WEBVTT

00:01:57.580 --> 00:02:03.580
Ladies and gentlemen, welcome to the March 13th, 2023 City Council meeting.

00:02:03.580 --> 00:02:06.580
I want to confirm we have a quorum.

00:02:06.580 --> 00:02:10.580
We have all seven members present in council chambers.

00:02:10.580 --> 00:02:14.580
First item on the agenda is executive session.

00:02:14.580 --> 00:02:24.100
An action item under 74-2061E to consider preliminary negotiations involving matters of trade or commerce

00:02:24.100 --> 00:02:29.820
In which the governing body is in competition with governing bodies in other states or nations

00:02:31.270 --> 00:02:32.770
council wishes

00:02:32.770 --> 00:02:34.770
Chris Reed

00:02:38.300 --> 00:02:48.660
Second most of my Christopher Reed seconded by Jason Brown to move into executive session under section 74-2061

00:02:49.740 --> 00:02:51.740
Amy roll call please

00:02:54.350 --> 00:03:04.350
Yes, yes

00:03:05.390 --> 00:03:08.450
I want to know we will be in executive session

00:03:08.450 --> 00:03:10.610
for approximately 30 minutes.

00:03:10.610 --> 00:03:13.370
We'll be back down to chambers

00:03:13.370 --> 00:03:16.010
to start the regular meeting at five.

00:03:16.010 --> 00:03:34.930
Thank you.

00:03:34.930 --> 00:03:36.490
Good evening, ladies and gentlemen,

00:03:36.490 --> 00:03:41.490
and welcome to the March 13th, 2023 City Council meeting.

00:03:42.810 --> 00:03:47.050
We are reconvening from a executive session

00:03:47.050 --> 00:03:48.410
we had up for 30.

00:03:48.410 --> 00:03:51.810
So I will again call the meeting to order

00:03:51.810 --> 00:03:54.450
The first item on the agenda is the Pledge of Allegiance

00:03:54.450 --> 00:03:57.330
and we have a room full of Girl Scouts

00:03:57.330 --> 00:03:59.850
and I pass that they come down to the front

00:03:59.850 --> 00:04:04.840
and lead us in the pledge.

00:04:04.840 --> 00:05:11.630
So anybody in the Girl Scout troop, come on down.

00:05:11.630 --> 00:05:12.870
Don't sit down.

00:05:12.870 --> 00:05:19.020
Come up to the mic and introduce yourself

00:05:19.020 --> 00:05:20.740
and tell us what troop you're with.

00:05:20.740 --> 00:05:28.740
And Jackie, make sure that mics on the button should be.

00:05:28.740 --> 00:05:29.940
Okay, it's on now.

00:05:29.940 --> 00:05:32.780
My name is Jackie and I'm from troop 480.

00:06:03.470 --> 00:06:10.160
My name is Al7 and I'm from troop 470.

00:06:10.160 --> 00:06:15.560
My name is Grace and I'm from troop 470.

00:06:15.560 --> 00:06:34.460
Emilets when they're from troop 470.

00:06:34.460 --> 00:06:39.240
My name is Joanna and I'm from troop 470.

00:06:39.240 --> 00:06:53.660
Family and I'm from troop 470.

00:06:53.660 --> 00:06:55.360
troop 616.

00:06:55.360 --> 00:07:01.480
My name is Mercedes, I'm 26.

00:07:01.480 --> 00:07:14.310
My name is Lauren and I'm from troop 470.

00:07:14.310 --> 00:07:17.310
My name is Alexis and I'm from troop 470.

00:07:17.310 --> 00:08:03.600
My name is Rami, 470.

00:08:03.600 --> 00:08:19.470
My name is Vittura, I'm from Troop, 23.

00:08:19.470 --> 00:08:35.120
My name is Viola, and I'm Troop, 173.

00:08:35.120 --> 00:08:42.770
My name is Lily, and my Troop is 173.

