01:24:21.040
Those are done. The amendment will reflect that they have been in no longer requirement. The PUD agreement called for

01:24:21.040 --> 01:24:29.050
private, public irrigation system as a project is now envisioned and was really

01:24:29.050 --> 01:24:33.990
always envisioned. It's going to have a lot of open space. It's going to retain

01:24:33.990 --> 01:24:41.750
agricultural elements for a long time, maybe forever, that really not very

01:24:41.750 --> 01:24:46.670
compatible with the city's pressurized irrigation system. So we will incorporate

01:24:46.670 --> 01:24:50.630
a private pressurized irrigation system that will irrigate not only the

01:24:50.630 --> 01:24:56.850
residential lots, but the common areas that are pertinent to the subdivisions, but also

01:24:56.850 --> 01:25:05.410
the common areas that will remain both as agricultural pursuits and as wildlife habitat incorporating

01:25:05.410 --> 01:25:07.610
the system.

01:25:07.610 --> 01:25:19.220
The third thing is it never was designated on the master plan, but there was some language

01:25:19.220 --> 01:25:28.560
to the possibility of some commercial development adjacent to Eastland.

01:25:28.560 --> 01:25:36.560
This amendment takes out that element of potential and makes it what I believe is a high scale,

01:25:36.560 --> 01:25:46.200
not high scale, but high quality residential development with a very residential flavor

01:25:46.200 --> 01:25:51.200
and not compatible to a commercial development that you might see across the street

01:25:51.200 --> 01:26:02.070
the street on down the Pull Line Road. Another thing that happened during the building

01:26:02.070 --> 01:26:09.190
of the trail, there was a section of the trail and it shone on the mat that cut off a piece

01:26:09.190 --> 01:26:16.630
of the property. There was about four acres, four plus acres that's been severed from

01:26:16.630 --> 01:26:23.390
the rest of the property by the trail as dedicated. The alignment of the trail was worked out

01:26:23.390 --> 01:26:28.830
to reduce the length of the trial and make it less expensive trial and a more desirable

01:26:28.830 --> 01:26:29.830
trial.

01:26:29.830 --> 01:26:35.270
We made better use of the stream crossings and the things that the alignment we came up

01:26:35.270 --> 01:26:41.870
with, but this PUD amendment allows those four acres to potentially be developed as three

01:26:41.870 --> 01:26:50.030
residential lots in an SUI category, which basically clear one acre minimum parcels with

01:26:50.030 --> 01:26:51.670
wells and septic systems.

01:26:51.670 --> 01:26:59.360
They would be accessed off from the pull-down road east.

01:26:59.360 --> 01:27:04.360
The last thing, and why we need to probably show some pictures, is the roadway section.

01:27:04.360 --> 01:27:08.360
I'll just walk you through these real quickly.

01:27:08.360 --> 01:27:16.360
What you see here is the overlay of the initial phase of the project, which is, that is the springs he's outlined in.

01:27:16.360 --> 01:27:29.360
There is an access road that comes in off from, it's chain, it comes in off of me, it's a primary access, it comes in to the community center and the initial phase.

01:27:29.360 --> 01:27:44.240
It absolutely establishes a theme of this project as you'll see in future pictures on the borders and elements that we would like to work into the project as we move through it.

01:27:44.240 --> 01:27:53.420
I think it's important because it identifies the key points, the big suns, what you're going

01:27:53.420 --> 01:27:59.230
to call them are, the places where this project connects to the community or the trail.

01:27:59.230 --> 01:28:05.090
You've got trail connections, connections to Eastland, connections to Trailhead Park,

01:28:05.090 --> 01:28:14.480
and that smaller stars are, I think, key elements that benefit the community, and basically

01:28:14.480 --> 01:28:21.960
their wildlife habitat locations and water features that will be enhanced and

01:28:21.960 --> 01:28:30.120
emphasized as part of the project. It'll make the project the subdivision unique

01:28:30.120 --> 01:28:36.570
at least for this community. Oh, this, excuse me, he's already there. The initial

01:28:36.570 --> 01:28:41.570
phase of the project will be the community center. The plan calls for building not

01:28:41.570 --> 01:28:49.050
to exceed 8,000 square feet eventually be built to provide services for the community.

01:28:49.050 --> 01:28:55.130
The initial phase of the project will be the postal center, the mail center.

01:28:55.130 --> 01:28:58.930
All mail will be picked up by all residents at this location.

01:28:58.930 --> 01:29:06.820
The initial phase will also include a little bit of an area where the neighbors can meet

01:29:06.820 --> 01:29:14.500
read there, maybe have a cup of coffee, meet to go on a hike on part of the trail system

01:29:14.500 --> 01:29:20.100
for me to just as part of their activity and exercise, this project is going to really

01:29:20.100 --> 01:29:27.500
focus on pedestrian activities and pedestrian facilities and take the benefit of being adjacent

01:29:27.500 --> 01:29:32.590
to the wonderful trail song.

01:29:32.590 --> 01:29:42.190
Now, my Arbor Day, black trees, the real reason for the fifth item on the PDM

01:29:42.190 --> 01:29:45.190
in, but is allowed for a modified section.

01:29:45.190 --> 01:29:52.190
As you can see, what I'm proposing to do is build two 24-foot roadways,

01:29:52.190 --> 01:30:00.730
two-way traffic, each direction in and out, all from Eastland with a median down the center with trees

01:30:00.730 --> 01:30:05.290
landscape and wrap that theme around

01:30:05.290 --> 01:30:12.110
Eastland to the north and future faces. The entry

01:30:12.110 --> 01:30:18.300
just another shows a background level view more of what it will be like.

01:30:18.300 --> 01:30:26.680
The intent is to create a sense of arrival. This was a little earlier if you go

01:30:26.680 --> 01:30:31.160
the next one. Okay this is one that we've been working with

01:30:31.160 --> 01:30:35.960
staff on dealing with road to train each and continue to work with staff.

01:30:35.960 --> 01:30:53.780
As you can see, basically is a very soft concept with the trees, detached pathways, swelled to accommodate the drainage.

01:30:53.780 --> 01:30:59.780
This land, if you're not familiar with it, but I think most of you are, it's a lot of rock.

01:30:59.780 --> 01:31:09.030
There's some ground water and some areas, and it's not conducive to a road that follows a terrain

01:31:09.030 --> 01:31:14.860
is comfortable to lay it upon the terrain and I think staff agrees with that.

01:31:14.860 --> 01:31:18.640
You know, we will probably not put this many flowers in the mediums because that's a big

01:31:18.640 --> 01:31:24.280
expanse to the homeowners to maintain it, but I would expect there would be some opportunities

01:31:24.280 --> 01:31:29.860
for flower beds at crosswalks and locations where the public could really appreciate the

01:31:29.860 --> 01:31:30.860
flowers.

01:31:30.860 --> 01:31:40.300
This will have a strong, well-developed community neighborhood association with CCNR's funded

01:31:40.300 --> 01:31:50.210
to maintain those facilities. One key element is a ground about, that'll be in a future phase,

01:31:50.210 --> 01:31:57.260
where Cheney would extend on over towards Hankins Road to the right and to the left as into the

01:31:57.260 --> 01:32:06.260
initial phase of the project. Just a little bit of scale, homes will be set back much more than the

01:32:06.260 --> 01:32:14.780
are required 20 feet from the streets for two reasons. First of all, to provide for roadside

01:32:14.780 --> 01:32:24.480
drainage soils. I actually happened to be in Eagle this last weekend and it's an excellent

01:32:24.480 --> 01:32:31.880
idea on how they get those made up very attractive. I'll be presenting that to staff. The concept

01:32:31.880 --> 01:32:38.570
is, is soils that accommodate the drainage, both from the lots and from the street. This

01:32:38.570 --> 01:32:44.690
is this cross-section that would, along with the red rings, that would be in the amended

01:32:44.690 --> 01:32:51.250
PUD agreement. It shows the road section of the, where the island exists on the main entry.

01:32:51.250 --> 01:32:57.940
Then there's another road section, which is the, for the sections that don't have the

01:32:57.940 --> 01:33:06.030
median, specifically the residential streets, where the individual holds. So in summary,

01:33:06.030 --> 01:33:15.440
It's five changes, the housekeeping ones reflect the things that have already been done, pressure

01:33:15.440 --> 01:33:24.240
irrigation, modified road section, lemonade and the commercial, and the three lots that

01:33:24.240 --> 01:33:31.630
were cut off and will be developed under a separate plant, receive city services that

01:33:31.630 --> 01:33:39.510
will be any city water or sewer, extended to pressure irrigation will be extended to those

01:33:39.510 --> 01:33:51.760
Homeowners Association, they will be members of the Homeowners Association because they will get the full benefits of pedestrian facilities, the pathways and the trails.

01:33:51.760 --> 01:33:57.680
They're just a little different route to get to their homes.

01:33:57.680 --> 01:34:07.560
With that, one of the issues of the conditions I would like to discuss in just a bit.

01:34:07.560 --> 01:34:12.560
It has to do with the request for the sidewalk adjacent to Eastland.

01:34:12.560 --> 01:34:22.350
Eastland is not being, the French on Eastland is not being developed in the initial phase.

01:34:22.350 --> 01:34:28.600
I know there's a desire to get that sidewalk done as soon as possible.

01:34:28.600 --> 01:34:32.600
I suggested that we put in a date certain that would happen.

01:34:32.600 --> 01:34:39.140
However, I think it's important to note that I want to continue working with the city.

