WEBVTT

00:03:50.510 --> 00:03:53.510
Good evening, ladies and gentlemen.

00:03:53.510 --> 00:03:58.510
Welcome back to our City Council meeting for May 23rd.

00:03:58.510 --> 00:04:08.510
We convened at four o'clock, went into executive session regarding personnel issues and are now moving back to the meeting.

00:04:08.510 --> 00:04:14.510
Our first item on the agenda for this meeting is the Pledge of Allegiance.

00:04:14.510 --> 00:04:39.090
If there's anybody here that wishes to join me, please rise.

00:04:39.090 --> 00:04:46.730
Okay, there's no proclamations today, so next on the agenda would be the consent calendar.

00:04:47.880 --> 00:04:52.630
Council wishes the consent calendar is published.

00:04:53.470 --> 00:04:53.970
Thank you.

00:04:53.830 --> 00:04:54.630
Is there a second?

00:04:55.330 --> 00:04:55.830
Thank you.

00:04:56.430 --> 00:05:03.870
Motion by Christopher Reed, seconded by Jason Brown to approve the consent calendar as written.

00:05:04.910 --> 00:05:06.270
Aaron Roek, I'll vote please.

00:05:08.010 --> 00:05:08.850
Vice Mayor Reed.

00:05:09.190 --> 00:05:09.690
Yes.

00:05:09.790 --> 00:05:10.650
Sean Maricar.

00:05:10.790 --> 00:05:11.290
Yes.

00:05:11.330 --> 00:05:12.130
Thank you, Boyd.

00:05:12.770 --> 00:05:30.790
Jason Brown? Yes. Spencer Cutler? Yes. Mayor Pierce? Yes. Motion carries six to zero. Passes six to zero. So if you were here for the annual

00:05:30.790 --> 00:05:40.430
Kermit's event, the Crazy Days event, Corona Music Festival that's shown after dark extension

00:05:40.430 --> 00:05:49.250
or the Parks and Recreation Bench for donation from Rita Johnson, they've all been approved.

00:05:49.250 --> 00:05:54.090
So the next item on the agenda is an action item to confirm the appointment of Courtney

00:05:54.090 --> 00:05:57.590
Campbell to the Planning and Zoning Commission.

00:05:57.590 --> 00:06:01.900
We have Jonathan to spend the love of our planning and zoning director.

00:06:01.900 --> 00:06:03.220
Welcome, Jonathan.

00:06:03.220 --> 00:06:06.580
Thank you, Madam Mayor, members of the Council.

00:06:06.580 --> 00:06:08.780
We recently had a member of the Planning and Zoning Commission,

00:06:08.780 --> 00:06:11.260
Tender, Exit, and Nation due to relocation.

00:06:11.260 --> 00:06:13.060
Curtis Hanson was on there for four years.

00:06:13.060 --> 00:06:15.820
That's one term in one year.

00:06:15.820 --> 00:06:18.180
We recently had published a request for volunteers

00:06:18.180 --> 00:06:20.020
on the February.

00:06:20.020 --> 00:06:24.220
Mayor Pierce and myself and planning and zoning chair, Craig Kelly,

00:06:24.220 --> 00:06:26.580
conducted interviews while there was only two positions open.

00:06:26.580 --> 00:06:31.740
Courtney was one of those applications that we had flagged for potential future if there

00:06:31.740 --> 00:06:34.060
was an opening this coming year.

00:06:34.060 --> 00:06:41.460
With that recent change, we interviewed Courtney and we found her to be an excellent person

00:06:41.460 --> 00:06:43.800
to fill that vacation.

00:06:43.800 --> 00:06:49.900
She brings some small business entrepreneurship background and her desire for civic engagement

00:06:49.900 --> 00:06:54.150
bringing that name forward.

00:06:54.150 --> 00:06:55.150
Thank you, Jonathan.

00:06:55.150 --> 00:07:00.350
Yes, Jonathan and I spent quite a bit of time with Courtney, and I found her very

00:07:00.350 --> 00:07:06.190
personable and very interested in serving our community, so I think she would be an excellent

00:07:06.190 --> 00:07:07.190
addition.

00:07:07.190 --> 00:07:11.730
I would welcome a motion.

00:07:11.730 --> 00:07:25.480
Approved the appointment of Courtney Campbell to the Planning and Zoning Commission.

00:07:25.480 --> 00:07:26.480
Thank you.

00:07:26.480 --> 00:07:27.480
A second.

00:07:27.480 --> 00:07:28.480
A second.

00:07:28.480 --> 00:07:32.960
Thank you, motion by Jean Berger, seconded by Jason Brown to approve the appointment

00:07:32.960 --> 00:07:36.720
of Courtney Campbell to the Planning and Zoning Commission.

00:07:36.720 --> 00:07:39.300
Here in Roll Call vote, please.

00:07:39.300 --> 00:07:40.300
Sean Barriker.

00:07:40.300 --> 00:07:41.300
Yes.

00:07:41.300 --> 00:07:42.300
Nicky Boyd.

00:07:42.300 --> 00:07:43.300
Yes.

00:07:43.300 --> 00:07:44.300
Jason Brown.

00:07:44.300 --> 00:07:45.300
Yes.

00:07:45.300 --> 00:07:46.300
Ben Sir Cutler.

00:07:46.300 --> 00:07:47.300
Yes.

00:07:47.300 --> 00:07:48.300
Mayor Pierce.

00:07:48.300 --> 00:07:49.300
Yes.

00:07:49.300 --> 00:07:50.300
Vice-Mare Reid.

00:07:50.300 --> 00:07:51.300
Yes.

00:07:51.300 --> 00:07:52.300
Thank you.

00:07:52.300 --> 00:07:54.670
Motion passes six to zero.

00:07:54.670 --> 00:07:57.270
Next item on the agenda is also an action item.

00:07:57.270 --> 00:08:02.910
It's a consideration of a request to approve the expenditure of 3.6 million from the Water

00:08:02.910 --> 00:08:08.910
department funds to finance the Hinkins pressure zone project. We have Josh

00:08:08.910 --> 00:08:16.900
Barrett, our public works director. Welcome Josh. Thank you, Mayor and members of City Council.

00:08:21.820 --> 00:08:29.740
So as you mentioned, I'm here to request $3.6 million which would fund the design and construction

00:08:29.740 --> 00:08:37.280
at least anticipated design and construction costs for a Hinkins pressure zone.

00:08:37.280 --> 00:08:39.960
We have needed a new pressure zone for some time.

00:08:39.960 --> 00:08:45.150
This was in a capital improvement plan for our last one that's about five or six years

00:08:45.150 --> 00:08:46.150
old.

00:08:46.150 --> 00:08:47.390
It's going to be in our plan this year.

00:08:47.390 --> 00:08:53.740
It's just one of those big long term expensive projects that we're trying to wrap up.

00:08:53.740 --> 00:08:58.540
We anticipate it being probably a full year of design to actually make sure that everything

00:08:58.540 --> 00:09:00.540
works like a plan on.

00:09:00.540 --> 00:09:05.540
I want to see there's about a half a mile to a mile of pipes in and throughout town that

00:09:05.540 --> 00:09:09.900
would have to be installed and valves to create a new pressure zone.

00:09:09.900 --> 00:09:16.200
Just a quick background, this is what our existing pressure zones look like.

00:09:16.200 --> 00:09:18.600
These lines right here are contours.

00:09:18.600 --> 00:09:23.600
And you can see the Hankins pressure zone right now goes from this contour to this contour

00:09:23.600 --> 00:09:28.320
to this contour to this contour to 150 feet of elevation between the two.

00:09:28.320 --> 00:09:32.640
And what we're trying to do is drop that, so that it's only about 70 feet.

00:09:32.640 --> 00:09:36.680
You can see there'll be a new pressure zone here, the north and the south.

00:09:36.680 --> 00:09:43.680
That will reduce operating costs on the booster station and allow us to also help some developments

00:09:43.680 --> 00:09:48.440
that are having problems because we're in some locations on the very low end of pressure

00:09:48.440 --> 00:09:53.280
and in that same zone, depending on where you're at in the zone at the very high end.

00:09:53.280 --> 00:10:01.280
And so by dividing the zone, we can we can help development out and also some lower some operating costs operating costs and get us to where we should be.

00:10:03.630 --> 00:10:10.630
Like I said, I anticipate about a year of design and hopefully we'll be ready for construction to begin in the summer of 2023 next year.

00:10:10.630 --> 00:10:22.750
The new zone will have to tie everything back so that we make sure we have the inner connectivity and the looped and redundant system so it functions like it should.

00:10:22.750 --> 00:10:27.750
But that'll all be done in the background through the design process and what's constructed.

00:10:27.750 --> 00:10:33.750
So I think that's the synopsis I'm open to answering any questions you might have.

00:10:33.750 --> 00:10:40.950
Are there any questions for Josh?

00:10:40.950 --> 00:10:45.950
Can you talk to me about where the $3.6 million is coming from?

00:10:45.950 --> 00:10:48.950
Absolutely.

00:10:48.950 --> 00:10:55.650
the exactly where it's going to come from the water fund. Last year in the budget, the

00:10:55.650 --> 00:11:01.440
city council authorized money that was paid off early for the arsenic bond. Instead of

00:11:01.440 --> 00:11:06.700
going back, it was intended to be set aside and put into the water department fund to

00:11:06.700 --> 00:11:10.220
be used for these types of big projects. And this is one of the first projects. I think

00:11:10.220 --> 00:11:15.300
this is the first project we're kind of using that money, which I want to say is 2.8, the

00:11:15.300 --> 00:11:21.340
$3 million annually and as we have funds, I believe that the price tag will increase and

00:11:21.340 --> 00:11:25.660
the money that's coming into that water fund that we didn't have previously so that's

00:11:25.660 --> 00:11:30.090
where this way is anticipated to come from.