00:08:42.770 --> 00:08:55.680
472.

00:08:55.680 --> 00:09:10.710
I'm from Troop, 23.

00:09:10.710 --> 00:09:15.340
My name is Viola, and I'm Troop, 173.

00:09:15.340 --> 00:09:19.340
My name is Lily, and my Troop is 173.

00:09:19.340 --> 00:09:20.340
Thank you, everyone.

00:09:20.340 --> 00:09:21.340
And I have treats for you.

00:09:21.340 --> 00:09:24.940
I have a proclamation, this is why you all are here,

00:09:24.940 --> 00:09:25.940
and I'd like to read it.

00:09:25.940 --> 00:09:29.340
It's from Proclamation for Girl Scout week,

00:09:29.340 --> 00:09:33.180
the week of March 12th through 18th, 2023,

00:09:33.180 --> 00:09:35.940
whereas Girl Scouts of the United States of America

00:09:35.940 --> 00:09:40.100
observe the 110th anniversary of its founding

00:09:40.100 --> 00:09:45.140
on March 12th, 2023, and whereas since 1912,

00:09:45.140 --> 00:09:47.260
Girl Scouts of America have helped girls

00:09:47.260 --> 00:09:50.940
discover themselves, their passions and their talents

00:09:50.940 --> 00:09:54.700
through education, entrepreneurship, outdoor activities,

00:09:54.700 --> 00:09:57.820
and community service, whereas Girl Scouts

00:09:57.820 --> 00:10:02.540
provides a valuable K through 12 curriculum

00:10:02.540 --> 00:10:07.080
that enhances knowledge through experimental.

00:10:07.080 --> 00:10:10.320
There we go.

00:10:10.320 --> 00:10:13.240
Whereas Girl Scouting is an important path

00:10:13.240 --> 00:10:16.200
for girls to become strong, self-reliant, productive,

00:10:16.200 --> 00:10:20.200
and confident women, whereas Girl Scouts of Silver Council

00:10:20.200 --> 00:10:25.480
delivers the Girl Scout program to K through 12 girls throughout Southern Idaho,

00:10:25.480 --> 00:10:30.240
whereas Girl Scouting is an investment in tomorrow's leadership in Idaho, and

00:10:30.240 --> 00:10:35.020
whereas Girl Scout Week will be celebrated in our state from March 12th

00:10:35.020 --> 00:10:41.060
through 18th, 2023. Now therefore, I, Ruth Pierce, Mayor of the City of Twin Falls,

00:10:41.060 --> 00:10:46.120
do hereby proclaim the week of March 12th through 18th this Girl Scout Week

00:10:46.120 --> 00:10:51.120
throughout the City of Twin Falls and urge all citizens to recognize this observance.

00:10:51.120 --> 00:11:34.250
So Girl Scout Week has several activities that are associated with it, and one of them is to spread the word.

00:11:34.250 --> 00:11:40.600
And so that's part of why we're here, our formation, and so we wanted to thank you for your continuing support of Girl Scouts

00:11:40.600 --> 00:11:44.600
and helping us spread the word that we're here as an organization. So we have a good time.

00:11:44.600 --> 00:12:07.050
Thank you ladies. So you're welcome to stay ladies, but if you want to, we'll take a break for a minute

00:12:07.050 --> 00:12:11.730
for a minute and you can take off. We have your baskets of cookies so do you

00:12:11.730 --> 00:13:59.600
need your basket back? Do you need the basket back? Okay so that being done we'll

00:13:59.600 --> 00:14:06.320
move on to the consent calendar. Council wishes. Craig Hawkins.

00:14:06.320 --> 00:14:11.840
Mayor I'd like to make a motion we accept the consent calendar. Thank you do I have a second.

00:14:11.840 --> 00:14:18.390
Thank you motion by Craig Hawkins seconded by Alex Kaval to approve the consent

00:14:18.390 --> 00:14:36.010
calendar as written. Amy Rolcovo, please. Yes. Yes. Thank you. Motion passes 7-0.