01:34:39.140 --> 01:34:46.020
The design of that pathway along Eastland, because it can't be developed now

01:34:46.900 --> 01:34:49.340
Not to the not to what I envision

01:34:49.840 --> 01:34:54.080
We could put a sidewalk right adjacent to Eastland Street right now

01:34:54.400 --> 01:35:01.620
But what I envision is that pathway and being detached from the street by landscaping

01:35:02.320 --> 01:35:08.010
So that the pathway is not only more attractive meanders

01:35:08.010 --> 01:35:12.870
with some landscaping and berms on both sides of it, but it's also safer by

01:35:12.870 --> 01:35:20.820
moving the pedestrians and the bicycles away from the roadway. That

01:35:20.820 --> 01:35:29.200
particular piece of the project is phase two. I'm hoping I'm there in three years.

01:35:29.200 --> 01:35:35.240
Just a bit on the schedule this year, this summer and spring. We're out there

01:35:35.240 --> 01:35:43.680
We've imported a lot of fill material already. We've done a rock coring. Our water, each one of our ground water and our rock is.

01:35:44.080 --> 01:35:48.240
We are working with department water resources on cleaning those ponds.

01:35:49.240 --> 01:35:53.480
We re-establishing the streams in a more natural state.

01:35:56.360 --> 01:36:02.400
The cattle have walked the stream banks in and places and we're going to re-establish those. We are going to

01:36:02.400 --> 01:36:10.840
to take all the turdlies out of the ponds and restore it to a lake like you see in the

01:36:10.840 --> 01:36:11.840
pictures.

01:36:11.840 --> 01:36:16.440
Mid-summer we will come to you with a final plan on the initial phase.

01:36:16.440 --> 01:36:22.640
It's our intent to put the underground utilities in this fall for the first phase of the subdivision

01:36:22.640 --> 01:36:38.070
with paving in the spring of 2019 and construction could be at sometime maybe July of 2019.

01:36:38.070 --> 01:36:41.070
I think that's, I'll be just glad to have some stand for any questions.

01:36:41.070 --> 01:36:56.450
That's out the uh, my memory mallet, marios lake, which is the natural lake that we're, we're

01:36:56.450 --> 01:37:01.450
to now company lake, so it's more over where, I don't know where the trail head, but this

01:37:01.450 --> 01:37:07.450
is not, it's down to very close to the current park, just immediately, so we're right in that

01:37:07.450 --> 01:37:09.450
area, right?

01:37:09.450 --> 01:37:15.450
That is the lowest, just to give you a background, that is the lowest spot on the entire property.

01:37:15.450 --> 01:37:23.370
property, elevation-wise, okay? And that's where the gravity irrigation water for that area west of

01:37:23.370 --> 01:37:36.400
the Cooley old drain. With the advent of sprinkler irrigation control of the water, the work by leveling

01:37:36.400 --> 01:37:42.240
of the land and the things that have been done in the last 20 years, that lake eventually dried up

01:37:42.240 --> 01:37:52.330
the wetlands expert no longer classifies it as a wetland but most of the

01:37:52.330 --> 01:38:02.130
attributes of that old Mary Ellis Lake are going to be recaptured in the lake right

01:38:02.130 --> 01:38:09.090
there that lake there that if you look at it today it's mostly cat tails 20 years

01:38:09.090 --> 01:38:18.970
ago it was a lot of open water. Mostly we've done some test holes in it. It's full of

01:38:18.970 --> 01:38:24.830
decomposed cattails for the most part. Decomposed vegetation needs to be

01:38:24.830 --> 01:38:34.130
dredged out, reshaped, and the springs that feed it enhanced so that it's an

01:38:34.130 --> 01:38:39.380
amenity rather than a... there's still some ducks in there but we're gonna make it a

01:38:39.380 --> 01:38:51.760
nice duck pond. Further east of this, there was a significant fish rearing operation on

01:38:51.760 --> 01:38:57.320
this property for many, many years. And some of those fish certainly were placed in these

01:38:57.320 --> 01:39:06.960
ponds and in some of these streams. I think that is a long time ago. And the industry has

01:39:06.960 --> 01:39:37.880
moved way beyond dirt, mud ponds to grow fish. So when they put in hydroelectric plant,

01:39:37.880 --> 01:39:41.600
There was some efforts to consolidate that water

01:39:41.600 --> 01:39:46.600
into a more predictable stream for generation.

01:39:46.720 --> 01:39:51.560
I was also partly as part of the agricultural process

01:39:51.560 --> 01:39:54.520
to more efficiently irrigate the property,

01:39:54.520 --> 01:39:58.240
especially with the pivots that were installed on it.

01:39:58.240 --> 01:40:05.410
A lot of the old ditches were removed or re-directed.

01:40:05.410 --> 01:40:07.730
The result of that was, of course,

01:40:07.730 --> 01:40:09.850
a nice counter-wrench for a lot of years,

01:40:09.850 --> 01:40:19.770
but it also had a lot of significant impact on the groundwater supported by that ground.

01:40:19.770 --> 01:40:25.980
It's an exciting project. It's going to be fun. I think it's something in the community.

01:40:25.980 --> 01:40:34.610
We've received well since B and Z, or this. I've been many people calling one to know

01:40:34.610 --> 01:40:38.610
whether they can reserve lots until they hear the price.

01:40:38.610 --> 01:40:44.610
There's a click, but it is expensive to develop.

01:40:44.610 --> 01:40:47.810
I think, you know, I kind of like the joke

01:40:47.810 --> 01:40:49.530
when he called us an infill project,

01:40:49.530 --> 01:40:52.930
and it is infill, he's developed us all the way around it.

01:40:52.930 --> 01:40:56.150
He's been developed and wasn't developed

01:40:56.150 --> 01:40:58.910
for the obvious reason, it's difficult to develop,

01:40:58.910 --> 01:41:02.430
but it's also got some really unique rock features

01:41:02.430 --> 01:41:07.430
and water, a surface water, ground water, springs,

01:41:08.470 --> 01:41:11.350
wildlife habitat, if we get rid of the rock checks,

01:41:11.350 --> 01:41:16.100
it would be a lot nicer, but yeah,

01:41:16.100 --> 01:41:25.960
I'll be glad to answer any questions.

01:41:25.960 --> 01:41:27.360
to my steering council members,

01:41:28.360 --> 01:41:33.060
what little information that didn't come fully out

01:41:33.060 --> 01:41:36.000
in the money and zoning hearing,

01:41:36.000 --> 01:41:38.200
which I'll take a little bit more time to do.

01:41:40.000 --> 01:41:43.480
This property was originally zoned and approved

01:41:43.480 --> 01:41:45.240
for the zone that it currently has,

01:41:45.240 --> 01:41:48.240
which is R2 to residential zoning district

01:41:48.240 --> 01:41:51.040
with a PUD agreement for certain types of development

01:41:51.040 --> 01:41:53.960
in the area over the entire acreage.

01:41:53.960 --> 01:41:55.320
It's a large acreage.

01:41:55.320 --> 01:41:58.880
that original approval came in 2005, 2006,

01:41:58.880 --> 01:42:01.240
that's when the original public hearings came,

01:42:01.240 --> 01:42:03.520
that came before the city council body.

01:42:03.520 --> 01:42:06.520
So it's been some time since those original approvals

01:42:06.520 --> 01:42:09.320
to when this is actually going to be built on.

01:42:09.320 --> 01:42:12.000
What's being asked tonight is an amendment

01:42:12.000 --> 01:42:15.360
to that original PUD agreement.

01:42:15.360 --> 01:42:16.720
They're not amending the zoning,

01:42:16.720 --> 01:42:18.800
they're not amending the base zone code

01:42:18.800 --> 01:42:21.960
of the R2 district, and Gerald went over the four or five

01:42:21.960 --> 01:42:23.760
things they're asking to amend,

01:42:23.760 --> 01:42:29.320
But the original approval with the master plan here,

01:42:29.320 --> 01:42:31.600
this master plan was the original master plan

01:42:31.600 --> 01:42:34.240
that was approved back in 2006,

01:42:34.240 --> 01:42:36.560
I guess I'll say the final approval.

01:42:36.560 --> 01:42:39.560
Part of that established the size of lots

01:42:39.560 --> 01:42:42.080
that can be built in certain areas.

01:42:42.080 --> 01:42:46.360
The areas down here are denoted as the state lots.

01:42:46.360 --> 01:42:49.120
Same with over here and up here.

01:42:49.120 --> 01:42:51.960
These middle areas are residential low density,

01:42:51.960 --> 01:42:54.840
residential medium density in the middle,

01:42:54.840 --> 01:42:57.570
residential medium density here,

01:42:57.570 --> 01:42:59.290
as well as here, and there was an element

01:42:59.290 --> 01:43:02.360
of potential commercial along Eastland.

01:43:02.360 --> 01:43:06.490
So the amendment takes the commercial away here.

01:43:06.490 --> 01:43:09.880
It further amends this area up here

01:43:09.880 --> 01:43:12.160
that is now disconnected from the rest of the piece

01:43:12.160 --> 01:43:15.530
because that trail is that black line right there.

01:43:15.530 --> 01:43:17.530
You can't effectively get to it

01:43:17.530 --> 01:43:20.490
from the internal development any longer.

01:43:20.490 --> 01:43:23.410
So they'll be accessing those three lots

01:43:23.410 --> 01:43:26.170
to have to be one acre from Pauline Road.

01:43:26.170 --> 01:43:28.300
So that's the second amendment.

01:43:28.300 --> 01:43:30.900
The pressurize of your occasion is the third amendment

01:43:30.900 --> 01:43:35.300
that they're seeking from the original.

01:43:35.300 --> 01:43:37.620
No one else can remember the other two ones.

01:43:37.620 --> 01:43:41.080
The other ones are roadway sections

01:43:41.080 --> 01:43:42.800
that you talked about having a median.