00:11:30.090 --> 00:11:32.690
Thank you.

00:11:32.690 --> 00:11:34.900
That was?

00:11:34.900 --> 00:11:35.900
Yeah.

00:11:35.900 --> 00:11:37.420
Josh was absolutely right.

00:11:37.420 --> 00:11:47.520
It's about $3.3 million annually that we received through that capital fund that was

00:11:47.520 --> 00:11:51.850
created last year by the city council.

00:11:51.850 --> 00:11:53.490
Any other questions for Josh?

00:11:53.490 --> 00:11:56.250
Thank you.

00:11:56.250 --> 00:12:10.260
As for the expenditure of 3.6 million from water department funds to finance the Hankins

00:12:10.260 --> 00:12:16.820
Preserve Pressure Zone Project and authorized Public Works Director to enter into a professional

00:12:16.820 --> 00:12:21.820
services contract to design the project and produce instruction documents.

00:12:21.820 --> 00:12:22.820
Thank you.

00:12:22.820 --> 00:12:25.830
Do I have a second?

00:12:25.830 --> 00:12:26.830
Second.

00:12:26.830 --> 00:12:34.120
Thank you. Motion by Nicky Boyd, seconded by Christopher Reed to approve the request

00:12:34.120 --> 00:12:39.720
for the expenditure of $3.6 million from the Water Department funds.

00:12:39.720 --> 00:12:42.780
Aaron Roll, call vote please.

00:12:42.780 --> 00:12:43.780
Nicky Boyd?

00:12:43.780 --> 00:12:44.380
Yes.

00:12:44.380 --> 00:12:45.380
Jason Brown?

00:12:45.380 --> 00:12:45.880
Yes.

00:12:45.880 --> 00:12:47.080
Spencer Cutler?

00:12:47.080 --> 00:12:47.580
Yes.

00:12:47.580 --> 00:12:48.480
Mayor Pierce?

00:12:48.480 --> 00:12:48.980
Yes.

00:12:48.980 --> 00:12:49.980
Vice-Mary?

00:12:49.980 --> 00:12:50.480
Yes.

00:12:50.480 --> 00:12:51.380
Sean Merricker?

00:12:51.380 --> 00:12:52.180
Yes.

00:12:52.180 --> 00:12:53.280
Thank you.

00:12:53.280 --> 00:12:55.380
Motion, care.

00:12:55.380 --> 00:13:02.240
Next item on the agenda is an action item.

00:13:02.240 --> 00:13:08.740
It's a discussion in action on pursuing the creation of a historic district for the

00:13:08.740 --> 00:13:13.240
Arab proposed by the Friends of the Avenue neighborhood interest group.

00:13:13.240 --> 00:13:16.240
We have Jonathan spend love planning and zoning director.

00:13:16.240 --> 00:13:18.240
Again, welcome Jonathan.

00:13:18.240 --> 00:13:23.220
Members of the council, I'm going to get this presentation.

00:13:23.220 --> 00:13:32.670
I'm just, all right.

00:13:32.670 --> 00:13:34.670
So the background, I've got a little bit of background here.

00:13:34.670 --> 00:13:37.850
here starting I was going to run through this presentation I know that you've got

00:13:37.850 --> 00:13:44.210
the PDF version of this included with the agenda I've got some motions to kind of

00:13:44.210 --> 00:13:47.250
talk about points before I go to the other one so I'll just kind of be going

00:13:47.250 --> 00:13:51.090
through some commentary on some of these points as I go through it history on this

00:13:51.090 --> 00:13:56.970
is Council was approached by the Friends of the Avenue in March for the city to

00:13:56.970 --> 00:14:03.290
create a residential historic district during that meeting March April the

00:14:03.290 --> 00:14:07.630
Council directed staff to bring back a budget kind of a plan going forward on what

00:14:07.630 --> 00:14:13.330
it would take to create a residential historic district. Since that time the

00:14:13.330 --> 00:14:19.450
city has gone through a really rough draft scope of work to see what it would

00:14:19.450 --> 00:14:25.610
take to create that district for the area proposed and so we're reporting back to

00:14:25.610 --> 00:14:31.330
you on what we found. What we've done is done some research of what we have in our

00:14:31.330 --> 00:14:36.490
possession. We have an original town site nomination that was done or paid for by

00:14:36.490 --> 00:14:41.750
the Windfills County Historic Society for this residential district to

00:14:41.750 --> 00:14:46.490
compromise about 900 properties throughout downtown. There's also design

00:14:46.490 --> 00:14:50.810
guidelines for that area that were also funded by that group and we have that in

00:14:50.810 --> 00:14:58.550
our possession. We've also gone through some of our maps and lists of properties

00:14:58.550 --> 00:15:02.870
and the pictures that were included in that nomination. We don't have possession

00:15:02.870 --> 00:15:07.910
those pictures, the originals, them. They are with a private nonprofit preservation

00:15:07.910 --> 00:15:14.240
to it falls that was cosponsored with that nomination of the original area.

00:15:14.240 --> 00:15:18.800
We have those written guidelines, again, not the original pictures. We have the guidelines that were

00:15:18.800 --> 00:15:24.530
proposed as we have the copy of those items. We then looked into what it takes from a state

00:15:24.530 --> 00:15:31.250
statute to establish an historic district. You're vested with the power from the state,

00:15:31.250 --> 00:15:35.250
Title 67, Chapter 46, to create local districts.

00:15:35.250 --> 00:15:41.630
I'm going to go through that, those sections briefly.

00:15:41.630 --> 00:15:48.980
67, 46, 07, historic districts may be established after following some criteria.

00:15:48.980 --> 00:15:53.300
An investigation or survey of the area has to be conducted.

00:15:53.300 --> 00:15:57.300
The report to the local planning board for their consideration recommendation.

00:15:57.300 --> 00:16:02.300
Historic Commission then holds a public hearing after due notice to all the properties that are within the proposed area.

00:16:02.300 --> 00:16:07.500
area and the commission submits a final report and a draft of our proposed ordinance to City Council.

00:16:08.510 --> 00:16:14.590
We are currently kind of in a, which is what does it take from City-sponsored

00:16:15.950 --> 00:16:21.470
path to get to creating a district. We have to have a survey of the area on the area that the

00:16:21.470 --> 00:16:26.670
Friends of the Avenue's are proposing is smaller than the original 900. It encompasses 300 properties

00:16:27.550 --> 00:16:32.350
so it's a little bit of different area in terms of it's not the original proposal it's a separate thing.

00:16:33.070 --> 00:16:40.070
So that investigation that we proposed to the Planning and Zoning Board would need to be consolidated down to just the areas they are proposing.

00:16:40.070 --> 00:16:49.960
The original documents, although have a lot of information, may not be able to be used specifically because the proposal needs to be to what the area we're talking about.

00:16:49.960 --> 00:16:54.960
We have not gone to any reporting the findings to the Planning Board. We're still stuck on that A-Park.

00:16:54.960 --> 00:17:02.960
These other items would have to be done in order for any regulatory authority is vested.

00:17:02.960 --> 00:17:07.960
So you have to get all the way down to a draft proposed ordinance for the council to take an action on.

00:17:07.960 --> 00:17:09.960
That's not what we're talking about tonight.

00:17:09.960 --> 00:17:14.960
Tonight we're talking about directing staff to go down the path.

00:17:14.960 --> 00:17:18.280
Then we have that ordinance that gets enacted.

00:17:18.280 --> 00:17:24.750
That then creates 4608 certificate of appropriateness.

00:17:24.750 --> 00:17:27.750
I call it a certificate of appropriateness program.

00:17:27.750 --> 00:17:31.750
After the designation of a district, this is what comes into play.

00:17:31.750 --> 00:17:36.910
If there's no exterior changes to any building, including walls, fences, live fixtures, steps,

00:17:36.910 --> 00:17:42.390
of pavement, or other pertinent features are permitted until after approval of certificate

00:17:42.390 --> 00:17:47.600
of appropriateness, COA, by the Historic Preservation Commission.

00:17:47.600 --> 00:17:52.400
If you enact a district 67-46-08, then is a shall.

00:17:52.400 --> 00:17:58.440
And we shall run that program in order to implement the district requirements.

00:17:58.440 --> 00:18:02.150
And there are any questions to this point?

00:18:02.150 --> 00:18:05.010
Does it look like it?

00:18:05.010 --> 00:18:06.010
Oh yeah.

00:18:06.010 --> 00:18:14.520
So just to clarify, so any of those exterior changes, that is a you must regulate those

00:18:14.520 --> 00:18:15.520
not you may.

00:18:15.520 --> 00:18:19.520
So you can't, you couldn't set something up that says we only are going to regulate it

00:18:19.520 --> 00:18:24.520
if the exterior wood is going to be changed in the house.

00:18:24.520 --> 00:18:27.520
Yeah, so there's you shall regulate them.

00:18:27.520 --> 00:18:31.120
the degree by which you regulate can is up for discussion.

00:18:31.120 --> 00:18:34.240
What isn't up is you shall look at these items.

00:18:34.240 --> 00:18:37.520
The guidelines can then talk about the degree at which you

00:18:37.520 --> 00:18:41.800
want to regulate the wall's fences, life fixtures.

00:18:41.800 --> 00:18:44.240
And there is an exemption for maintenance.

00:18:44.240 --> 00:18:47.600
If it's the same for same, what we do know

00:18:47.600 --> 00:18:51.940
is there has to be a program that people get permission

00:18:51.940 --> 00:18:53.980
to change or to apply for.