00:14:36.010 --> 00:14:42.810
Hey, next under items of consideration is an action item. A request to approve the state

00:14:42.810 --> 00:14:48.950
and local fiscal recovery fund recommendation to the City Council. And we have Brianna Howard,

00:14:48.950 --> 00:15:05.320
our CFO. Welcome Brianna. And we're excited to see what you all want to do is I'm going

00:15:05.320 --> 00:15:09.680
to give a little bit of a background first to talk about where the state and local fiscal

00:15:09.680 --> 00:15:16.030
recovery funds come from the history there in the offices the city of Twin Falls did to

00:15:16.750 --> 00:15:38.700
the COVID-19 public health emergency. The federal government provided governments across the country

00:15:38.700 --> 00:15:44.140
with resources to fight the pandemic through the American Rescue Plan Act of 21, the ARPA.

00:15:44.140 --> 00:15:50.030
And into law in March 11, 2021, among other provisions, one of the key components of ARPA is

00:15:50.030 --> 00:15:57.700
the state and local fiscal recovery fund, which committed $350 billion to state local governments

00:15:57.700 --> 00:16:01.420
to support their response and recovery from COVID-19.

00:16:01.420 --> 00:16:03.900
The fund was created to support families and businesses

00:16:03.900 --> 00:16:07.020
struggling with its public health and economic impacts,

00:16:07.020 --> 00:16:10.300
maintain vital public services, and build a strong recovery

00:16:10.300 --> 00:16:12.700
by making investments to support long-term growth

00:16:12.700 --> 00:16:13.940
and opportunity.

00:16:13.940 --> 00:16:16.340
The City of Twin Falls was allocated 8 million

00:16:16.340 --> 00:16:22.620
since were determined by the population

00:16:22.620 --> 00:16:24.940
within the unit of government's jurisdiction.

00:16:24.940 --> 00:16:28.180
In April of 21, the Treasury released the final rule

00:16:28.180 --> 00:16:30.540
for the program that allowed for a standard allowance

00:16:30.540 --> 00:16:33.160
for revenue loss up to $10 million

00:16:33.160 --> 00:16:38.000
for the entire period of performance from March 3rd, 21,

00:16:38.000 --> 00:16:48.140
31st, 24, 31st of 2000.

00:16:48.140 --> 00:16:51.710
The city of twin lung using the standard allowance

00:16:51.710 --> 00:16:55.090
for which means that we do not intend,

00:16:55.090 --> 00:16:57.770
we do not need to allocate the funds to an approved project

00:16:57.770 --> 00:16:59.890
that is within the guidelines

00:16:59.890 --> 00:17:02.090
to mitigating COVID and the high risks,

00:17:02.090 --> 00:17:04.230
health risks of the panel.

00:17:04.230 --> 00:17:07.210
What we are doing is we plan on using the standard allowance

00:17:07.210 --> 00:17:08.670
within the city of twin falls out

00:17:08.670 --> 00:17:14.160
to allocate the 8,000,000 for a period

00:17:14.160 --> 00:17:16.550
of the meeting proceeds to projects

00:17:16.550 --> 00:17:19.500
that will significantly

00:17:19.500 --> 00:17:22.140
the city organizing created a citizen advisory committee

00:17:22.140 --> 00:17:25.060
on September of 2023 to determine the use

00:17:25.060 --> 00:17:27.900
of the city's SLF RF funds.

00:17:27.900 --> 00:17:30.700
Membership consisted of nine members, the mayor,

00:17:30.700 --> 00:17:32.660
two council members, two members serving

00:17:32.660 --> 00:17:34.660
on one of the city's advisory committees

00:17:34.660 --> 00:17:38.420
and four individuals residing in the city of Twin Falls.