01:43:42.800 --> 01:43:44.880
That's not a typical roadway section.

01:43:44.880 --> 01:43:47.120
There's some others with the drainage on the sides.

01:43:47.120 --> 01:43:48.960
That's not a typical roadway section.

01:43:48.960 --> 01:43:52.600
The final version of what that looks like.

01:43:52.600 --> 01:43:56.750
We have a condition at the end of this that puts that.

01:43:56.750 --> 01:44:01.750
There'll be a little bit more discussion with our engineering department to figure out if the road drainage is going to work.

01:44:01.750 --> 01:44:10.750
So it doesn't undermine the road base of the collector, so that's something that we have a condition to have that kind of be modified a little bit,

01:44:10.750 --> 01:44:17.750
as well as a condition for the median to be a little bit further from Eastland so we can have a turn lane potentially in the future.

01:44:17.750 --> 01:44:23.130
So that's a condition you may see at the end of part of that men of our report.

01:44:23.130 --> 01:44:32.030
But they're proposing actually reduces the density, we call the density, the plant that

01:44:32.030 --> 01:44:36.270
was approved in this area could have had more lots.

01:44:36.270 --> 01:44:41.250
This is the preliminary plant overlaid onto this master plan.

01:44:41.250 --> 01:44:44.050
That's not something that this body has heard that the Planning and Zoning Commission did

01:44:44.050 --> 01:44:46.050
approve that preliminary.

01:44:46.050 --> 01:44:51.050
You will then see the final which would look substantially similar to that layout that

01:44:51.050 --> 01:44:52.050
you see up here.

01:44:52.050 --> 01:44:57.050
And that's really what Gerald spent a lot of this time talking about the look of the development.

01:44:57.050 --> 01:45:05.310
Most of those features, minus the few that he mentioned as far as the road section, the drainage, the PI.

01:45:05.310 --> 01:45:14.140
Those things are not part of the PUD. He could develop this with the current PUD as it's approved in a similar fashion.

01:45:14.140 --> 01:45:17.140
He's just asking for a few amendments based on the things that have changed.

01:45:17.140 --> 01:45:20.140
The trail section was the other, I guess the fifth section.

01:45:20.140 --> 01:45:27.140
Now that that's built, they want to take that condition of the original PUD out of that, so it's no longer part of the paperwork.

01:45:27.140 --> 01:45:35.140
The actual amendments are shown, I'm not going to this picture so fast, I'm sorry, right here.

01:45:35.140 --> 01:45:39.140
The blue and green are what's shown as the amendments.

01:45:39.140 --> 01:45:46.580
This is the new date of approval approved and subject to any additional conditions which I'll go over.

01:45:46.580 --> 01:45:51.900
The green has to do with the three lots that can be developed to SUI zone.

01:45:51.900 --> 01:45:56.480
I won't scroll through all of them because we've already talked about all of those.

01:45:56.480 --> 01:46:00.480
The actual impact, as far as the amendment that we're talking about tonight,

01:46:00.480 --> 01:46:03.480
not the overall development as it develops over time,

01:46:03.480 --> 01:46:11.480
the impact of the changes he's asking are minimal in our mind and in our review of it.

01:46:11.480 --> 01:46:17.500
However, as things develop and progress over this large acreage,

01:46:17.500 --> 01:46:19.500
There's going to be more people living out there.

01:46:19.500 --> 01:46:22.500
There's going to be houses where there used to be a pasture.

01:46:22.500 --> 01:46:24.500
Those are the impacts that people will see,

01:46:24.500 --> 01:46:27.500
but those are not really part of the amendment we're talking about.

01:46:27.500 --> 01:46:29.500
It's already entitled to develop to that,

01:46:29.500 --> 01:46:32.500
to have houses out there, to have people live out there.

01:46:32.500 --> 01:46:35.500
So the amendments we're really talking about are just minor changes

01:46:35.500 --> 01:46:40.500
to make the development functional based on those things we talked about.

01:46:40.500 --> 01:46:45.110
So on March 27th, the Applying and Zoning Commission held public hearing.

01:46:45.110 --> 01:46:52.110
The vote was 9-0 to recommend approval to the City Council and with the following conditions,

01:46:52.110 --> 01:46:58.110
one was subject to site plan amendments as required by building engineering fire and zoning officials

01:46:58.110 --> 01:47:01.110
to comply with applicable city codes and standards.

01:47:01.110 --> 01:47:06.110
Number two was subject to approval and recordation of the first amended PUD agreement.

01:47:06.110 --> 01:47:09.110
These could force him to board this agreement.

01:47:09.110 --> 01:47:14.110
Number three was subject to the typical size of the bar outage to be confirmed in the acceptable stormwater plan

01:47:14.110 --> 01:47:26.110
plan by the City Engineer. That was that stormwater on the sides of the roads. The number four was subject to a pedestrian slash bicycle path along Eastland Drive being designed and constructed by the developer as approved by city staff.

01:47:26.110 --> 01:47:30.110
construction to be completed by June 1st, 2021,

01:47:30.110 --> 01:47:34.590
or as separately agreed to between

01:47:34.590 --> 01:47:38.590
developer and city council. That gives the developer an option

01:47:38.590 --> 01:47:42.590
to come 2021 or 2022, bring

01:47:42.590 --> 01:47:46.590
a plan that the city council would then accept as a future date of construction

01:47:46.590 --> 01:47:50.590
of that. Kind of a way of things don't go according

01:47:50.590 --> 01:47:54.590
to plan. We get a sidewalk from Cheney up to the

01:47:54.590 --> 01:47:59.430
the Trailhead Park which is very essential to our network for pedestrian access. If that

01:47:59.430 --> 01:48:02.550
doesn't work, then the developer and city council would have a discussion on what that

01:48:02.550 --> 01:48:07.740
would look like in the future. The number five was subject to street islands of drainage

01:48:07.740 --> 01:48:11.260
fields being the responsibility of the homeowners association for maintenance and uniformity

01:48:11.260 --> 01:48:15.460
and management. The number six was subject to a final modified roadway section being

01:48:15.460 --> 01:48:19.700
approved by the city engineer. That dealt with that turn lane and the potential drainage

01:48:19.700 --> 01:48:43.880
the sides of the collector concludes our report. We have a Tyler Ellison. You want to go last?

01:48:44.520 --> 01:49:07.800
Come on down. How about carrying his open? I have my name is Tyler Ellison and I leave at

01:49:07.800 --> 01:49:17.360
2264 Candle Ridge Drive right there. Close. I also own a professional lot on the corner of

01:49:17.360 --> 01:49:24.660
Eastland and Village Park Avenue. This area of town is very professionally and personally

01:49:24.660 --> 01:49:29.460
investment for me. That's why I want to talk about this. I appreciate I'll take

01:49:29.460 --> 01:49:33.900
as close as I can to the PUD agreement. Mr. Martin is allowed to talk pretty

01:49:33.900 --> 01:49:38.020
free about development and the echo things he addressed here. I understand

01:49:38.020 --> 01:49:44.670
that 14 years ago this was okay or passed or the terminology is but why not

01:49:44.670 --> 01:49:50.870
act on it then. We'll bring that up but nothing was done on it. It was brought

01:49:50.870 --> 01:49:55.790
before us again after several communities little subdivisions have

01:49:55.790 --> 01:50:02.980
since gone in. I live in Canada Ridge, what's considered Canada East. There's 30-some mod

01:50:02.980 --> 01:50:06.800
developments in there. If you overlay that on his development, they're roughly the same

01:50:06.800 --> 01:50:10.900
size acreage. This was bottom of the planning of the zone, I just want to bring this up again.

01:50:10.900 --> 01:50:16.820
It states that there's going to be 58 roughly homes on 45 acres. Minus, 19 acres, that sits

01:50:16.820 --> 01:50:23.000
to the west right there in that parcel. These acre lots, to be honest with you, do not match

01:50:23.000 --> 01:50:28.440
the surrounding neighborhoods, the ones in my neighborhood are half an acre, the ones along

01:50:28.440 --> 01:50:34.150
the pole line are close to an acre, these lots are considerably smaller, they're considered

01:50:34.150 --> 01:50:38.550
a moderate density, for the place where it sits, this is me, this is turning into high density

01:50:38.550 --> 01:50:43.710
housing, it goes without saying but I'll say it out loud, what's the reason for that, why

01:50:43.710 --> 01:50:44.710
more lots?

01:50:44.710 --> 01:51:00.850
So that's my biggest concern is I live here, I plan to build an office right next to this,

01:51:00.850 --> 01:51:06.850
Before I'm very much invested on what this is going to turn into, I have no doubt that Mr. Mars will build a nice beautiful place.

01:51:06.850 --> 01:51:12.810
But it is literally going to be home next to home, next to home with not much of a yard at all.

01:51:12.810 --> 01:51:15.810
You're going to see homes, some landscape, and not a lot of grain.

01:51:15.810 --> 01:51:22.940
I guess I could go on and on be basically addressed most of it there.

01:51:22.940 --> 01:51:25.940
I'd like the Council to really consider that.

01:51:25.940 --> 01:51:28.940
This does, I think, apply very much this beauty.

01:51:28.940 --> 01:51:32.760
It's a looky bit there.

01:51:32.760 --> 01:51:34.760
One last thing I want to bring up, you mentioned it.