00:18:53.980 --> 00:18:58.860
So you create some level of guidelines,

00:18:58.860 --> 00:19:00.540
and then those must be regulated.

00:19:00.540 --> 00:19:03.020
It can't be, I'm only gonna deal with it

00:19:03.020 --> 00:19:06.910
if it's this one thing that's happening at the house

00:19:06.910 --> 00:19:10.080
because the whole point of historic preservation

00:19:10.080 --> 00:19:11.840
to preserve the historic nature, right?

00:19:11.840 --> 00:19:16.050
So you couldn't say, we're not gonna regulate paint color.

00:19:16.050 --> 00:19:19.410
No, in terms of you have to look at it,

00:19:19.410 --> 00:19:22.770
whether you, what's in the guidelines is whether or not.

00:19:22.770 --> 00:19:24.090
So the guideline might say,

00:19:24.090 --> 00:19:28.090
It can be whatever code you want, but you still have to apply it.

00:19:28.090 --> 00:19:34.510
Yeah, we've gone through that with the City Attorney in terms of the program has to be run.

00:19:34.510 --> 00:19:40.510
You have to look at certain things that would be applied for, but the degree by which you regulated is in the guidelines.

00:19:40.510 --> 00:19:44.510
So it could be landscaping is fine, but you still need to be in the other process.

00:19:44.510 --> 00:19:49.280
Yes, there is a process to go through. That's what we've come to.

00:19:49.280 --> 00:19:56.290
I'm not where this gets to is whether a building permit is required or not, the state statute

00:19:56.290 --> 00:20:01.190
talks about what shall be reviewed, the degree by which sort of view takes place is what is

00:20:01.190 --> 00:20:06.320
up for discussion during the guideline creation.

00:20:06.320 --> 00:20:08.020
If I can't jump in real quick.

00:20:08.020 --> 00:20:09.020
Sure.

00:20:09.020 --> 00:20:14.130
So who's actually so who's doing the evaluation?

00:20:14.130 --> 00:20:15.630
It's a good question.

00:20:15.630 --> 00:20:20.330
The state statute talks about the Historic Preservation Commission is the one that shall

00:20:20.330 --> 00:20:25.980
issue the certificate of appropriateness and discussions with the city attorney's office.

00:20:25.980 --> 00:20:32.500
There's perhaps some level of if the commission with the guideline says these things are okay,

00:20:32.500 --> 00:20:36.540
they could be kind of an automatic qualifier say it's landscaping.

00:20:36.540 --> 00:20:38.100
We don't want to look at shrubs.

00:20:38.100 --> 00:20:40.140
So that's in the guidelines.

00:20:40.140 --> 00:20:44.700
People still wouldn't need to apply and then it could be issued automatically or issued

00:20:44.700 --> 00:20:46.100
through a consent item.

00:20:46.100 --> 00:20:51.660
But the authority comes through that historic preservation commission and the council.

00:20:51.660 --> 00:20:54.420
So city staff, are they interjecting?

00:20:54.420 --> 00:21:00.180
Are they looking at what we did five years ago versus now?

00:21:00.180 --> 00:21:04.820
And if the standards change or we're interpreting different, I mean, how much effort really

00:21:04.820 --> 00:21:07.540
from your staff is going into this?

00:21:07.540 --> 00:21:12.740
And through this, we, in the end, we believe that this creates a body, a person that needs

00:21:12.740 --> 00:21:13.740
to run the program.

00:21:13.740 --> 00:21:22.540
I'm going to say, I am my department.

00:21:22.540 --> 00:21:32.170
So we went through a rough draft scope, essentially looking at comments from the council that

00:21:32.170 --> 00:21:35.970
night that we have that original investigation has done in 2000.

00:21:35.970 --> 00:21:39.010
It's now 20 years old.

00:21:39.010 --> 00:21:43.210
When you go to create the certificate of programs program, we believe we would need updated

00:21:43.210 --> 00:21:47.810
photos of the property so that we can know what's there currently before the regulation

00:21:47.810 --> 00:21:53.170
is in place versus what comes after.

00:21:53.170 --> 00:21:56.770
We also believe that some of the guidelines need to be updated.

00:21:56.770 --> 00:22:00.930
I believe we have a lot in the documents we currently have.

00:22:00.930 --> 00:22:05.090
There would need to be some things that are updated or discussed in terms of what are we

00:22:05.090 --> 00:22:06.290
not going to regulate.

00:22:06.290 --> 00:22:10.130
So landscaping is one that the commission and the council says we're not going to look

00:22:10.130 --> 00:22:11.130
at.

00:22:11.130 --> 00:22:15.330
It needs to have that kind of language within the guidelines to say we're, this is how we're

00:22:15.330 --> 00:22:17.270
going to treat that.

00:22:17.270 --> 00:22:21.070
All of the items in the statute need to be addressed in the guidelines is what we are

00:22:21.070 --> 00:22:24.380
proposing.

00:22:24.380 --> 00:22:30.980
This rough dress scope contained three public meetings or open houses to have this discussion with the property owners within that district.

00:22:30.980 --> 00:22:33.780
They're 300 property owners or 300 properties.

00:22:33.780 --> 00:22:38.820
I believe there's around 40 business properties and we'll have that discussion up in a minute.

00:22:38.820 --> 00:22:40.820
They're commercial type properties.

00:22:40.820 --> 00:22:44.820
So there'll be some discussion in terms of that coming up.

00:22:44.820 --> 00:22:52.820
This rough dress scope is what we created to then send out to consultants to help us with the work.

00:22:52.820 --> 00:22:58.620
in terms of a time of creating this investigation and proposal to get to the ordinance part,

00:22:58.620 --> 00:23:08.340
that we created this draft draft scope and we sent it to consultants that are listed

00:23:08.340 --> 00:23:13.440
on a state historic preservation office and they have their website as a list of consultants

00:23:13.440 --> 00:23:14.440
that are qualified.

00:23:14.440 --> 00:23:20.240
And we had to respond to consultants give a range from $48,000 to $25,000 to do the work.

00:23:20.240 --> 00:23:22.440
Average response was $65,000.

00:23:22.440 --> 00:23:28.090
such a rough draft a lot of them are most of them got back to us saying this is

00:23:28.090 --> 00:23:32.730
kind of open-ended we're not really sure if you know our costs are too high

00:23:32.730 --> 00:23:35.970
because we're unsure of how long this will take what we're really looking at

00:23:35.970 --> 00:23:39.970
we do think that those numbers could come down using the original information

00:23:39.970 --> 00:23:46.240
we think that it comes down somewhere between that $20,000 and $40,000 range from

00:23:46.240 --> 00:23:52.300
those costs the 125,000 was from somebody out of state not here they're

00:23:52.300 --> 00:23:54.820
they're flying in, it's multiple days.

00:23:54.820 --> 00:23:56.940
They just said, here's the number.

00:23:56.940 --> 00:24:00.620
Others were somebody in Idaho Falls, a sole proprietor,

00:24:00.620 --> 00:24:02.860
they're the only person working in the company,

00:24:02.860 --> 00:24:04.860
so they have a lot more leeway with their time.

00:24:04.860 --> 00:24:08.300
So the rest of them are all in the middle.

00:24:08.300 --> 00:24:09.780
We do think that some of the savings

00:24:09.780 --> 00:24:12.660
come from the original survey and investigation

00:24:12.660 --> 00:24:14.180
and the original sign guidelines,

00:24:14.180 --> 00:24:19.110
and we're just updating and modifying those.

00:24:19.110 --> 00:24:20.830
Any questions up to this point,

00:24:20.830 --> 00:24:22.950
I'm stopping every couple of slides.

00:24:22.950 --> 00:24:34.960
So, this would be the program and how it would be created, be created with that statute in

00:24:34.960 --> 00:24:37.920
the process to review the certificates of appropriateness, we believe it's a one-time

00:24:37.920 --> 00:24:45.740
cost, but we're in the 48, 2025, maybe it's down to 28 to 60 or 40.

00:24:45.740 --> 00:24:49.340
We do believe we have the need for a new staff member.

00:24:49.340 --> 00:24:54.140
We have 135 properties in three districts, all of those are commercial properties, warehouse,

00:24:54.140 --> 00:25:01.580
downtown in the park district. The proposal has around 300 properties. We have about 25%

00:25:01.580 --> 00:25:08.940
of somebody's time devoted to those 135 properties, so I'm sure math in terms of tripling it, we

00:25:08.940 --> 00:25:14.140
would triple the workload somewhere too in a full time. The ongoing cost would be $80,000

00:25:14.140 --> 00:25:20.580
a year. That's a fully burned cost of a planner on the low end, so it's around that amount

00:25:20.580 --> 00:25:24.640
year over year to supply that program.

00:25:24.640 --> 00:25:26.560
We know there's savings in there.

00:25:26.560 --> 00:25:29.000
Let's come talking about the savings.

00:25:29.000 --> 00:25:33.000
There's also another item to bring up in this historic,

00:25:33.000 --> 00:25:34.360
a residential historic program.

00:25:34.360 --> 00:25:36.880
There are three other cities in Idaho

00:25:36.880 --> 00:25:41.080
that run residential historic programs,

00:25:41.080 --> 00:25:43.960
including that certificate of appropriateness.

00:25:43.960 --> 00:25:46.080
Boise, obviously, they have a number.

00:25:46.080 --> 00:25:50.480
Caldwell has one district and Wallace has one district.

00:25:50.480 --> 00:25:57.060
Called One, Boise both have a dedicated person doing those programs that I spoke with.

00:25:57.060 --> 00:26:01.060
Other cities, including Pocatello, I don't know, falls.

00:26:01.060 --> 00:26:03.060
I'm reading others in the Treasure Valley.