00:17:38.420 --> 00:17:40.540
The attached state and local fiscal recovery fund

00:17:40.540 --> 00:17:43.760
recovery fund ad hoc committee charter outlined the need

00:17:43.760 --> 00:17:47.160
for a collaborative process to transparently and effectively

00:17:47.160 --> 00:17:51.720
expend the SLF-RF funds allocated to the Twin Falls,

00:17:51.720 --> 00:17:53.820
establish the objectives for the committee,

00:17:53.820 --> 00:17:55.740
identify committee membership,

00:17:55.740 --> 00:17:58.000
define the role and set the duration.

00:17:58.000 --> 00:17:59.380
Since September of 22,

00:17:59.380 --> 00:18:08.610
city staff and members of the SLF-RF committee projects

00:18:08.610 --> 00:18:10.690
take public comment and recommend projects

00:18:10.690 --> 00:18:13.680
that should be used within the city's allocation of funds.

00:18:13.680 --> 00:18:16.200
The city accommodated this process of allocation

00:18:16.200 --> 00:18:18.000
in three definitive segments,

00:18:18.000 --> 00:18:22.980
applications, presentations, and the City advertised the process to the City of

00:18:22.980 --> 00:18:27.940
Twin Falls website, social media, radio, and local media partners. Applications

00:18:27.940 --> 00:18:35.060
were received until November 11th, through November 11th, through December 29th, 22 in all applications.

00:18:35.060 --> 00:18:52.200
47,087,331 dollars were heard and individually scored for discussion on

00:18:52.200 --> 00:18:57.810
January 12th and January 19th voted to recommend the attached list,

00:18:57.810 --> 00:19:18.140
location, subsequent devoting the 1,000 versus the two of the streets department.

00:19:18.140 --> 00:19:23.440
In addition to the above recommendation, the SLF or F Committee compiled a secondary list

00:19:23.440 --> 00:19:27.980
sorted by a priority of projects that could be used in lieu of any of the projects in the

00:19:27.980 --> 00:19:34.580
first list should council decide not to move forward with any one item.

00:19:34.580 --> 00:19:38.340
The rules and responsibilities of council will be to reach consensus.

00:19:38.340 --> 00:19:45.210
Idaho Code Section 5103 allows for the city council to amend appropriations bill.

00:19:45.210 --> 00:20:04.510
A states the city council any city may, but the same procedure is used in adopting the original appropriations ordinance at any time during the fiscal current appropriations ordinance to a greater amount if after the adoption of the appropriation ordinance additional revenue will accrue to the city during the current fiscal year.

00:20:04.510 --> 00:20:22.690
In 465,000 we receive this as federal budget, so we are coming together today to the history

00:20:22.690 --> 00:20:29.920
of the COBPS, sent to all the state and local fiscal recovery funds charter as well, in addition

00:20:29.920 --> 00:20:37.560
to a final spreadsheet, their final allocation that shows what the committee has prioritized.

00:20:37.560 --> 00:20:42.120
So on the final sheet, does everybody have a copy of the final sheet, whether it's electronic

00:20:42.120 --> 00:20:51.140
It was quite a process. We did some grading, some valuing, a couple different times. There

00:20:51.140 --> 00:20:57.180
was quite a bit of discussion. This encapsulates the entire process of voting. What was decided

00:20:57.180 --> 00:21:04.180
was on the right where it says summation. So the 8,465,111 is on the top right. Below

00:21:04.180 --> 00:21:13.900
it are the ones that were sorted by priority of what the ad decided to allocate to. The

00:21:13.900 --> 00:21:25.200
The first one being, I think you guys all have paid, so there are some that were put on teams

00:21:25.200 --> 00:21:27.680
as well as paper copies.

00:21:27.680 --> 00:21:36.280
We tried to put in here the analysis of the project that was given, the packet that was

00:21:36.280 --> 00:21:39.120
given to the community through Alps on each one of these.