01:51:34.760 --> 01:51:38.620
mentioned it Mr. Mars as far as the trail goes if you can just map out where that

01:51:38.620 --> 01:51:47.460
will go but long east one will go it'll go right there if you stop right there

01:51:47.460 --> 01:51:54.150
Mike my subdivision right at that and has a portion of trail in it it goes right

01:51:54.150 --> 01:51:58.250
along East one and then dumps onto East one right around north to South Temple

01:51:58.250 --> 01:52:05.380
it's gone so our subdivision right there sits on an island if he goes to

01:52:05.380 --> 01:52:11.160
develop this there's one gentleman's place that stands in there of a couple

01:52:11.160 --> 01:52:17.120
100 yards where we sit on an island we're forced to go on to Eastland on the road. I run this several times a week

01:52:17.440 --> 01:52:21.070
And literally without running on somebody's private property on force. You're honest

01:52:21.650 --> 01:52:28.080
One thing I like the city considers this goes along and also Mr. Mars to consider is connected, please

01:52:28.740 --> 01:52:32.020
There are reasons and you do have an easement on that Joe's property

01:52:32.020 --> 01:52:36.930
Or it might be to do it at the planning is only they said they couldn't do it

01:52:36.930 --> 01:52:39.930
He said there's no we can do anything about that. It's gonna be like that

01:52:39.930 --> 01:52:44.930
But I know you can do it. I'm in a domain, whatever you call it. You can do it. And you can complete that trail and help us.

01:52:44.930 --> 01:52:46.350
Thank you.

01:52:46.350 --> 01:52:54.270
Stay safe, Campbell.

01:52:54.270 --> 01:53:15.320
Council members, thank you for your time tonight. I want to speak about this development openly, but I also want to clear some things here.

01:53:15.320 --> 01:53:25.320
So I'm speaking not only on the behalf of my ownership of property within the skyline development, which is directly tied to this, but I also own a residence within the willows.

01:53:25.320 --> 01:53:30.920
I'm also speaking for some of the residents of the willows tonight as we've held a meeting

01:53:30.920 --> 01:53:37.320
and I'm here to speak on their behalf and some of their comments are included in this document that was sent to you guys last week.

01:53:37.320 --> 01:53:47.760
So with that said, a couple of things that I want to address right off the bat are we represent a small portion of a homeowner group,

01:53:47.760 --> 01:53:53.660
group, a body of homeowners, it's in this entire area, candle ridge, skyline, the other

01:53:53.660 --> 01:53:58.380
ones that are associated next to the willows, show some heights, isn't any development out

01:53:58.380 --> 01:53:59.380
there.

01:53:59.380 --> 01:54:02.080
And what I want to address is a couple of things that I was actively involved in.

01:54:02.080 --> 01:54:07.620
I've talked with some of you before, and that's partially due to the Vision 2035 document

01:54:07.620 --> 01:54:10.740
that was put in front of you guys.

01:54:10.740 --> 01:54:17.560
One of the key elements of that, and I'm going to pull up a couple of notes here.

01:54:17.560 --> 01:54:21.320
There were some specific things that came out of the word cloud in that development.

01:54:21.320 --> 01:54:26.200
One is, improve or expand pedestrian sidewalks and trail access.

01:54:26.200 --> 01:54:30.080
That was one of the resounding things that came out of that document when the entire public

01:54:30.080 --> 01:54:35.000
and the entire portion of the city was pulled in that process.

01:54:35.000 --> 01:54:37.600
Manage growth had developed responsibly.

01:54:37.600 --> 01:54:42.550
That was the second largest word cloud that came out of that document.

01:54:42.550 --> 01:54:47.910
Another piece that was prior to that, they asked, what is key, what is the key things

01:54:47.910 --> 01:54:52.870
the attributes of this city, the small-town field, and the outdoor activities, those are

01:54:52.870 --> 01:54:58.230
two key things that came out of that document that frames how the city wants to develop.

01:54:58.230 --> 01:55:06.620
A couple of things that I want to hit on here. We support the responsible development of lands

01:55:07.180 --> 01:55:11.900
within Twin Falls and the surrounding impact areas. Further, we believe the intent of the

01:55:11.900 --> 01:55:15.660
preserved development is to provide an architecturally appealing development that

01:55:15.660 --> 01:55:23.660
I want to hands the property values of the adjacent lands and become a beautiful part of the City of Twin Falls, if developed responsibly.

01:55:23.660 --> 01:55:35.250
We feel though, there are some things that are on this here, and some of those items I'm going to address and you have this document in front of you.

01:55:35.250 --> 01:55:43.250
Any of you that have ever spent any time traveling down Hankins heading towards Evil Knievel's jump in any recent period of time

01:55:43.250 --> 01:55:48.290
time realizes that that is the main thoroughfare for people who walk their dogs ride their bikes

01:55:48.290 --> 01:55:54.850
run. It's a great access point. It has a connection from Evil Knievel's jump all the way to Morning Sun

01:55:54.850 --> 01:55:59.970
and the other developments that are out there to main access area. This development is going to

01:55:59.970 --> 01:56:05.330
exacerbate the issues that are associated with the traffic on Hankins. We're just talking about one

01:56:05.330 --> 01:56:09.250
piece of it here and the developer is doing a good job of trying to focus on. I'm only talking

01:56:09.250 --> 01:56:15.280
about this one section. It's a vision. That's the purpose behind the city is to develop reasonably.

01:56:16.290 --> 01:56:23.710
The full development connects this back into Hankins. It connects it back into other city streets.

01:56:25.010 --> 01:56:29.090
The roundabout that is shown in this development is intended to connect to Hankins.

01:56:30.130 --> 01:56:34.610
On Hankins, especially at the willows or social heights or these areas, there's only one in and out.

01:56:35.250 --> 01:56:40.370
We only have one way in and out of that area. We don't have a back row. We don't have any other

01:56:40.370 --> 01:56:44.690
access and emergency services come into questions on anything that's high

01:56:44.690 --> 01:56:51.700
volume. So from a safety standpoint, it's a great concern to us. As the phase

01:56:51.700 --> 01:56:55.080
development intersects with Hankins and Carrij Lane, the connections will

01:56:55.080 --> 01:56:59.620
ultimately drive traffic and pedestrians on to falls of Hankins. We believe the

01:56:59.620 --> 01:57:03.160
development must incorporate changes to the frontage along the linear length of

01:57:03.160 --> 01:57:06.880
Hankins property line. Additionally, we believe the city has to address the traffic

01:57:06.880 --> 01:57:11.180
and pedestrian impacts on Hankins through the allowance of additional

01:57:11.180 --> 01:57:16.540
developments such as social price and the extension of the canyon and trail system. Specifically,

01:57:16.540 --> 01:57:21.820
the city without addressing the traffic and conditions on Hankins has exacerbated the risk

01:57:21.820 --> 01:57:27.620
of a vehicle pedestrian incident. These are strong words, but I can tell you they're founded

01:57:27.620 --> 01:57:31.480
in fact. There have been a number of incidents where people have reported in all these developments

01:57:31.480 --> 01:57:35.900
of near misses. There's a lot of traffic and poor lighting. There's really no road lighting

01:57:35.900 --> 01:57:40.980
out there. It's a very narrow roadway. Enemy enters. Some of the developments that were done

01:57:40.980 --> 01:57:46.340
of the past actually have some form of curb and gutter on there, the others are very narrow

01:57:46.340 --> 01:57:52.310
still rural area. Therefore, we suggest the following changes to Hankins, which must be

01:57:52.310 --> 01:57:58.710
included as mandatory conditions for the developer and for the approval of the project. The willows,

01:57:58.710 --> 01:58:03.830
speaking on the homeowners that were associated with this, will support the project if the

01:58:03.830 --> 01:58:08.830
following items are incorporated into the design. I'm not going to ask for much, and

01:58:08.830 --> 01:58:13.920
and I'm going to quantify that here in a short period of time, but we believe in this first

01:58:13.920 --> 01:58:19.360
phase there needs to be something done to address Hankins and that needs to be either

01:58:19.360 --> 01:58:23.730
around about to conform with what the developers already proposed.

01:58:23.730 --> 01:58:29.090
I think that when he'd have formally adapted to what he's planning on the internals of the

01:58:29.090 --> 01:58:35.530
development, the second aspect of that is we think there needs to be buffer lanes and greenscaping

01:58:35.530 --> 01:58:39.490
which conforms with what he suggested within his development plan.

01:58:39.490 --> 01:58:45.490
However, that needs to be extended to Hankins, especially along the linear length of his development,

01:58:45.490 --> 01:58:56.980
so that we have meandering paths, and we have buffers between the roadway and the development.

01:58:56.980 --> 01:59:01.980
Second section that I wanted to discuss is construction traffic and development access times.

01:59:01.980 --> 01:59:06.980
It's been a key thing I've spoken to a lot of the homeowners that are in this area,

01:59:06.980 --> 01:59:10.980
and the associated area and everyone's greatly concerned about the fact that,

01:59:10.980 --> 01:59:14.700
The construction types for this large image of element as it's currently platted

01:59:14.700 --> 01:59:20.000
And you can correct me if I'm wrong there's over 1000 building lots in this entire development

01:59:20.000 --> 01:59:26.500
Correct. It's clatted that way. It's what shows the table. So how many ultimate building lots would there be?

01:59:26.500 --> 01:59:35.930
Yes, we have one preliminary plan, so that's not actually the final plan

01:59:35.930 --> 01:59:40.370
So there's no confirmed number of lots because it hasn't been planted yet

01:59:40.370 --> 01:59:49.630
If we consider the lots that are currently preliminary platted

01:59:49.630 --> 01:59:57.470
and you overlay that over that development, there be potentially 400 homes developed

01:59:57.470 --> 02:00:03.810
within that cloud without any changes in density. It's a lot of foot traffic where those people

02:00:03.810 --> 02:00:07.170
are going to go, how are they going to get to the tram? Those are the questions we ask.