00:26:03.060 --> 00:26:07.060
They don't have residential districts at a local level.

00:26:07.060 --> 00:26:12.060
They do have residential districts on the national level, just like we do.

00:26:12.060 --> 00:26:20.060
When you put it on the national registry, what you're doing is giving a protection from federal decisions and federal dollars.

00:26:20.060 --> 00:26:27.060
The federal government then can't use the money or do things in that district without following a set of guidelines or a process.

00:26:27.060 --> 00:26:34.310
That's what most of the districts might know are under as that federally recognized program.

00:26:34.310 --> 00:26:39.310
When you do a local district and that's not your regulation back down to the local level.

00:26:39.310 --> 00:26:47.310
To the city level, the state does not run historic district programs like this with regulatory bodies or arms.

00:26:47.310 --> 00:26:54.480
They're not responsible for running those. It's a local issue. Any questions on that question?

00:26:54.480 --> 00:26:55.480
Yes.

00:26:55.480 --> 00:27:02.480
So from that federal standpoint of designation, Jonathan, are there standards similar to what

00:27:02.480 --> 00:27:06.560
has been presented before that somebody's looking over that list saying here's what

00:27:06.560 --> 00:27:09.360
you can or cannot do associated with that?

00:27:09.360 --> 00:27:15.320
Yeah, so when you go to use federal dollars that's in a local or in a district, you have

00:27:15.320 --> 00:27:20.280
to go through certain steps that ends up being thrown on some words on there. I'm hoping to get them

00:27:20.280 --> 00:27:27.560
right. Section 106 review is one that if you Google that, you have to go through a certain set of reviews

00:27:27.560 --> 00:27:35.000
and processes. One is contacting multiple agencies like SHBO when the federal government or somebody

00:27:35.000 --> 00:27:40.680
using federal money wants to do something in the area. They contact SHBO to say, hey, this isn't a

00:27:40.680 --> 00:27:46.840
the district, what are the mitigating things we need to do to maintain this character that

00:27:46.840 --> 00:27:51.920
this district has been created under the federal guideline? So that's one thing that they have

00:27:51.920 --> 00:27:57.840
to do when they use federal money. When it's a local-use money, so we go and do a road project

00:27:57.840 --> 00:28:04.460
with local money, the federal thing doesn't come into play, we're using our dollars. But

00:28:04.460 --> 00:28:11.220
if a private investor is using federal dollars for it, or if they have to file for a stormwater

00:28:11.220 --> 00:28:16.180
permit or something then the federal guidelines come into play and there's a

00:28:16.180 --> 00:28:19.430
host of things they have to do.

00:28:19.430 --> 00:28:33.300
Hi, I'm Zach, Jonathan. I guess plain and simple, why they want the federal government?

00:28:33.300 --> 00:28:41.610
Is it because a big project could come down the road and they're going to need that money?

00:28:41.610 --> 00:28:43.510
What is it?

00:28:43.510 --> 00:28:48.310
No, so now, since it's on the national registry, it's currently on it right now.

00:28:48.310 --> 00:28:54.310
It has been submitted and approved currently. What's being asked tonight is the local district level,

00:28:54.310 --> 00:28:59.510
so that the regulation comes to a local level to this body as the final decision makers.

00:28:59.510 --> 00:29:00.790
They still have to do both, right?

00:29:00.790 --> 00:29:03.350
If there's a federal project, you're still doing the federal stuff.

00:29:03.350 --> 00:29:13.860
There's another project you'd have a local regulatory arm.

00:29:13.860 --> 00:29:16.900
So this is, we believe there's around 40 properties.

00:29:16.900 --> 00:29:18.100
I did not count everyone.

00:29:18.100 --> 00:29:19.140
I kind of did.

00:29:19.140 --> 00:29:22.660
Just went through the Google Street View to kind of count the properties.

00:29:22.660 --> 00:29:24.420
They're non-residential.

00:29:24.420 --> 00:29:26.100
They're commercial businesses.

00:29:26.100 --> 00:29:28.500
The question that I would have, um,

00:29:28.500 --> 00:29:33.500
How do the counselors should those, should there be different design guidelines for those businesses versus the homes?

00:29:33.500 --> 00:29:38.500
The examples, those are the businesses that are along, just shown really.

00:29:38.500 --> 00:29:43.500
Farmers bank, burn lemon grills, starly Levits, over at Gaddness of CS law firm.

00:29:43.500 --> 00:29:45.500
Those are all on just shown.

00:29:45.500 --> 00:29:52.020
The distinctly commercial properties, not homes, different types of businesses.

00:29:52.020 --> 00:29:58.020
If we go down this path, should there be different design guidelines for commercial properties versus residential?

00:29:58.020 --> 00:30:06.300
That's something the council will need to have a discussion on, or at least give some direction if we go down this pathway.

00:30:06.300 --> 00:30:14.300
So my question would be what about the commercial businesses that are in homes, which make them now non-compliant?

00:30:14.300 --> 00:30:23.160
That's kind of why we need a new, I believe we need a new survey slash investigation is to know what's in each spot.

00:30:23.160 --> 00:30:27.920
Now, get to a little bit of state code that also says that if there's a change of use

00:30:27.920 --> 00:30:31.960
of property, you have to go to the Historic Preservation Commission to get that approved

00:30:31.960 --> 00:30:36.040
as well prior to issuing any type of approval.

00:30:36.040 --> 00:30:43.580
So if you change from a home to just a home officer, like a CPA or property management firm,

00:30:43.580 --> 00:30:48.100
keeping the home the way it is, that business would need to go to the Historic Preservation

00:30:48.100 --> 00:30:51.860
Commission to get approval prior to opening that business.

00:30:51.860 --> 00:30:56.700
So does that mean that some of the businesses, like along Shoshone, that are homes, have

00:30:56.700 --> 00:31:01.820
gone through some process prior because it's zoned residential or no?

00:31:01.820 --> 00:31:04.260
No, they haven't, because this isn't set up.

00:31:04.260 --> 00:31:08.540
No, but did they have to do anything back in the day?

00:31:08.540 --> 00:31:12.540
No, normally if the zoning is correct on the property, which it is, it has a professional

00:31:12.540 --> 00:31:14.540
office overlay on Shoshone.

00:31:14.540 --> 00:31:15.540
Okay.

00:31:15.540 --> 00:31:16.540
Okay.

00:31:16.540 --> 00:31:19.300
I would get either special use permit or they get a building permit to modify the home to

00:31:19.300 --> 00:31:21.620
to have ADA compliance and stuff.

00:31:21.620 --> 00:31:22.620
Thank you.

00:31:22.620 --> 00:31:23.620
Okay.

00:31:23.620 --> 00:31:26.950
Go ahead.

00:31:26.950 --> 00:31:31.030
Another piece of information that I wanted to inform you about is historic districts versus

00:31:31.030 --> 00:31:33.380
historic properties.

00:31:33.380 --> 00:31:36.580
There's another state code in 67, 4614.

00:31:36.580 --> 00:31:39.980
It's distinctly different from historic districts.

00:31:39.980 --> 00:31:44.420
It allows for the preservation of historic properties through an ordinance passed by

00:31:44.420 --> 00:31:45.420
council.

00:31:45.420 --> 00:31:49.540
And again, you have an investigation saying this is a property that's historic, but in

00:31:49.540 --> 00:31:55.540
nature of these things. You hold a public hearing, get written notice of the property owners and

00:31:56.500 --> 00:32:03.940
upon passage of the ordinance they're basically create a pseudo demolition ordinance that requires

00:32:03.940 --> 00:32:10.340
property owners to wait 180 days before they demolish or materially change the building.

00:32:11.140 --> 00:32:18.100
There's exemptions to that. This is different from a district you would then create. It does not

00:32:18.100 --> 00:32:24.820
create in itself a certificate of appropriateness program. It creates my ordinance. This 180 day

00:32:24.820 --> 00:32:29.140
waiting period that people need to then notify the planning and zoning planning commission. The

00:32:29.140 --> 00:32:36.980
historic preservation commission of what they're doing, they wait 180 days for discussion, deliberation

00:32:36.980 --> 00:32:43.780
between those bodies to see if they can maintain or save the home. At that point there's a decision

00:32:43.780 --> 00:32:48.260
process that can happen to they can change the home but it's different from a district.

00:32:48.260 --> 00:32:50.260
in state statute.

00:32:50.260 --> 00:32:57.290
Would that include painting light fixtures or so that?

00:32:57.290 --> 00:32:59.290
It can.

00:32:59.290 --> 00:33:05.290
This one has really just one section or a couple sections about what it is and how to do it.

00:33:05.290 --> 00:33:09.290
It does not inherently create that certificate of appropriate program,

00:33:09.290 --> 00:33:13.290
but it does talk about remodel, relocation, or change in use of the property.

00:33:13.290 --> 00:33:22.010
has that one hundred and eighty-eight period so it it does remove maintenance

00:33:22.010 --> 00:33:27.190
repairs so if you're painting the same color that kind of thing you don't have

00:33:27.190 --> 00:33:31.350
to get approval for that and then it does have an exemption for public safety and

00:33:31.350 --> 00:33:37.020
unsafe building type of things it's it's unique and that these two things are

00:33:37.020 --> 00:33:40.740
very separate and state statute like they're meant to be two different things

00:33:40.740 --> 00:33:46.380
or two different avenues. It's just another option that could be pursued.

00:33:46.380 --> 00:33:55.110
But those typically be requested by the property owner or imposed by the council.

00:33:55.110 --> 00:34:02.110
It allows for both. There is one exception that you can't impose it on a public agency or the state of Idaho.