00:21:39.120 --> 00:21:43.440
So the first one that you see in that packet in the handout was the Vista Bonita Park.

00:21:43.440 --> 00:21:52.180
The second one is the Idaho Housing Company, which is shown in Fall's Grade funding.

00:21:52.180 --> 00:22:00.780
Fourth is the fleet maintenance point five million on the development feasibility study for 125,000

00:22:01.420 --> 00:22:09.610
Police Department crime scene and 3D mapping and diagram for 62,000 a fellowship hall

00:22:09.950 --> 00:22:21.140
which reading expenses because we are trying to invest in something that's when it can for

00:22:21.780 --> 00:22:37.870
Gene I'd watch a stadium so we get started. I would like to add a couple things first of all the committee work very hard

00:22:37.870 --> 00:22:41.270
I will show you the binder that we got to work with.

00:22:41.270 --> 00:22:46.870
So these five little pieces of paper you have are not indicative of what we did.

00:22:46.870 --> 00:22:52.570
But I think almost everyone from the committee is here and I'd like to recognize them.

00:22:52.570 --> 00:23:03.560
I know Eric Keck, Michelle McParlin from CSI, Perry Gardner from CSI, Tom Frank.

00:23:03.560 --> 00:23:07.260
I think Debbie Dane is not here, Rudy Ash and Brenner's here.

00:23:07.260 --> 00:23:10.820
And then the two council members that served with me,

00:23:10.820 --> 00:23:14.230
Arcris Reed and Spencer Cutler.

00:23:14.230 --> 00:23:18.390
So they work very hard, and I appreciate all the hard work

00:23:18.390 --> 00:23:21.870
in the time everybody took to do that.

00:23:21.870 --> 00:23:24.110
There's a lot of work, there was a lot of discussion,

00:23:24.110 --> 00:23:26.830
there was quite a bit of information that was provided.

00:23:26.830 --> 00:23:28.510
Ultimately to the City of Twin Falls,

00:23:28.510 --> 00:23:31.230
we reached back out to ask for any missing information

00:23:31.230 --> 00:23:33.710
for to make sure that these were viable companies

00:23:33.710 --> 00:23:41.650
or viable businesses.

00:23:41.650 --> 00:23:48.050
you guys either if you have anything to add about the process Spencer I just

00:23:48.050 --> 00:23:52.970
want to say I support the process you know to be frank this list is not what I

00:23:52.970 --> 00:23:56.410
wanted it to look like but it wasn't about me it was nine members that

00:23:56.410 --> 00:24:02.910
represented broader interests of the community and so I did as a successful

00:24:02.910 --> 00:24:16.100
taking considering them we had to say no to so like I said the process not how I

00:24:16.100 --> 00:25:01.350
wanted the list to look but I still want to support because I feel like we also

00:25:01.350 --> 00:25:07.270
have members that made the presentation out in the audience as well so if we

00:25:07.270 --> 00:25:13.520
need have any questions or need additional information the process you

00:25:13.520 --> 00:25:17.440
have a thought yes so let me explain this that we're seeing right here this final

00:25:17.440 --> 00:25:21.640
scoring sheet just a little bit more for some background information so on this

00:25:21.640 --> 00:25:26.240
sheet there's actually two pages the back one was items that were not mentioned

00:25:26.240 --> 00:25:30.480
I'll talk about that so on this sheet where every this every project that was

00:25:30.480 --> 00:25:36.400
mentioned and it was scored. Each of the committee members had five votes to cast to make their

00:25:36.400 --> 00:25:41.840
scoring conversations a little bit more a little easier to facilitate. So the first project got

00:25:41.840 --> 00:25:46.320
a score of five points that they wanted and the second was four points three down to one.