02:00:07.170 --> 02:00:11.650
During the construction periods, what we're asking for is at least some kind of constraints put on

02:00:11.650 --> 02:00:17.170
by the city so that one, it doesn't affect the harmonious activities of the lifestyles of the

02:00:17.170 --> 02:00:19.250
of the individuals that are in this area.

02:00:19.250 --> 02:00:23.330
Large developments of this style, they can be very disruptive.

02:00:23.330 --> 02:00:26.130
We've all invested a great deal to live in these areas,

02:00:26.130 --> 02:00:28.530
and we would like to have at least a harmonious life

02:00:28.530 --> 02:00:30.850
to where construction occurs during the normal business

02:00:30.850 --> 02:00:32.050
hours as an ask.

02:00:32.050 --> 02:00:34.650
We'd like to see you impose some of those restrictions

02:00:34.650 --> 02:00:37.060
on this development.

02:00:37.060 --> 02:00:42.200
Additionally, we believe that this is a great location

02:00:42.200 --> 02:00:45.240
and a great area for you to start imposing dark sky

02:00:45.240 --> 02:00:47.540
ordinances.

02:00:47.540 --> 02:00:49.060
That's one of the aspects of the willows.

02:00:49.060 --> 02:00:53.500
This is one of the aspects of Skyline and some of the beautiful things that happen out there in the canyon

02:00:53.500 --> 02:00:57.420
Ramis, I can actually stand out in my backyard, look up at 9 seed stars.

02:00:57.420 --> 02:01:02.470
It was one of the development agreements within the willows, it's a through-be-know-up lighting.

02:01:02.470 --> 02:01:07.560
There is no up lighting, it's dark, it's very nice.

02:01:07.560 --> 02:01:12.720
We think that reasonably this should be something that's placed on the development plan,

02:01:12.720 --> 02:01:21.160
so that the developer has to conform to those standards to keep that nice urban slash residential interface

02:01:21.160 --> 02:01:25.320
and to a country, moderate agricultural interface.

02:01:25.320 --> 02:01:28.160
That's really what it is and sandwich in between that.

02:01:28.160 --> 02:01:32.820
So those are some of the things that we've asked.

02:01:32.820 --> 02:01:34.820
A couple other facts that we wanted to throw out

02:01:34.820 --> 02:01:38.820
because there's been some statements by others that they've said,

02:01:38.820 --> 02:01:41.820
well, how would the city pay for this and how would that work?

02:01:41.820 --> 02:01:44.940
So I've got a few numbers here.

02:01:44.940 --> 02:01:48.940
If 400 homes are developed and the average sale price of a lot,

02:01:48.940 --> 02:01:50.940
I'd be very conservative on this.

02:01:50.940 --> 02:01:56.700
$26 million in gross revenue.

02:01:56.700 --> 02:02:04.140
Average home value $275,000 is the city's current published tax rate of 0.0765930 is

02:02:04.140 --> 02:02:08.500
$2,106.30 per home collected.

02:02:08.500 --> 02:02:10.340
That's based on the current rate.

02:02:10.340 --> 02:02:13.340
400 homes, $842,523,000 annually.

02:02:13.340 --> 02:02:17.970
A lot of money, a lot of revenue.

02:02:17.970 --> 02:02:20.430
You can get a lot done with that.

02:02:20.430 --> 02:02:23.630
So with one in access in and out of the willows,

02:02:23.630 --> 02:02:26.240
in and out of Shoshan Heights,

02:02:26.240 --> 02:02:28.480
the congestion's on Hankins Road,

02:02:28.480 --> 02:02:31.800
as I've shown here in the documents that you have,

02:02:31.800 --> 02:02:35.520
we're asking that it's imposed upon the developer

02:02:35.520 --> 02:02:38.600
to include those attributes within his section

02:02:38.600 --> 02:02:40.600
that runs along Hankins Road,

02:02:40.600 --> 02:02:43.040
all of his property line development,

02:02:43.040 --> 02:02:45.920
and that the city addressed it from an overall road

02:02:45.920 --> 02:02:50.210
and master plan to address the issues with the traffic

02:02:50.210 --> 02:02:56.960
the walkways and the access to that area. Now I can speak frankly and say that I do

02:02:56.960 --> 02:03:01.160
own the property on the corner of Falls Avenue at Hankins and I've already

02:03:01.160 --> 02:03:05.360
discussed with the city plans to allow them to bring the trail around there

02:03:05.360 --> 02:03:09.560
because I think it's an issue. They improved one section of the corner there by

02:03:09.560 --> 02:03:14.770
the Boy Scouts Center. The fence has already sat back. I think that that needs

02:03:14.770 --> 02:03:21.110
to happen along there and that's giving up property on that corner. I think it's

02:03:21.110 --> 02:03:26.090
It's reasonable that we impose that on the developer and it becomes part of the master

02:03:26.090 --> 02:03:28.850
plan as an amendment which you can do.

02:03:28.850 --> 02:03:33.080
You have the power to do that.

02:03:33.080 --> 02:03:34.720
I really appreciate your time.

02:03:34.720 --> 02:03:37.820
These documents are available for you in review.

02:03:37.820 --> 02:03:46.140
If you have any questions for me.

02:03:46.140 --> 02:03:53.380
Seems like a major concern is the density of the overall alleged 400-on-lots that you're

02:03:53.380 --> 02:04:01.430
You're realizing that this is offset in a PUD by open space that concentrates housing

02:04:01.430 --> 02:04:08.930
but provides open space to break away from that or setting that you're taking this all

02:04:08.930 --> 02:04:10.430
into consideration, I guess.

02:04:10.430 --> 02:04:15.430
I have and what I'm really concerned about is it's not a solid housing development.

02:04:15.430 --> 02:04:16.430
Absolutely.

02:04:16.430 --> 02:04:17.430
We understand that.

02:04:17.430 --> 02:04:20.830
We think that architecturally, we think that the journal of Marx is going to do a good

02:04:20.830 --> 02:04:23.790
job of trying to aesthetically make this appealing.

02:04:23.790 --> 02:04:28.700
concerned about where those people are going to go, they're going to want to take the trail

02:04:28.700 --> 02:04:34.510
to get down to Shoshan Falls. They're going to want to access all of those areas. The people

02:04:34.510 --> 02:04:39.070
that live in Shoshan Heights already put up signs, big signs to say private property do

02:04:39.070 --> 02:04:42.270
not come on here because there's so much traffic in there for people trying to seek their way

02:04:42.270 --> 02:04:48.670
out to even the needles jump. This is going to get much worse. It's shown in front of

02:04:48.670 --> 02:04:53.390
you right there in black and white. It's going to connect the hankins. It's going to connect

02:04:53.390 --> 02:05:01.180
to carriage. What we don't want to do is be irresponsible and impose this on the development

02:05:01.180 --> 02:05:07.020
plan at this stage so that later on when it does become a major issue, we have no control

02:05:07.020 --> 02:05:14.250
over it. Now is the time to put some of those things in place in order to protect the assets

02:05:14.250 --> 02:05:18.970
of the city. We believe that the access down hankons and the evil canals jump is very important

02:05:18.970 --> 02:05:23.980
to the city. We appreciate it. We just want it to be reasonable development with safety

02:05:23.980 --> 02:05:32.780
and those are some of those key attributes. Any other questions?

02:05:32.780 --> 02:05:39.760
We have Will Castro, Costello?

02:05:39.760 --> 02:05:53.650
[Muted for privacy: home address]

02:05:53.650 --> 02:05:58.030
[Muted for privacy: home address]

02:05:58.030 --> 02:06:02.030
[Muted for privacy: home address]

02:06:02.030 --> 02:06:06.030
[Muted for privacy: home address]

02:06:06.030 --> 02:06:11.580
of the housing. Even with the green space I am concerned about the density

02:06:11.580 --> 02:06:16.200
about the density and it is a little disruptive even with the

02:06:16.200 --> 02:06:20.040
finishing of the canyon rim trail you said Greg you'd like to go up there and

02:06:20.040 --> 02:06:24.600
enjoy it it's a great addition to the city but I can say that living on that road

02:06:24.600 --> 02:06:29.800
the parking structure isn't big enough for the people that go there I mean

02:06:29.800 --> 02:06:34.320
it's unbelievable how have such a like a postage stamp for the amount of

02:06:34.320 --> 02:06:39.200
oil in there so and that's not that many people so you introduce a subdivision

02:06:39.200 --> 02:06:44.480
with a lot more, you know, 400 houses, that is going to be disruptive from the standpoint

02:06:44.480 --> 02:06:51.700
[Muted for privacy: home address]

02:06:51.700 --> 02:06:57.970
[Muted for privacy: home address]

02:06:57.970 --> 02:07:01.130
[Muted for privacy: home address]

02:07:01.130 --> 02:07:05.290
[Muted for privacy: home address]

02:07:05.290 --> 02:07:09.970
of mine too is just the repair of making sure that that road is maintained appropriately.

02:07:09.970 --> 02:07:16.370
Just a couple of points. I think it's just it all can be done. I think it's just gonna be planned appropriately

02:07:18.970 --> 02:07:57.570
[Muted for privacy: home address]

02:07:59.850 --> 02:08:06.170
[Muted for privacy: home address]

02:08:07.190 --> 02:08:10.550
Went into the barrow pit right next to the parking lot because it's not

02:08:11.310 --> 02:08:12.990
It's not

02:08:12.990 --> 02:08:18.790
No signs or anything to tell him where the roadway was to get into that parking lot and he just drove off the side of Eastland

02:08:19.350 --> 02:08:22.770
And down straight down. He just knows died into the borrow pit

02:08:22.770 --> 02:08:25.950
So it's it is dangerous. It needs needs help

02:08:27.600 --> 02:08:29.640
My concern is those four acres

02:08:30.640 --> 02:08:32.640
Across the street from my house

02:08:33.040 --> 02:08:37.060
They are in the preserve

02:08:37.540 --> 02:08:43.150
But they have access on our private road that starts at pillar falls

02:08:43.150 --> 02:08:45.590
So that is a private road.