00:34:02.110 --> 00:34:11.110
Meaning, had Kundeza as a member of the public go and say I want to impose this on the property that the state of Idaho owns.

00:34:11.110 --> 00:34:17.630
There's other exemptions in state statute about imposing it on other political subdivisions

00:34:17.630 --> 00:34:22.150
of the state, meaning you can't require it of the county to have a property they own

00:34:22.150 --> 00:34:25.910
be in it if the county doesn't want to do it.

00:34:25.910 --> 00:34:31.910
That's why this allows for this public hearing after written notice to property owners and

00:34:31.910 --> 00:34:39.290
occupants, so that they could oppose this section also.

00:34:39.290 --> 00:34:46.900
This process also gives very specific instruction to give the historic property designation to

00:34:46.900 --> 00:34:55.070
the county assessor so that they can bring that into their assessment of the property

00:34:55.070 --> 00:34:56.650
value.

00:34:56.650 --> 00:35:02.490
Good or bad, I don't know, but it does make it a requirement for the commission to give

00:35:02.490 --> 00:35:04.770
that to the assessor so they can take that into account.

00:35:04.770 --> 00:35:10.860
The districts doesn't have that requirement.

00:35:10.860 --> 00:35:14.340
This is, it's a public hearing, just a disorder.

00:35:14.340 --> 00:35:17.640
Gotcha.

00:35:17.640 --> 00:35:18.640
I keep asking.

00:35:18.640 --> 00:35:28.600
So this particular, this 67, 46, 14, that would really be a property owner's decision

00:35:28.600 --> 00:35:34.960
if they were to make that choice or does it go, does it take it outside of the district

00:35:34.960 --> 00:35:42.160
map and let the property owners to say, hey, I believe my house fits this requirement in

00:35:42.160 --> 00:35:47.200
property owner can make that decision themselves. That is certainly an avenue that the property

00:35:47.200 --> 00:35:52.160
owner can say I want my house designated or my property designated. It allows for others to propose

00:35:52.160 --> 00:35:59.020
that a historic property as well within the statute but it does not require a district map. It just

00:35:59.020 --> 00:36:06.140
is an ordinance that counsel does when the public hearing it does not have to look at the investigation

00:36:06.140 --> 00:36:11.140
If it goes to HPC first, I'd have to look at that code section again.

00:36:11.140 --> 00:36:16.100
There's no guidelines associated with it.

00:36:16.100 --> 00:36:18.100
It just ends up being your sort of property.

00:36:18.100 --> 00:36:23.100
If you change it, alter it, or model it, go to HPC, and then you're good to go.

00:36:23.100 --> 00:36:27.100
I mean, go through a process by which to do it, wait 180 days.

00:36:27.100 --> 00:36:34.550
I believe it can also be removed just like the district can through an ordinance of the council as well.

00:36:34.550 --> 00:36:41.940
These are not, then still never to change ever again, like the national ones are, um, these are local decisions.

00:36:41.940 --> 00:36:49.940
Oh, even this process would seemingly require some level of guidance, because otherwise it's just arbitrary.

00:36:49.940 --> 00:36:54.940
Even if I say my house is historic, hey city council passed an ordinance that makes my house historic.

00:36:54.940 --> 00:37:03.830
Even with a waiting period someone needs to, yes, my change that I want to make, so there needs to be a guy like this.

00:37:03.830 --> 00:37:11.830
Yes, I'm just arbitrary, and so what I would see this doing is you could be selected in the properties that you choose.

00:37:11.830 --> 00:37:19.830
Maybe it's not every home that happens to be in this triangle, because, you know, maybe these four arms, great, personally.

00:37:19.830 --> 00:37:24.570
So you could be selected, but you would still need guidelines.

00:37:24.570 --> 00:37:29.530
Someone still needs to see the presence.

00:37:29.530 --> 00:37:34.530
The Commission's resources still has a meeting to decide whether to approve or not approve.

00:37:34.530 --> 00:37:41.540
We had other findings, this was the change of view section.

00:37:41.540 --> 00:37:48.460
We'll leave this one as verbatim, since I did put paraphrased.

00:37:48.460 --> 00:37:59.260
So this is the same language, but then the district shall be permitted, and nothing's like no change shall be permitted until after submitted approved by the commission.

00:37:59.260 --> 00:38:08.610
We have not been doing this in terms of, I didn't know about it, and read into it for the three current districts.

00:38:08.610 --> 00:38:15.850
So, that's something we will be doing as a staff level is including or seeking out when

00:38:15.850 --> 00:38:18.090
there's changes of uses on properties.

00:38:18.090 --> 00:38:22.450
There's a couple of examples.

00:38:22.450 --> 00:38:27.780
We just know that it's going to increase some of the examples, lately, recently, what have

00:38:27.780 --> 00:38:32.060
been the magic value bruising that's inside of a building that's a change of use from a

00:38:32.060 --> 00:38:35.460
retail type to a restaurant type that's a change of use of the property when you've

00:38:35.460 --> 00:38:38.620
gone to the HPC to approve that use.

00:38:38.620 --> 00:38:40.300
Street trees when they're removed

00:38:40.300 --> 00:38:42.060
are part of the landscaping,

00:38:42.060 --> 00:38:44.440
and we've been doing that.

00:38:44.440 --> 00:38:47.440
Other public ones are the rose bushes at the core house.

00:38:47.440 --> 00:38:48.760
They're part of the landscaping

00:38:48.760 --> 00:38:51.040
at the historic property.

00:38:51.040 --> 00:38:54.360
I've gone to the HPC for approval.

00:38:54.360 --> 00:38:56.520
Those are just some things that we've found

00:38:56.520 --> 00:38:59.600
that we have not been doing by virtue of not knowing

00:38:59.600 --> 00:39:03.260
or not being trained or whatever.

00:39:03.260 --> 00:39:06.380
Oh, now I'm not reading this section earlier.

00:39:06.380 --> 00:39:10.560
Now I have read it about 15 times, so those are some other

00:39:10.560 --> 00:39:15.170
findings that we have after researching the state statute.

00:39:15.170 --> 00:39:17.250
Any questions on these three items?

00:39:17.250 --> 00:39:21.190
Although I know it's going to increase, the 25% might go to 30.

00:39:21.190 --> 00:39:22.850
I don't know.

00:39:22.850 --> 00:39:25.490
We're going to try and just hook in or bring in the change

00:39:25.490 --> 00:39:28.730
of use whenever we have other certificates of appropriateness.

00:39:28.730 --> 00:39:31.730
Oftentimes, we have somebody that wants to change a sign

00:39:31.730 --> 00:39:35.130
from one thing to another that can just include the change

00:39:35.130 --> 00:39:41.050
of you is going to the commission, so I don't think it's going to have a ton of new certificates

00:39:41.050 --> 00:39:45.650
of appropriateness for the current districts, but there will be some that don't do that.

00:39:45.650 --> 00:39:52.320
They don't need a sign and they're just changing the use of the property.

00:39:52.320 --> 00:39:53.320
That's it.

00:39:53.320 --> 00:39:55.280
So I'm just verifying.

00:39:55.280 --> 00:40:00.520
So if there's things that we don't, when I say we collectively, the city, you know,

00:40:00.520 --> 00:40:07.520
any stakeholders, things that we don't want to regulate, such as pain color or landscaping,

00:40:07.520 --> 00:40:14.640
according to state statute, if we are a district, you still have to apply for the certificate

00:40:14.640 --> 00:40:19.800
of appropriateness. It could basically be an automatic yes, but the property owner has

00:40:19.800 --> 00:40:22.320
to go through that formality of doing it.

00:40:22.320 --> 00:40:27.000
As we've discussed with our legal counsel, that is how we read the statute. This is a

00:40:27.000 --> 00:40:36.280
shall review and then the level of regulation can then be different, you know, differing

00:40:36.280 --> 00:40:42.200
in color or landscaping, but you shall review it, HBC shall review it.

00:40:42.200 --> 00:40:45.640
Okay, and then another question.

00:40:45.640 --> 00:40:51.960
If we get to the point where we're ready to adopt an ordinance creating a district, if

00:40:51.960 --> 00:40:56.280
there's a current homeowner that says, you know, I bought my property and this was not

00:40:56.280 --> 00:41:01.160
district when I bought my property and I don't want to be a part of the district, do they,

00:41:01.160 --> 00:41:04.520
is there an avenue for them to opt out of that?

00:41:04.520 --> 00:41:11.290
That's a good question I think that would be, have they purchased, yeah I mean that's

00:41:11.290 --> 00:41:16.010
where you have a public hearing in the ordinance in terms of opting out, you would then have

00:41:16.010 --> 00:41:21.690
to craft that ordinance to exclude certain properties. If you so wish as a council that's

00:41:21.690 --> 00:41:26.610
when the final decision happens and I have a decision tree that I came up with today,

00:41:26.610 --> 00:41:33.570
Can I show you the ultimate decision on whether to implement this and have it be regulated is with an ordinance at the end

00:41:34.130 --> 00:41:37.890
There's a lot to get to between now and then if you so choose to go through it

00:41:38.210 --> 00:41:39.890
But yeah, there there's ways

00:41:39.890 --> 00:41:42.690
But it would be tricky in terms of it's in the middle of the district

00:41:43.170 --> 00:41:49.650
You carve out the one house safe here's the exception, but there are ways to potentially do that it'd be messy

00:41:50.770 --> 00:41:52.770
Yeah, and it would be um

00:41:52.770 --> 00:41:57.150
I don't know how else to enter that other than it would be, there would be exceptions

00:41:57.150 --> 00:41:58.150
to certain properties.

00:41:58.150 --> 00:41:59.540
All right, thank you.

00:41:59.540 --> 00:42:04.380
That is all I have.