00:25:46.320 --> 00:25:52.000
So when we initially graded, that was the top where this is the remaining allocation. This is

00:25:52.000 --> 00:25:59.790
where we want where the committee wanted to put their funds in total. After that, after that,

00:25:59.790 --> 00:26:06.960
There was a second round of voting that had not

00:26:06.960 --> 00:26:12.810
unequivocally on the top list, but maybe there'd be people.

00:26:12.810 --> 00:26:17.010
So you'll see that on the second section that was voted as well.

00:26:17.010 --> 00:26:20.530
So the amounts that were funded in total on that bottom part

00:26:20.530 --> 00:26:22.890
is the two million the VISTA-VONITA park.

00:26:22.890 --> 00:26:28.860
Anything that was not not received of vote

00:26:28.860 --> 00:26:31.380
was on the second back page.

00:26:31.380 --> 00:26:37.410
So we're easier to be able to analyze which ones were,

00:26:37.410 --> 00:26:56.610
has support of multiple members in which to not. Jason.

00:26:56.610 --> 00:27:12.390
Sit back, but as I've looked at this, the one quest of Eastland.

00:27:12.390 --> 00:27:36.330
So, new portion is East of Eastland. We haven't presented it before for council

00:27:36.330 --> 00:27:46.280
directive funds. Any other questions overall?

00:27:46.280 --> 00:27:58.960
Okay, go ahead. There's projects that were in priority and

00:27:58.960 --> 00:28:02.310
discussion amongst yourselves on if you want to take the

00:28:02.310 --> 00:28:13.990
So what I might recommend is we go through these projects and if anybody has additional

00:28:13.990 --> 00:28:22.560
information they would like to either hear from the presenter or put it aside and then

00:28:22.560 --> 00:28:29.300
we just go through each one and see if there's any that don't have any questions and how's

00:28:29.300 --> 00:28:30.540
that.

00:28:30.540 --> 00:28:35.440
So the first one is the parks, vista, baneeta park.

00:28:35.440 --> 00:28:38.440
Is there anybody here that would like to have further discussion on that?

00:28:38.440 --> 00:28:41.980
I think I'll have a few questions for that one.

00:28:41.980 --> 00:28:45.390
Okay, I don't have housing company.

00:28:45.390 --> 00:28:49.530
I'll also have some questions for that one.

00:28:49.530 --> 00:28:51.530
That's alright. That's okay.

00:28:51.530 --> 00:28:53.530
Uh, Shoshan Paul's grading.

00:28:53.530 --> 00:29:15.630
Women's center feasibility study.

00:29:15.630 --> 00:29:30.200
And a diagramming fellowship hall.

00:29:30.200 --> 00:29:47.660
Jay Stadium.

00:29:47.660 --> 00:29:49.680
Okay.

00:29:49.680 --> 00:30:03.670
We received today from South Central Community Action for the House.

00:30:03.670 --> 00:30:07.270
Yes, thanks first.

00:30:07.270 --> 00:30:31.200
All of the staff work that was done with those two offices evening.

00:30:31.200 --> 00:31:12.050
But so staff is here to help, but congratulations to Brianna, to Amy, and the second thing I would add

00:31:12.050 --> 00:31:59.080
Will does not already reach consensus, remove those from make a decision and then draw a series of motions

00:31:59.080 --> 00:32:17.750
That was my thought is to maybe chose not to have any further discussion

00:32:17.750 --> 00:32:18.750
Because we did you

00:32:18.750 --> 00:32:19.750
I'll make a motion

00:32:19.750 --> 00:32:20.750
I'll go ahead you guys

00:32:20.750 --> 00:32:43.520
Three motions are just crime scene, three, fellowship, hall

00:32:43.520 --> 00:32:47.090
Five thousand six hundred fifty one dollars

00:32:47.090 --> 00:32:54.300
for sidewalk, for sidewalk on J.J. Stadium.

00:32:54.300 --> 00:32:55.300
Alex Kaval.

00:32:55.300 --> 00:32:56.300
I second that motion.

00:32:56.300 --> 00:32:57.300
Thank you.