02:08:45.590 --> 02:08:50.310
I addressed the planning and zoning meeting and Gerald Martin said that they would repair

02:08:50.310 --> 02:08:55.390
those roads when the houses were being built, but we have a private road, we maintain that

02:08:55.390 --> 02:09:03.750
road, we pay to pay that road, we pay for our own snow removal, so I don't understand

02:09:03.750 --> 02:09:11.150
how those three houses that would be in that location can be part of their preserve and

02:09:11.150 --> 02:09:23.110
be part of my subdivision. That makes any sense. They would have press raise irrigation from

02:09:23.110 --> 02:09:31.260
the preserve, but they are part of my subdivision, so we have a continued long-term repair of

02:09:31.260 --> 02:09:38.970
that road. How would they be addressed to help us maintain that road? Will they be required

02:09:38.970 --> 02:09:54.600
and to access that. That is all I have. And I also want to make sure that when he develops those four acres, that's

02:09:54.600 --> 02:10:01.980
Peller Falls. Peller Falls meanders through those four acres. And so will Peller Falls still exist? Will we still have

02:10:01.980 --> 02:10:10.400
Peller Falls that everybody comes in and walks down to? So I want to make sure that is still. I would like to see that continue.

02:10:10.400 --> 02:10:13.380
Thank you very much.

02:10:13.380 --> 02:10:27.670
Time you can ask quickly. Is that the name of the stream that runs south to north? Is that the name of the stream?

02:10:27.670 --> 02:10:29.670
The falls is down the canyon of course

02:10:37.340 --> 02:10:41.800
Okay

02:10:41.800 --> 02:10:49.680
Is there anyone outside? I have nobody else on the sign if she did anybody else come to speak to this issue tonight

02:10:50.200 --> 02:10:53.220
Right, we'll close the public hearing

02:11:13.910 --> 02:11:33.920
with and participated in the cost of paving that road and the maintenance there of as

02:11:33.920 --> 02:11:43.200
though we were the other residents on that street.

02:11:43.200 --> 02:11:49.400
Road discussion, Hank and Road fronts on this project, actually the right-of-way for almost

02:11:49.400 --> 02:11:53.320
all of it is not within the boundaries of this property.

02:11:53.320 --> 02:12:01.560
We extended the chainy over to Hank and because that's the requirement of the city as a connection.

02:12:01.560 --> 02:12:08.270
several phases away in this development and I don't disagree that around about it

02:12:08.270 --> 02:12:12.750
that location would be good when we get to develop in that phase will work with

02:12:12.750 --> 02:12:16.790
the city on the design that the city feels as most appropriate for the

02:12:16.790 --> 02:12:23.190
connection of Chaney and Hankins but it's several phases away in development

02:12:23.190 --> 02:12:33.310
dark sky is a great idea and it will be in the CCNR as it turns on lighting a

02:12:33.310 --> 02:12:38.310
A couple of other things that wasn't getting into the details of the CCNRs, but there will

02:12:38.310 --> 02:12:40.790
be no screening fences on this project period.

02:12:40.790 --> 02:12:47.100
It'll be left open if you have a fence to contain your dog, it will be right on her.

02:12:47.100 --> 02:12:52.690
We'll walk to everybody to share in the green space.

02:12:52.690 --> 02:12:58.450
We don't want to fight for six foot or seven foot, vinyl or wood or fence.

02:12:58.450 --> 02:13:06.530
That's why I'm removing the berm along the along the eastland, reduce sight through that

02:13:06.530 --> 02:13:16.530
So that it opens it up to the neighborhood, to the green space, there is going to be a lot of open space throughout this project,

02:13:16.530 --> 02:13:22.530
partially because of the water, partially because of the rock, and partially because of the design.

02:13:22.530 --> 02:13:34.130
But we are going to obviously have to be very careful as we go through the initial phases because we can create our own opposition.

02:13:34.130 --> 02:13:38.850
if we don't clearly demonstrate what's going to be open, what's going to remain open.

02:13:38.850 --> 02:13:50.440
That will be part of the master plan that we use as part of our marketing entity.

02:13:51.560 --> 02:13:56.280
We're half on this fish phase. We're half of what that zoning allows for.

02:13:57.560 --> 02:14:02.760
We spend a lot of time working with marketing people and what people are looking for,

02:14:02.760 --> 02:14:12.470
elimination of fences, elimination of those type of barriers, give it a much more open

02:14:12.470 --> 02:14:22.980
feel. Everybody to be able to see this, want to fence a screening fence all the way around

02:14:22.980 --> 02:14:27.740
your lot and create your own little island that you probably don't want to buy in this

02:14:27.740 --> 02:14:34.770
subdivision. But I've seen very many. In today's market, there's a big demand for that open

02:14:34.770 --> 02:14:43.080
get to know your neighbor. Patable landscaping. Commonly met landscape.

02:14:43.080 --> 02:14:50.900
Furnages commonly maintained facilities. I hope I'm right and I believe I am.

02:14:50.900 --> 02:14:59.500
And the people that are moving here in the next generation. Much more

02:14:59.500 --> 02:15:07.900
appreciative of the nature, the life, the open space, the trails, type of things and

02:15:07.900 --> 02:15:12.900
We will put the dark sky in the CCNRs.

02:15:12.900 --> 02:15:15.900
We'll have to work with the city on street lighting,

02:15:15.900 --> 02:15:18.900
but this will not have the standard seat.

02:15:18.900 --> 02:15:22.900
This will be light morning, so we will put custom street lights in.

02:15:22.900 --> 02:15:26.900
We can identify street lights that are dark sky.

02:15:26.900 --> 02:15:30.900
Don't light the sky, light the pavement, not the sky,

02:15:30.900 --> 02:15:32.900
light the trail, not the sky.

02:15:32.900 --> 02:15:39.970
I think those are the questions that I've asked one.

02:15:39.970 --> 02:16:10.320
Well, obviously on the commit that's on the screen that shows the allowed density that's

02:16:10.320 --> 02:16:19.200
Was owning some 12 or 15 years ago that matches his owning for

02:16:19.960 --> 02:16:31.840
basically R2 on R1 type zoning. You can't get that, you could, but you could afford to get that because of the

02:16:31.840 --> 02:16:40.890
Mount of Rock on the photography out there. I think the total density is going to be somewhere in the neighborhood of half of that if it's

02:16:41.490 --> 02:16:49.240
market, that is going to be market driven. I can see

02:16:49.240 --> 02:17:00.360
more estate lots and fewer R2 lots as it develops because of the topography

02:17:00.360 --> 02:17:09.040
it's easier to develop a three-quarter one-acre lot than it is a quarter-acre

02:17:09.040 --> 02:17:15.660
lot because you can be under around some of those rock outcroppings

02:17:15.660 --> 02:17:21.820
corporate them into a lot and corporate them as a architectural feature but not

02:17:21.820 --> 02:17:26.980
have to move the rock and so I think you'll see that as it moves east you'll get

02:17:26.980 --> 02:17:35.540
more state lots fewer of the more typical residential lots. It gets rock here as

02:17:35.540 --> 02:17:44.770
you go east. The West

02:17:44.770 --> 02:17:48.790
That answer your question?

02:17:48.790 --> 02:17:49.290
Yes.

02:17:49.290 --> 02:17:49.790
Thank you.

02:17:49.790 --> 02:17:50.790
Chris Cockerton?

02:17:50.790 --> 02:17:55.790
Chris kind of goes back to basics on the PUD coming into the city trail.

02:17:55.790 --> 02:18:02.590
The property will of course be on the city water and waste water and a pressurized irrigation system.

02:18:02.590 --> 02:18:05.590
I'm not the city pressure, private pressurized irrigation.

02:18:05.590 --> 02:18:10.670
How about the waste water and the potable water?

02:18:10.670 --> 02:18:17.170
The city water, the city sewer and of course all of the other things you have to laugh now, cable and...

02:18:17.170 --> 02:18:41.790
for staff, not for general.

02:18:41.790 --> 02:18:51.810
Jonathan or the planning department or city staff,

02:18:51.810 --> 02:18:54.810
there was a mention of Hagen Road, Hagen Road,

02:18:54.810 --> 02:18:59.810
and I understand that most of it would be adjacent

02:18:59.810 --> 02:19:01.810
to Shoshan Heights as well,

02:19:01.810 --> 02:19:04.810
and so was there any plans in the

02:19:04.810 --> 02:19:06.810
and our discussions with Shoshan Heights

02:19:06.810 --> 02:19:10.420
when they went in about the extension of Hagen Road?

02:19:10.420 --> 02:19:13.420
I'm not aware of the extent of those discussions

02:19:13.420 --> 02:19:14.420
with Shoshan Heights.