00:42:04.380 --> 00:42:14.040
I'm going to open one more thing and just kind of walk you through so that we have really

00:42:14.040 --> 00:42:15.600
decision we have.

00:42:15.600 --> 00:42:21.740
This is rudimentary and it's not totally, have everything.

00:42:21.740 --> 00:42:27.750
Your decision tree is what you're being asked is to direct to you staff time to create

00:42:27.750 --> 00:42:31.590
the district or not to you staff time to create a district.

00:42:31.590 --> 00:42:36.870
operating over the past decade of the city would not be the ones to create a

00:42:36.870 --> 00:42:41.350
residential historic district for people's homes. That's kind of how we've been

00:42:41.350 --> 00:42:45.390
operating given past council's decisions. So really what we're doing tonight is

00:42:45.390 --> 00:42:49.710
talking about should city staff be used to create a district if that's the case

00:42:49.710 --> 00:42:54.310
then we will go down this path. We will prepare an RFP, we will go through getting

00:42:54.310 --> 00:42:59.750
the amount of money, we'll include it or however you'd like to include it with the

00:42:59.750 --> 00:43:05.190
budget if it gets budgeted. Then we hire a consultant and do the investigation public outreach.

00:43:06.570 --> 00:43:10.730
Then we submit that to the planning zoning commission here. It goes through public hearing and you

00:43:10.730 --> 00:43:16.500
end up with the city council public meeting final decision. At that point if you approve the

00:43:16.500 --> 00:43:20.580
coordinates that gets created and we've created the certificate of appropriateness program for

00:43:20.580 --> 00:43:29.980
this area. That's like long-winded answer if that's the path we'd go on. If the council is still within

00:43:29.980 --> 00:43:32.220
in the prior years.

00:43:32.220 --> 00:43:34.300
City staff shouldn't be creating this for a residential

00:43:34.300 --> 00:43:37.300
district or it's not the right time or whatever it is.

00:43:37.300 --> 00:43:40.700
Staff will continue to promote and preserve properties

00:43:40.700 --> 00:43:42.780
for education and the resources that we have available

00:43:42.780 --> 00:43:47.600
through state resources or federal resources.

00:43:47.600 --> 00:43:50.560
You can also nominate or go through the specific properties

00:43:50.560 --> 00:43:53.560
for the proper historic property ordinance nomination

00:43:53.560 --> 00:43:55.980
with the 180 day waiting period.

00:43:55.980 --> 00:43:57.820
That's another avenue.

00:43:57.820 --> 00:44:03.500
The other avenue, as always, an outside group, such as the friends at the avenues, can also

00:44:03.500 --> 00:44:05.660
do it if it could be somebody else.

00:44:05.660 --> 00:44:10.860
They could do or bring the documents or the investigation documents to historic preservation.

00:44:10.860 --> 00:44:14.340
They can make the determination, if it's sufficient, then it goes to the commission,

00:44:14.340 --> 00:44:16.340
it goes to the public hearing process.

00:44:16.340 --> 00:44:19.380
And the council can also make the decision.

00:44:19.380 --> 00:44:23.460
In the end, we end up here, which is not tonight.

00:44:23.460 --> 00:44:25.060
We're not talking about an ordinance tonight.

00:44:25.060 --> 00:44:29.620
we're talking about whether to fund staff to create the district or direct

00:44:29.620 --> 00:44:33.700
staff the same way we've been going the last, the last decade.

00:44:33.700 --> 00:44:39.400
Kind of where I'm summing this all up into.

00:44:39.400 --> 00:44:44.280
So before I give everybody an opportunity to talk, let me ask a question

00:44:44.280 --> 00:44:50.680
that kind of messes up this tree. So after the first presentation from the

00:44:50.680 --> 00:44:55.480
friends of the avenue requesting this move,

00:44:55.480 --> 00:45:02.480
Several citizens reached out to me who live in this historical district with some concerns

00:45:02.480 --> 00:45:10.480
related to what was being proposed and I said to them at the time, well, we'll have public hearings, we'll have public hearings, we'll have public hearings.

00:45:10.480 --> 00:45:24.480
But one of the questions I have is before we jump into the cost, is it plausible, feasible, legal to have some sort of public hearing?

00:45:24.480 --> 00:45:33.480
I know we have people here that want to speak in favor, we haven't opened this up to the community to speak on either side.

00:45:33.480 --> 00:45:37.480
Can we have a public hearing before we do anything else?

00:45:37.480 --> 00:45:47.580
In terms of a public, I mean we can have a public meeting input, not necessarily hearing.

00:45:47.580 --> 00:45:53.440
Yeah, yes, there are several opportunities that you have.

00:45:53.440 --> 00:46:00.440
One would be to instruct staff on a very specific date and time to place it on the agenda.

00:46:00.440 --> 00:46:03.440
And we could host a version of a public hearing.

00:46:03.440 --> 00:46:11.440
Now, it's not land use, public hearing, but what you're doing is you're receiving public input on one side or the other.

00:46:11.440 --> 00:46:14.440
It certainly includes informational information.

00:46:14.440 --> 00:46:22.440
Additionally, on step number three, there is conversations during the budget and the budget hearing process.

00:46:22.440 --> 00:46:34.440
This is an important step tonight for us as we would look to include any potential funding that may be needed for consultants inside of the budgeting process.

00:46:34.440 --> 00:46:41.440
And we also have the ability to access contingency that's already been plugged into the budget.

00:46:41.440 --> 00:46:50.440
But there would be a place in the budget during one of the focus areas that you could have intentional time dedicated towards this question as well.

00:46:50.440 --> 00:46:57.820
That's obviously not going to occur until later this summer in the July, August time frame.

00:46:57.820 --> 00:47:04.880
So, those would be the different scenarios that the Council would have said that it date

00:47:04.880 --> 00:47:12.170
certain which would occur in June or hosted during the budget process moving forward.

00:47:12.170 --> 00:47:19.010
I do believe it's important for the Council as you're working through this process to make

00:47:19.010 --> 00:47:27.410
sure that the city does a robust notification process to ensure that more citizens have the

00:47:27.410 --> 00:47:30.580
the opportunity to engage in this process.

00:47:30.580 --> 00:47:32.420
Thank you, Christopher.

00:47:32.420 --> 00:47:32.920
Great.

00:47:32.920 --> 00:47:35.340
After having, thank you, Jonathan, for this presentation.

00:47:35.340 --> 00:47:38.620
By the way, I really appreciated this.

00:47:38.620 --> 00:47:43.140
Understanding what this will take, I personally,

00:47:43.140 --> 00:47:45.700
and this is just part of the discussion, not the actual part.

00:47:45.700 --> 00:47:48.100
This isn't something for this year's budget.

00:47:48.100 --> 00:47:53.300
Understanding the time, the energy, also potentially hiring

00:47:53.300 --> 00:47:54.900
another person.

00:47:54.900 --> 00:48:01.900
we all know what's going on with hiring right now, I think that we need to move

00:48:01.900 --> 00:48:05.700
forward with our budget the way it is. This is something that is going to take

00:48:05.700 --> 00:48:11.100
some time whether or not however you feel on this, but having that discussion

00:48:11.100 --> 00:48:18.090
with the public moving this to public comment and not delaying our our budget

00:48:18.090 --> 00:48:23.960
looking at another person to bring in. That would be my my comment towards

00:48:23.960 --> 00:48:29.260
this understanding that that is step three that's that does delay a lot of

00:48:29.260 --> 00:48:38.880
things. So what's important to recognize is that the fiscal year if you were to

00:48:38.880 --> 00:48:42.840
insert funds into the budget that would move forward with the hiring of a

00:48:42.840 --> 00:48:48.320
consultant those funds would not be made available until October.

00:48:48.320 --> 00:48:59.180
And when we move forward with a budgeting process, we are assigning a creating new FTE positions in May.

00:48:59.180 --> 00:49:04.790
And so if you too hire again in the following October.

00:49:04.790 --> 00:49:11.910
So if it's important to recognize that this is going to be a integral step process,

00:49:11.910 --> 00:49:19.910
there's going to need to be time for consultants to create a plan if you want to move forward.

00:49:19.910 --> 00:49:24.710
and then the hiring of additional personnel wouldn't occur until the 24-budget

00:49:24.710 --> 00:49:34.910
if this is a direction you want to go, but it would also provide the timing and the sequencing necessary to build the plan for the council to review.

00:49:34.910 --> 00:49:44.660
We wouldn't be looking at the inclusion of a staff person in fiscal year 23 of E2 premature.

00:49:44.660 --> 00:49:45.660
So, I'm Eric.

00:49:45.660 --> 00:50:04.820
Yeah, I too, with the process and maybe purpose behind this, struggling to accelerate this on

00:50:04.820 --> 00:50:05.820
a fast timeline.

00:50:05.820 --> 00:50:14.010
But as a part of me, that, well, I appreciate this has come from some folks in this particular

00:50:14.010 --> 00:50:22.010
neighborhood who I just spent time today giving a community tour to a couple and drove

00:50:22.010 --> 00:50:25.010
through some parts of town that I haven't been in in a while.

00:50:25.010 --> 00:50:30.010
So I think of the tree streets, a pretty historic area.

00:50:30.010 --> 00:50:35.740
I think of the president streets as a pretty historic area.

00:50:35.740 --> 00:50:40.630
And while I appreciate value of preservation of history

00:50:40.630 --> 00:50:44.630
and understand that it's part of our strategic plan

00:50:44.630 --> 00:50:48.630
and initiatives as well, don't wonder if it's worth a pause.

00:50:48.630 --> 00:50:51.630
And a step back to think in the broader context

00:50:51.630 --> 00:50:55.630
of is residential historic preservation.