00:32:57.300 --> 00:32:58.300
Motion by Christopher Reed.

00:32:58.300 --> 00:33:06.590
Second by Alex Kaval to approve the three items as listed.

00:33:06.590 --> 00:33:10.590
Just one point of clarification down below on your second.

00:33:10.590 --> 00:33:16.590
Your B items, you've now got a negative where the J stadium was that because the feasibility

00:33:16.590 --> 00:33:20.590
study dollar amount dropped, which increased the site.

00:33:20.590 --> 00:33:24.590
It was somewhat immaterial amounts, so I just left it there.

00:33:24.590 --> 00:33:28.590
That's fine. I just wanted to be clear. Okay. Excellent.

00:33:28.590 --> 00:33:33.870
Any discussion on that? Motion. Thank you. Amy Roll, call vote please.

00:33:33.870 --> 00:33:49.870
Yes. Thank you. Motion passes 7-0.

00:33:49.870 --> 00:33:53.870
Okay, so let's, we might as well start at the top.

00:33:53.870 --> 00:33:57.870
The first item is the VISTA vanita.

00:33:57.870 --> 00:34:04.050
Those individuals that might be here for those items may be excused.

00:34:04.050 --> 00:34:10.050
Yes, I think some of them already left, so absolutely you don't have to state.

00:34:10.050 --> 00:34:15.230
I thought that was just assumed.

00:34:15.230 --> 00:34:18.230
Sorry about that, you know what assumed us.

00:34:18.230 --> 00:34:25.230
Okay, so first item is the VISTA BANITA Park allocation for $2 million.

00:34:25.230 --> 00:34:30.880
Wendy, I would expect you probably will need to come down.

00:34:30.880 --> 00:34:59.020
you want to do for all presentation and then we'll open it up for questions.

00:34:59.020 --> 00:35:11.370
So this is trying to take advantage of an opportunity with that property adjacent to the fire station.

00:35:11.370 --> 00:35:23.900
We didn't have a lot of time, so we came up with a relief concept and tried to put some numbers to it that we thought was reasonable.

00:35:23.900 --> 00:35:30.140
We feel like creating a space on the south side of town that brings some amenities

00:35:30.140 --> 00:35:36.860
to the south side of town that don't currently exist, to create some opportunities for the residents

00:35:36.860 --> 00:35:39.500
in this part of town.

00:35:39.500 --> 00:35:45.780
And so we suggested some things like an amphitheater, a splash pad, connecting the walking path that goes around

00:35:45.780 --> 00:35:47.540
the Cipanita Park.

00:35:47.540 --> 00:35:56.210
We talked about a food forest, which would be an orchard kind of space where within the

00:35:56.210 --> 00:36:04.380
park it's providing food opportunities, business equipment that would kind of combine a request

00:36:04.380 --> 00:36:19.340
that we got from a different individual, and who also had asked for funding to put some

00:36:19.340 --> 00:36:26.970
of that equipment at City Park so we convinced him to move it over to Vista

00:36:26.970 --> 00:36:34.050
Benita and included some spaces for that as well and so when we ran our best

00:36:34.050 --> 00:36:37.850
estimate on this that's where the two million dollars comes from and that

00:36:37.850 --> 00:36:53.180
includes the road parking lot splash pad get activity help raise your hand

00:36:53.180 --> 00:37:03.470
I was always in the back of the class or the front of the class, so you just mentioned

00:37:03.470 --> 00:37:04.470
Road Windy.

00:37:04.470 --> 00:37:09.190
I didn't, was there, was the road coming off of Washington?

00:37:09.190 --> 00:37:10.190
I guess I didn't see the map.

00:37:10.190 --> 00:37:21.140
So this is not really a road road, it's just an access into the park and if you back to

00:37:21.140 --> 00:37:48.660
the, so it's not, this isn't the best picture of it, but yeah, it's part of the, this, it

00:37:48.660 --> 00:37:53.540
would be to give this park access off of Washington.