02:19:14.420 --> 02:19:16.720
Confirm the two areas that they have butt

02:19:17.120 --> 02:19:19.120
Hankins are right here

02:19:19.120 --> 02:19:22.360
and it jogs around the house

02:19:22.360 --> 02:19:26.670
It comes back for

02:19:26.670 --> 02:19:30.500
They don't actually have a lot of Hankins throat frontage

02:19:30.500 --> 02:19:33.500
We're talking about the preserve itself

02:19:33.500 --> 02:19:34.000
Right

02:19:34.000 --> 02:19:36.000
We know Cheney

02:19:36.000 --> 02:19:38.000
The plan for Cheney is to come through

02:19:38.000 --> 02:19:40.000
and have a connection over to this area

02:19:40.000 --> 02:19:43.500
because that would follow our grid of that quarter

02:19:43.500 --> 02:19:45.500
It's a quarter mile

02:19:45.500 --> 02:19:47.500
To connect those between the arterials

02:19:47.500 --> 02:19:55.720
the other quarter miles. So that connectivity is important for all forms of traffic. That's

02:19:55.720 --> 02:20:01.040
including pedestrian, bicycle, roller skates, scooter, whatever you want to call, whatever

02:20:01.040 --> 02:20:05.960
you want to get on there, including cars. So we know that the plan is to connect it to

02:20:05.960 --> 02:20:12.810
Ankins Road. As far as the discussions with Shoshan Heights, I was not personally involved

02:20:12.810 --> 02:20:18.690
in those discussions, but I can't say that this is the City Limit Line. The Preserve

02:20:18.690 --> 02:20:21.810
is what's in city limits and everything else out here.

02:20:21.810 --> 02:20:24.730
It's not in city limits unless it's our property

02:20:24.730 --> 02:20:30.050
and we have an access road to the jumpside

02:20:31.170 --> 02:20:34.370
that is parallel to this eastern boundary.

02:20:34.370 --> 02:20:38.080
Although that is not hand control itself.

02:20:38.080 --> 02:20:40.600
We connect to hand control down here.

02:20:40.600 --> 02:20:44.200
Small portion right here.

02:20:44.200 --> 02:20:46.600
And we have the gun range which is further to the east.

02:20:46.600 --> 02:20:48.490
It does not.

02:20:48.490 --> 02:20:50.450
But hand control, our property kinda comes up

02:20:50.450 --> 02:20:58.060
around into the canyon, connects with this at the jump site, bigger and this is

02:20:58.060 --> 02:21:04.420
Turkey's Lake and Shushun, our property, the gun raid and the Shushun falls over here.

02:21:04.420 --> 02:21:11.010
Well, Greg, I was around with Shushun falls, came in the subdivision of Shushun

02:21:11.010 --> 02:21:16.870
Heights, I mean, Hankins Road, as a city arterial, will stop at that

02:21:16.870 --> 02:21:22.370
intersection with Cheney, it does not continue north of Cheney, it is down

02:21:22.370 --> 02:21:28.690
upgraded to a residential street and it goes north and they even renamed it and

02:21:28.690 --> 02:21:32.990
it goes into the subdivision of Chishol Heights. This kind of me enters through

02:21:32.990 --> 02:21:39.810
the subdivision a little bit but it as a city arterial, Anken's does not continue

02:21:39.810 --> 02:21:48.520
north of the intersection with Cheney. Thank you, Madam.

02:21:48.520 --> 02:21:57.830
So really the PUD, the density and all that has been previously approved by the city.

02:21:57.830 --> 02:22:04.800
2006 and really what we're discussing tonight are those five changes to it

02:22:05.480 --> 02:22:15.430
What else we're hearing on some of these other things? Yeah, and that you know with large developments of 347 acres

02:22:16.430 --> 02:22:18.430
It's not uncommon to have that

02:22:18.470 --> 02:22:27.970
Something like this take a while to get developed as far as having any conditions that would amend some of that

02:22:30.530 --> 02:22:33.890
Planning perspective. I think that would be rough trying to have the

02:22:33.890 --> 02:22:39.290
what they're asking for in the condition that may or may not connect to what

02:22:39.290 --> 02:22:46.290
they're asking for. The reasonable nexus is what we're going for. I think it's a tough

02:22:46.290 --> 02:22:52.260
that'd be tough to do. I just want to make sure I was understanding correctly. Thank you.

02:22:52.260 --> 02:23:21.010
The folks that have shown up that the urban surrounding area to the one-in-quest

02:23:21.010 --> 02:23:29.800
can take this so many times over the years where existing growth is encroached

02:23:29.800 --> 02:23:32.280
upon my new growth coming in.

02:23:32.280 --> 02:23:36.260
It's the most difficult thing we have to encounter.

02:23:36.260 --> 02:23:38.700
And I don't go out the way,

02:23:38.700 --> 02:23:41.420
because I think some of you like to keep that space open

02:23:41.420 --> 02:23:45.500
for eternity, and I could probably agree with that myself,

02:23:45.500 --> 02:23:48.700
but the best protection the city can provide

02:23:48.700 --> 02:23:51.940
is to go through our ordinances,

02:23:51.940 --> 02:23:54.260
especially the one that allows the PUD

02:23:54.260 --> 02:23:56.540
to give you the open space for pufferin'.

02:23:56.540 --> 02:24:04.540
I have some great deal with some great hesitation because of the potential density of the homes.

02:24:04.540 --> 02:24:14.120
But it's in compliance with our city ordinances, the attached conditions fiber, so conditions are,

02:24:14.120 --> 02:24:18.120
I think a reasonable upgrade request with protection.

02:24:18.120 --> 02:24:26.120
I don't know of a white bridge to the gap because it's such a dichotomous yes or no black or white issue.

02:24:26.120 --> 02:24:30.500
issue. It's not an easy decision for us to make.

02:24:30.500 --> 02:24:41.900
I would like to speak to it a little bit. This is an area where there is a great demand and

02:24:41.900 --> 02:24:50.840
we do want to do it responsibly. And I have lived out in that area and the wide open space

02:24:50.840 --> 02:25:00.360
is really appealing. What's being proposed has a lot of wide open space. And I think

02:25:00.360 --> 02:25:14.330
As we continue to grow, this is a great location, and the reason it hasn't been developed is because it's really challenging.

02:25:14.330 --> 02:25:25.640
We have somebody that has presented a really nice idea that has been supported through planning and zoning and all the things that they've gone through.

02:25:25.640 --> 02:25:33.700
So far I appreciate those who came and spoke I can I can really empathize with because I used I don't live that far now

02:25:33.700 --> 02:25:40.820
But I used to live out in that area and I think there this is proceeding with a nice way to do this

02:25:40.820 --> 02:25:48.850
But I I also believe this this is a huge project and we're growing but we're not growing that fast

02:25:48.850 --> 02:25:51.090
This is not going to happen and

02:25:51.090 --> 02:26:02.330
And as this first piece is developed and the process continues, I think during that amount

02:26:02.330 --> 02:26:11.560
of time, good decisions can be made as it goes, setting everything in stone right now may not

02:26:11.560 --> 02:26:16.400
be in the best interest of everybody who already even lives out there.

02:26:16.400 --> 02:26:22.980
But we do want logical, responsible growth, absolutely.

02:26:22.980 --> 02:26:29.980
But I don't know that putting a big list of things that has to be done for the way future

02:26:29.980 --> 02:26:36.980
right now is in the best interest of things change and as our town continues to develop,

02:26:36.980 --> 02:26:43.980
I think we want the flexibility of what some of the next phases may produce.

02:26:43.980 --> 02:26:50.980
So within the scope of what's been presented and the order in which it's going to be developed,

02:26:50.980 --> 02:26:53.980
I think I would be in support of this.

02:26:53.980 --> 02:26:57.480
Suzanne, yep.

02:26:57.480 --> 02:26:59.350
I think this question is for you.

02:26:59.350 --> 02:27:04.350
We had a couple comments about the parking area at the trailhead where we're at.

02:27:04.350 --> 02:27:06.350
I know we have some things coming.

02:27:06.350 --> 02:27:12.350
Maybe you could just speak to that for a minute so folks know that we know the parking lot needs attention out there.

02:27:12.350 --> 02:27:27.640
That's kind of funny because when we were doing the plans for that, I told Gerald and Wendy 15 spaces out there.

02:27:27.640 --> 02:27:28.640
They didn't listen to me.

02:27:28.640 --> 02:27:30.640
They put 27 out there.

02:27:30.640 --> 02:27:34.640
And it's inadequate, completely inadequate.

02:27:34.640 --> 02:27:36.640
We need to double that lot.

02:27:36.640 --> 02:27:44.230
Wendy's got absolutely aware and we've been talking about how that property is developing.

02:27:44.230 --> 02:27:48.680
She's got plans that a restroom has also been talked about in that park,

02:27:48.680 --> 02:27:53.980
while it's maybe doubling the size of that parking lot.

02:27:53.980 --> 02:27:55.980
It probably won't be, I mean, this three acres park.

02:27:55.980 --> 02:27:58.980
It probably won't be much more than parking lot in the restroom.

02:27:58.980 --> 02:28:02.430
We're all sitting down with it, so that's coming.

02:28:02.430 --> 02:28:03.430
We know.

02:28:03.430 --> 02:28:08.950
But we are going to improve that parking and get signage and it's not quite finished

02:28:08.950 --> 02:28:13.150
just yet what somebody mentioned the driveway going in and out of it and that was something

02:28:13.150 --> 02:28:18.150
that we honestly didn't have time to finish before that cold weather came and that's

02:28:18.150 --> 02:28:21.950
still yet to come is to make the final driveway location.

02:28:21.950 --> 02:28:24.070
That'll happen here pretty soon.

02:28:24.070 --> 02:28:25.070
Thank you.

02:28:25.070 --> 02:28:28.390
Just want to make sure that citizens were aware that we are aware and we're going in

02:28:28.390 --> 02:28:29.390
that direction.

02:28:29.390 --> 02:28:31.510
Rick, Lanting?

02:28:31.510 --> 02:28:36.170
Well, I have the Chris may have been part of this.

02:28:36.170 --> 02:28:45.880
I was actually on planning zoning when this first came in way back with 14 years ago.

02:28:45.880 --> 02:28:48.880
Then I happened to be on council when we approved it.