00:50:55.630 --> 00:51:08.040
value a community that we should fund and consider moving forward and that's not a decision I prepared to chime in on tonight.

00:51:08.040 --> 00:51:24.120
But I don't wonder if as we move forward with budget discussions this year updates to the strategic plan near future, relative near future.

00:51:24.120 --> 00:51:29.720
if that's not a conversation we have, because if there is a community value that says we should be

00:51:29.720 --> 00:51:38.520
looking at further regulation of residential development to preserve history, that's a value

00:51:38.520 --> 00:51:48.700
of the medium broad context, and we can plan for that as opposed to an isolated area that says

00:51:49.500 --> 00:51:56.460
because of activities that have occurred recently and concern we have about the future of this

00:51:56.460 --> 00:52:03.220
neighborhood therefore we should move forward with this rather have a broader

00:52:03.220 --> 00:52:11.770
context and a broader conversation again I'm necessarily opposed to it but I do

00:52:11.770 --> 00:52:30.130
think that it feels like seems like regulation over something that I do think

00:52:30.130 --> 00:52:33.490
we value as a community which is protection of personal property rights

00:52:33.490 --> 00:52:40.490
But there is a slippery slope, I think, and I would rather look at it in a broader context

00:52:40.490 --> 00:52:46.970
of the greater community as we move forward with the processes that we're already looking

00:52:46.970 --> 00:52:50.810
at as far as community surveys and strategic planning.

00:52:50.810 --> 00:52:58.090
And I don't think this isn't isolated, particularly special historic area, but we have others

00:52:58.090 --> 00:53:03.830
that can be considered as well.

00:53:03.830 --> 00:53:04.830
Anybody else?

00:53:04.830 --> 00:53:10.500
Is there something?

00:53:10.500 --> 00:53:34.300
You know, I would probably echo what Chris and Sean had said a little bit is, but my thought also goes to, this is a very specific area, or a smaller section of our town, and we also then have to go out and potentially hire somebody else to help run this small area.

00:53:34.300 --> 00:53:42.270
I think Sean had said maybe now's not that time, maybe we need to take a step back and

00:53:42.270 --> 00:53:49.830
look at what is that overarching belief or feeling, maybe a public comment period from

00:53:49.830 --> 00:53:51.870
individuals down in this area.

00:53:51.870 --> 00:53:56.270
Give everybody that chance to come in and speak.

00:53:56.270 --> 00:54:05.540
I haven't listened to the historical preservation, maybe on this one.

00:54:05.540 --> 00:54:13.070
I think it's important for us to really say is this what we want as a city.

00:54:13.070 --> 00:54:19.320
Thank you.

00:54:19.320 --> 00:54:24.420
So I really like the concept of the historic district.

00:54:24.420 --> 00:54:29.700
What I didn't understand a few months ago was how strict the state laws are when you

00:54:29.700 --> 00:54:31.660
call it a district.

00:54:31.660 --> 00:54:35.580
Is there any options such as having like a historic zone where there are certain guidelines

00:54:35.580 --> 00:54:42.180
it could be reviewed by city staff more like a building permit rather than going through

00:54:42.180 --> 00:54:46.500
the Historic Preservation Commission and give us more leeway on things that we're not going

00:54:46.500 --> 00:54:50.580
to worry about so that we don't get bogged down with the bureaucratic process for things

00:54:50.580 --> 00:54:56.010
at the end of the day are kind of going to be a rubber stamp. Yes, anyways.

00:54:56.010 --> 00:55:07.000
Yes, avenues that cities have done if you look at even Boise has something like a downtown

00:55:07.000 --> 00:55:13.720
district overlay. It ends up being like a form based code. You can google that one which is

00:55:13.720 --> 00:55:18.240
in this area for these properties. We're going to regulate them to make them look a certain

00:55:18.240 --> 00:55:25.270
way or use certain materials, that then comes into play with a local land use planning act

00:55:25.270 --> 00:55:32.700
to separate section of state statute that has some regulatory authority, but it also

00:55:32.700 --> 00:55:40.040
has, the drawback is if you start regulating properties that become unconforming or you

00:55:40.040 --> 00:55:44.860
take away some of their property rights, the state legislature has also balanced that to

00:55:44.860 --> 00:55:49.180
say that some of those come under judicial review for taking property rights, so the

00:55:49.180 --> 00:55:55.420
The zoning act has that balancing act of how much you regulate versus what's permitted

00:55:55.420 --> 00:55:56.420
now.

00:55:56.420 --> 00:55:57.420
What are you taking?

00:55:57.420 --> 00:55:58.420
What are you not taking?

00:55:58.420 --> 00:56:02.980
But there are other avenues that could be balanced that way.

00:56:02.980 --> 00:56:06.780
Cortiline has one in their downtown if I think it's a downtown overlay or something like

00:56:06.780 --> 00:56:07.780
that.

00:56:07.780 --> 00:56:11.980
So they make buildings be constructed in a certain manner based on their downtown look

00:56:11.980 --> 00:56:12.980
and feel.

00:56:12.980 --> 00:56:19.490
And if you think of the residential areas, I mean, I believe that tells some of these other

00:56:19.490 --> 00:56:23.450
resort towns get through their requirements to look and feel a certain way

00:56:23.450 --> 00:56:28.190
not in this state but like Park City's one of them makes them do that that's

00:56:28.190 --> 00:56:38.380
through a land use kind of authority. I like Spencer your idea of looking at

00:56:38.380 --> 00:56:44.140
something else as I was reading all the reports on this it kind of went from a

00:56:44.140 --> 00:56:48.590
the neighbors had what they thought was a good idea and it'd be it'd be

00:56:48.590 --> 00:56:55.280
really great to a bureaucratic snafu of some kind is how I looked at it it

00:56:55.280 --> 00:56:59.560
just like spun out of control.

00:56:59.560 --> 00:57:05.040
Yeah, the concept that for 300 houses and 40 businesses,

00:57:05.040 --> 00:57:09.010
we'd have to have a full-time person on staff.

00:57:09.010 --> 00:57:11.010
I cannot get my mind around that.

00:57:11.010 --> 00:57:17.620
He said that right now, 25% of staff time

00:57:17.620 --> 00:57:23.180
is used for historical preservation-related things.

00:57:23.180 --> 00:57:35.260
So adding this triangle would add 75% to need a whole other body in three times.

00:57:35.260 --> 00:57:37.060
Triples the number of properties?

00:57:37.060 --> 00:57:38.660
Triples the number of properties.

00:57:38.660 --> 00:57:41.740
So therefore, I just, I just find that.

00:57:41.740 --> 00:57:42.740
I guess.

00:57:42.740 --> 00:57:47.480
Yeah, I find that hard to believe.

00:57:47.480 --> 00:57:57.530
Yeah, I just, that's, it just seems like there, there must be a way to somehow meet somewhere in the middle of the trip.

00:57:57.530 --> 00:58:07.820
with nothing and the full blow thing. I'm having a hard time though saying yes, staff should keep

00:58:07.820 --> 00:58:14.940
working on this where it's a long it's become a long-term thing. That's where I'm having a hard time.

00:58:14.940 --> 00:58:30.440
Phillings. At this point in time instead of moving towards an action maybe a discussion and asking

00:58:30.440 --> 00:58:40.940
city staff to move forward with a input I guess would be asked for moving forward in the next month

00:58:40.940 --> 00:58:47.660
or two to have that, publicize that and bring that back so that we can have the public input

00:58:47.660 --> 00:58:50.700
on this as we have not had that yet.

00:58:50.700 --> 00:58:55.430
Madam Mayor, just a quick clarification on that.

00:58:55.430 --> 00:59:03.110
So would the council like to have that like at the 6 p.m. public input session as a part

00:59:03.110 --> 00:59:05.990
of a regular scheduled meeting at some point in the future?

00:59:05.990 --> 00:59:07.960
Is that what I'm understanding?

00:59:07.960 --> 00:59:09.880
Well, as opposed to a special meeting?

00:59:09.880 --> 00:59:11.880
As opposed to a special meeting?

00:59:11.880 --> 00:59:12.880
Yes.

00:59:12.880 --> 00:59:16.380
That's what I was thinking.

00:59:16.380 --> 00:59:22.380
Could we publicize that, though, as saying this public hearing is going to be to discuss?

00:59:22.380 --> 00:59:26.380
It's not a public hearing, it's the public input.

00:59:26.380 --> 00:59:30.380
So people know that's what we want to talk about.

00:59:30.380 --> 00:59:37.380
We'd advertise it as a public input or a council listening session to occur at this point in time.

00:59:37.380 --> 00:59:41.880
We would make sure that the language didn't restrict the council

00:59:41.880 --> 00:59:46.080
from a land use perspective so you had the flexibility to engage

00:59:46.080 --> 00:59:50.880
in a manner that was appropriate for you and also allowed you a venue

00:59:50.880 --> 00:59:53.280
to receive the information you need to make a good decision.

00:59:53.280 --> 00:59:59.480
And then could we also specifically notify the homes

00:59:59.480 --> 01:00:05.900
in the proposed district direct mail or some or ask friends

01:00:05.900 --> 01:00:10.620
of the avenue to do that, which I'm sure they may want to anyway.

01:00:10.620 --> 01:00:16.620
We could certainly make sure that we assist in a level of notification just recognizing

01:00:16.620 --> 01:00:19.390
there's a cost to that.

01:00:19.390 --> 01:00:20.390
Right.

01:00:20.390 --> 01:00:25.670
And so we would, but I think it's important that we could use a different collection of

01:00:25.670 --> 01:00:32.590
strategies, whether it be geofencing or whether it be something that is a direct mail piece

01:00:32.590 --> 01:00:33.590
as well.

01:00:33.590 --> 01:00:38.670
So we could work with Josh Palmer, our public information officer, to find the best way to

01:00:38.670 --> 01:00:44.670
Whether it be a combination of social media, drug mail, whatever that would like to get that word out.

01:00:44.670 --> 01:00:45.670
Thank you.

01:00:45.670 --> 01:00:47.310
John.

01:00:47.310 --> 01:00:54.340
I would also note, several years ago, when we were talking about things like

01:00:54.340 --> 01:01:02.300
Canadian Rim Development or large developments in town, I think we understood as a council that those have impacts beyond

01:01:02.300 --> 01:01:05.300
necessarily the area just in which it's happening.

01:01:05.300 --> 01:01:30.300
And so, while I do think it's important that we have some specific outreach to this particular neighborhood that's being proposed, I think some broad publicity of Act 2 absolutely to get some input from the general public about what do you think about historic districts and these types of activities that the council may consider in the future.

01:01:30.300 --> 01:01:35.580
Because again, I think back to gaining rem development and some of these things where you have people show up and say,

01:01:35.580 --> 01:01:42.020
well gosh, I didn't know anything about it well, because the requirement is you only have to notify the people within the X-speed and so forth.

01:01:42.020 --> 01:01:55.580
So I would just encourage us to also make some broad publicity about this conversation, because I doubt this is the only one that may come forward in the community.

01:01:55.580 --> 01:02:02.580
if it is something that is considered, if it does move forward, I don't know that we might look at other areas.

01:02:02.580 --> 01:02:07.580
So I think we should have that discussion of what is the value of the community comes to.

01:02:07.580 --> 01:02:17.190
So is that sufficient direction? Okay, perfect. Thank you Jonathan.

01:02:17.190 --> 01:02:26.300
Okay, so the next, that's it for the items of consideration.

01:02:26.300 --> 01:02:31.300
The next item on the agenda is for general public input.

01:02:31.300 --> 01:02:36.300
This is specifically for items that are not on the agenda today.

01:02:36.300 --> 01:02:39.300
If anybody in the audience wishes to come down,

01:02:39.300 --> 01:02:43.300
you would be able to speak for two minutes.

01:02:43.300 --> 01:02:49.700
Anybody interested? Thank you.

01:02:49.700 --> 01:02:53.700
Please, when you come down, make sure you turn on the mic

01:02:53.700 --> 01:02:57.700
and state your name and whether you're a resident of Twin Falls.

01:02:57.700 --> 01:03:05.080
My name is Patty Cameron, and I am a resident of Winfals.

01:03:05.080 --> 01:03:06.400
Thank you.

01:03:06.400 --> 01:03:11.120
And please correct me if I'm doing something wrong up here.

01:03:11.120 --> 01:03:16.480
But a couple of weeks ago, we had someone from the city bring

01:03:16.480 --> 01:03:22.040
up that they wanted to make the homeowners accountable

01:03:22.040 --> 01:03:24.320
for their utilities.

01:03:24.320 --> 01:03:28.600
And I don't know when that is coming on the agenda next.

01:03:28.600 --> 01:03:31.280
You're talking about rental landlords?

01:03:31.280 --> 01:03:32.280
Yes.

01:03:32.280 --> 01:03:35.080
That was on last week's agenda.

01:03:35.080 --> 01:03:37.800
OK, then I'm pessimistic as I got here a little late.

01:03:37.800 --> 01:03:43.100
Can I address that, or am I not allowed to?

01:03:43.100 --> 01:03:45.940
We're going to have two open houses that are scheduled.

01:03:45.940 --> 01:03:50.750
Both are on June.

01:03:50.750 --> 01:03:52.070
One is at four o'clock.

01:03:52.070 --> 01:03:54.390
The other is at seven o'clock.

01:03:54.390 --> 01:03:57.190
The council did not make a decision

01:03:57.190 --> 01:03:58.510
as to what action to take.

01:03:58.510 --> 01:04:01.830
They instructed staff to host a series of open houses.

01:04:01.830 --> 01:04:06.830
So again, on June 9th, 1 at 4, 1 at 7 PM in this building,

01:04:06.830 --> 01:04:09.830
we're going to be entertaining.

01:04:09.830 --> 01:04:12.220
We're going to be sharing the idea,

01:04:12.220 --> 01:04:14.220
and then also receiving input.

01:04:14.220 --> 01:04:17.220
We'll be bringing that input back to the City Council to seek direction

01:04:17.220 --> 01:04:21.110
if they want us to modify the ordinances.

01:04:21.110 --> 01:04:26.110
And also, there would be room for written comments.

01:04:26.110 --> 01:04:28.110
Absolutely, we can-

01:04:28.110 --> 01:04:29.110
If you can't attend.

01:04:29.110 --> 01:04:40.110
Yes, certainly by email, by phone call, whatever that looks like either to any member of the city manager's office or to Brent Hyatt who is overseeing our utility services division.

01:04:40.110 --> 01:04:42.110
Happy to accept any input that you have.

01:04:42.110 --> 01:04:46.110
Okay. Thank you. Thank you. Anyone else?

01:04:46.110 --> 01:04:54.260
Hey, that closes the public input section advisory board report. Any announcements from Council Chris Reed.

01:04:54.260 --> 01:04:57.260
I don't have an announcement, but I do have a question.

01:04:57.260 --> 01:05:01.260
The intersection of Pole Line and Blue Lakes.

01:05:01.260 --> 01:05:03.260
I know that it's been a discussion.

01:05:03.260 --> 01:05:09.190
Who is in charge of those four little islands for crosswalks?

01:05:09.190 --> 01:05:12.900
Who is in charge of maintenance for those?

01:05:12.900 --> 01:05:15.380
Probably the city.

01:05:15.380 --> 01:05:21.380
So the jurisdiction of the roadways are that of I.T.D.

01:05:21.380 --> 01:05:27.380
Okay, and at the time in which they were constructed, we entered into a series of maintenance agreements.

01:05:27.380 --> 01:05:35.380
The city owns the maintenance responsibilities on the whole line going west.

01:05:35.380 --> 01:05:41.380
And so I would assume that we would also own the islands at that intersection as well.

01:05:41.380 --> 01:05:45.380
Okay, so those four islands, okay, probably are maintenance responsibilities.

01:05:45.380 --> 01:06:01.640
It'd be the most appropriate person to talk with about maybe some weed care and cleaning up some of the gravel and sand and I think you just did and we will send that out to them.

01:06:01.640 --> 01:06:02.900
Chris, they were out there.

01:06:02.900 --> 01:06:05.900
You're welcome for making that a public announcement.

01:06:05.900 --> 01:06:07.900
Sorry about that guys.

01:06:07.900 --> 01:06:10.900
We were out there working on trading last week.

01:06:10.900 --> 01:06:13.900
My understanding is that's the Parks.

01:06:13.900 --> 01:06:20.900
It is the Parks Department, and what we do is we contract that out with a third party.

01:06:20.900 --> 01:06:21.900
Perfect.

01:06:21.900 --> 01:06:27.900
That is responsible for the weeding the maintenance and the care of those islands.

01:06:27.900 --> 01:06:37.900
We've had a number of conversations about the topic of the islands, not only from a position of duty, cleanliness and those type of things, but also from a term of functionality.

01:06:37.900 --> 01:06:44.900
When we think about the traffic that's backing out in the positioning of those islands is there not just a different structure as ITD is

01:06:44.900 --> 01:06:54.900
Looking at a whole myriad of different solutions if one solution isn't to be able to expand those cues so the tractor trailers don't block the inside turnlights

01:06:54.900 --> 01:06:58.340
Thank you

01:06:58.340 --> 01:07:01.680
Anyone else? Nikki?

01:07:01.680 --> 01:07:08.680
The summer reading program at the public library is June 6th through July 30th

01:07:08.680 --> 01:07:14.680
What I think is interesting this year, they're having quite a few hands-on things in City Park.

01:07:14.680 --> 01:07:21.680
And one of the things is Corbin, Maxie, nationally recognized the animal expert.

01:07:21.680 --> 01:07:25.680
Many people have seen him on late night TV shows and stuff like that.

01:07:25.680 --> 01:07:27.680
He's going to be here in our park.

01:07:27.680 --> 01:07:33.420
And he's going to have 15 different animals for kids to come meet.

01:07:33.420 --> 01:07:47.280
And the theme of summer reading is read beyond the beaten past, so they're going to do a lot of nature things, and he's bringing his best friend, I guess, which is a 14 foot, now buying out Burmese and Ithon.

01:07:47.280 --> 01:07:56.590
So, to City Park, anybody can go, I'll bring it up again with a better date and time that I believe it's June 9th and the end.

01:07:56.590 --> 01:07:58.590
Excellent. Anyone else?

01:07:58.590 --> 01:08:07.640
I did hear today that the back-the-blue event has been scheduled for July 9th, excuse me, 8th,

01:08:07.640 --> 01:08:14.210
odds of Friday, 4 to 8, so that is, put that on your calendars.

01:08:14.210 --> 01:08:17.090
Is there anything from the City Manager's office?

01:08:17.090 --> 01:08:22.090
Just a quick reminder that we will not be meeting next week.

01:08:22.090 --> 01:08:27.550
At our next regular schedule meeting of the Council will be on June 6th at 5 o'clock.

01:08:27.550 --> 01:08:28.550
Thank you.

01:08:28.550 --> 01:08:37.060
Okay, there's no public hearings tonight and item 10 on the agenda was to move into executive session again

01:08:37.620 --> 01:08:40.020
We did complete all our business

01:08:40.820 --> 01:08:44.900
4 o'clock, so we will be a journey. Thank you everyone