02:28:48.880 --> 02:28:51.880
I got to see it both times then.

02:28:51.880 --> 02:28:57.880
I'm struck by the difference and the number of people appearing to be concerned by it.

02:28:57.880 --> 02:29:04.360
I don't remember a single soul speaking 14 years ago, maybe I'm wrong, but I don't think

02:29:04.360 --> 02:29:13.400
there was at either time because of the fact that the vast amount of open space and the

02:29:13.400 --> 02:29:23.090
state lots to the east, which was to protect those larger lots over there, I'm very familiar

02:29:23.090 --> 02:29:29.530
with Mr. Mark's work, I'm certain and he is the information I have from him and others

02:29:29.530 --> 02:29:36.650
about this is kind of his baby so to speak to make sure this is a great

02:29:36.650 --> 02:29:42.050
addition to the city of Twin Falls and I will be in favor of it and because

02:29:42.050 --> 02:29:47.970
partially because my confidence in him to make it the best development possible

02:29:47.970 --> 02:29:54.990
and like I said this property has been waiting to develop for a really long

02:29:54.990 --> 02:30:00.030
time and the market is now there for it to develop probably not very quickly

02:30:00.030 --> 02:30:07.120
I'm pretty sure by the time you get all the way to the east I'm not going to be on this council any longer so

02:30:07.840 --> 02:30:11.120
I will be voting in favor of this and if we're ready for emotion

02:30:15.520 --> 02:30:17.520
That's okay

02:30:22.130 --> 02:30:27.490
Just those that are out there, I know that I'm planning and zoning we've talked about roads

02:30:30.090 --> 02:30:32.090
What is the process?

02:30:33.930 --> 02:30:37.510
improving roads in a situation like this where we've gone from

02:30:37.510 --> 02:30:41.710
more of a country road and recognizing as Mitch pointed out

02:30:41.710 --> 02:30:44.670
the entire way to the canyon or to the gem site isn't

02:30:44.670 --> 02:30:48.790
isn't city road but what is that process if you can just kind of go over that

02:30:48.790 --> 02:30:50.430
okay so

02:30:50.430 --> 02:30:52.790
when a developer such as Joe comes in

02:30:52.790 --> 02:30:56.430
and I'll use the example of what we have on this western side

02:30:56.430 --> 02:30:58.070
he's planning

02:30:58.070 --> 02:31:01.990
this area he came in for preliminary plan for this general area

02:31:01.990 --> 02:31:06.990
When that occurs, they identify the public roadway

02:31:07.150 --> 02:31:10.590
that they're going to dedicate to the public.

02:31:10.590 --> 02:31:12.830
City is a purveyor of the public, quote unquote,

02:31:12.830 --> 02:31:15.390
the public in our jurisdiction.

02:31:15.390 --> 02:31:17.230
And when it's not in our jurisdiction,

02:31:17.230 --> 02:31:20.830
that roadway is not necessarily dedicated in the county.

02:31:20.830 --> 02:31:22.030
They use that as easements,

02:31:22.030 --> 02:31:24.030
it's an easement from the center of the roadway.

02:31:24.030 --> 02:31:26.070
And they do 25 feet from either side of that

02:31:26.070 --> 02:31:28.220
center of the roadway line.

02:31:28.220 --> 02:31:29.660
When it comes in for development,

02:31:29.660 --> 02:31:32.260
they would then develop or build.

02:31:32.260 --> 02:31:38.660
They've built the road according to the standards that we have in engineering, but I'm not sure

02:31:38.660 --> 02:31:42.860
what the name of it is, but it's like a city standard drawing or ISPWC standard drawing

02:31:42.860 --> 02:31:48.710
of here's how wide the road is, here's the curve, the gutter to sidewalk.

02:31:48.710 --> 02:31:52.390
So in his case he came in, developed this portion, he's going to build certain roads

02:31:52.390 --> 02:31:57.710
to those standards, he dedicates the roadway to the city or the public.

02:31:57.710 --> 02:31:59.790
That's how the roads get built.

02:31:59.790 --> 02:32:05.030
So when he comes over here to the eastern side, and this starts to be planted preliminary and

02:32:05.030 --> 02:32:13.790
then final, they would propose what those roads look like per the city's standard in theory.

02:32:13.790 --> 02:32:17.870
There's other standards, not just their typical section, we have other sections that potentially

02:32:17.870 --> 02:32:22.910
around about that might be in there, I'm not an engineer, so I don't know everything that

02:32:22.910 --> 02:32:24.200
book.

02:32:24.200 --> 02:32:30.780
So when we're talking about hankins specifically, when it gets preliminary planted, that is when

02:32:30.780 --> 02:32:35.740
that roadway is identified as being dedicated, and that's when the road sections that they're

02:32:35.740 --> 02:32:42.990
talking about could possibly be shown with those modifications they were looking at or

02:32:42.990 --> 02:32:50.510
the exhibit you saw. In this case, it's a very small section of Hinkins that's on Mr. Martin's

02:32:50.510 --> 02:32:57.520
property. We have Hinkins Road that was previously developed in the county. At a time, I'm not a

02:32:57.520 --> 02:33:24.410
where I don't know when Skyline was done, I believe in the 70s, it may not have even been in the city's area of impact, so we have a road section that's under the county's jurisdiction, or the highway district I should say, and they have a typical roadway section of a width, borrow ditch, etc, so that's how roads get built, it's when they get developed and they dedicate them as part of the planning process.

02:33:24.410 --> 02:33:34.760
So the only thing I would add to anybody is looking at it, you will be notified if you're within 300 feet of a preliminary plat of the exterior boundary of a preliminary plat.

02:33:34.760 --> 02:33:43.760
When you see those signs that go up saying public hearing, you can call the number, we can tell you what they're developing, what it looks like.

02:33:43.760 --> 02:33:49.270
I know when this area over here gets preliminary plated, there will be a sign on Hanken's Road

02:33:49.270 --> 02:33:56.940
to call if any zoning change, any plat that comes through for the preliminary side of it.

02:33:56.940 --> 02:34:03.390
That's the time to kind of potentially engage in some of those conversations

02:34:03.390 --> 02:34:05.390
and bring them to the planning and zoning commission for that.

02:34:05.390 --> 02:34:07.000
Thank you.

02:34:07.000 --> 02:34:10.350
That's a good question for me.

02:34:10.350 --> 02:34:18.670
I kind of got the drift that they would expect the city to rebuild Hankins Road to because

02:34:18.670 --> 02:34:23.870
of the money, extra tax money would be receiving them, but that's not in the city limits, is

02:34:23.870 --> 02:34:30.780
that even possible for us to do? I don't think so. I mean, it would be basically

02:34:30.780 --> 02:34:35.980
a hard good nature to build a road that is under the Twin Falls Highway District jurisdiction.

02:34:35.980 --> 02:34:39.980
The Twin Falls Highway District could rebuild. It could rebuild that it's under their jurisdiction,

02:34:39.980 --> 02:34:49.820
Basically from falls up to Hankins on the north side, I mean, falls up to Cheney up to that area is not in city limits

02:35:04.820 --> 02:35:08.900
Something else was mentioned that I'm just curious and I think this is probably for you Travis

02:35:09.300 --> 02:35:13.300
They talked about that one little section of trail on Eastland that isn't finished

02:35:13.300 --> 02:35:19.540
and he talked about using imminent domain, but you cannot use imminent domain for trial purposes, is that correct?

02:35:19.540 --> 02:35:34.060
Yeah, my understanding is the legislature had removed that process in the 2016 legislative session as a result of issues that were going on in the city of Pocatello, and I also believe cities in the Treasure Valley.

02:35:34.060 --> 02:35:35.770
This is making sure.

02:35:35.770 --> 02:35:39.680
Thank you, so Zalad, I forgot that.

02:35:39.680 --> 02:35:44.370
We're ready for motion.

02:35:44.370 --> 02:35:51.980
I move that we read, approve the request for PUD amendment to the preserve, PUD number

02:35:51.980 --> 02:35:57.960
261 to reflect the changes in proposed uses, project boundary completion of Canyon Nrib

02:35:57.960 --> 02:36:05.720
Trail, Dedekieke, Trailhead Park and to allow project specific roadway standards on approximately

02:36:05.720 --> 02:36:10.780
370 acres located in the south east corner of Eastland Drive north and Pole Line Road

02:36:10.780 --> 02:36:15.500
East and Jonathan do we need the six conditions?

02:36:15.500 --> 02:36:17.740
And the six conditions.

02:36:17.740 --> 02:36:20.460
Second.

02:36:20.460 --> 02:36:26.480
Motion eight, meeting seconded by here's other questions

02:36:26.480 --> 02:36:35.920
at this time.

02:36:35.920 --> 02:36:36.920
Nicky Boyd.

02:36:36.920 --> 02:36:37.680
Yes.

02:36:37.680 --> 02:36:39.040
Chris Tockington.

02:36:39.040 --> 02:36:39.880
Yes.

02:36:39.880 --> 02:36:40.880
Greg Lanting.

02:36:40.880 --> 02:36:41.380
Yes.

02:36:41.380 --> 02:36:42.520
Christopher Reed.

02:36:42.520 --> 02:36:43.020
Yes.

02:36:43.020 --> 02:36:43.880
Ruth Pears.

02:36:43.880 --> 02:36:44.640
Yes.

02:36:44.640 --> 02:36:45.680
Zann Hawkins.

02:36:45.680 --> 02:36:46.880
Yes.

02:36:46.880 --> 02:36:54.070
Motion passes six to zero.

02:36:54.070 --> 02:36:59.240
With that, you have adjournment.

02:36:59.240 --> 02:37:00.800
There's nothing else.