00:37:53.540 --> 00:37:56.220
And so it's not really a road, but it's just an access

00:37:56.220 --> 00:37:58.780
that would come in and connect the two parking lots.

00:37:58.780 --> 00:38:01.460
So right now the only way to get into this park

00:38:01.460 --> 00:38:03.100
is through the neighborhood.

00:38:03.100 --> 00:38:05.740
And this would provide access off of Washington.

00:38:05.740 --> 00:38:11.060
So when I said road, I just meant like asphalt

00:38:11.060 --> 00:38:13.740
strip with some parking that would come through.

00:38:13.740 --> 00:38:17.180
So like little bit like what's on Fillmore

00:38:17.180 --> 00:38:21.240
were up front of your field like that kind of a...

00:38:21.240 --> 00:38:22.400
Yes, probably.

00:38:22.400 --> 00:38:26.780
Yeah, I think we didn't want to just pull it

00:38:26.780 --> 00:38:27.980
and just have a big parking lot,

00:38:27.980 --> 00:38:47.430
but create that connection to that existing parking lot.

00:38:47.430 --> 00:38:53.970
Which, the previous, so the sidewalk and irrigation

00:38:54.250 --> 00:38:58.250
is what Mandy asked for in that other request.

00:38:58.250 --> 00:38:59.170
I don't want to go.

00:38:59.170 --> 00:39:02.060
Yeah.

00:39:02.060 --> 00:39:05.580
And as far as I don't know about what other infrastructure

00:39:05.580 --> 00:39:41.960
improvements would be necessary, because the two million includes full design and construction

00:39:41.960 --> 00:39:49.960
plan. So we anticipated that as part of the dollars we're asking for so that we can get

00:39:49.960 --> 00:39:53.820
a complete design with.

00:39:53.820 --> 00:40:00.820
So Travis, just for a point of clarification, if this two million dollars was not spent on

00:40:00.820 --> 00:40:10.100
particular project. What's the process as it relates to the SLF-F funds? We're not.

00:40:10.100 --> 00:40:14.640
We can use them for other items, correct?

00:40:14.640 --> 00:40:55.700
Listen, they said these processes that should projects not be that there's a list of categories that also the possibility

00:40:55.700 --> 00:42:37.540
was said. I don't see that which we already have here downtown and the rest is we're spending a lot

00:42:37.540 --> 00:43:08.110
a lot of quests into this project.

00:43:08.110 --> 00:43:09.790
It's based requirements for the Rec Center,

00:43:09.790 --> 00:43:13.550
parking lot is about 13 to 15 acres.

00:43:13.550 --> 00:43:16.910
So this area is significantly smaller

00:43:16.910 --> 00:43:19.760
than anything we had looked at.

00:43:19.760 --> 00:43:24.520
Maybe if we could eliminate the fire station, the park,

00:43:24.520 --> 00:43:26.980
and all that, maybe we could make it work.

00:43:26.980 --> 00:43:29.060
I don't know what that looks like.

00:43:29.060 --> 00:43:31.220
I think that there could be a conversation,

00:43:31.220 --> 00:43:34.180
but the committee was very,

00:43:34.180 --> 00:43:50.560
They were looking at the first meeting they called me in and wanted me to respond to walking

00:43:50.560 --> 00:43:56.740
trail options as well as the recreation center as to things that might need to be considered.

00:43:56.740 --> 00:44:02.620
And the concern with the rec center project was that the 8 million was not enough to do

00:44:02.620 --> 00:44:08.560
much of anything and so it didn't seem like it was a good use of the money.

00:44:08.560 --> 00:44:12.960
And I was prioritizing projects that I wanted to bring forward to this committee.

00:44:12.960 --> 00:44:21.080
I was really trying to look for some things that were more, so when we talk about capital

00:44:21.080 --> 00:44:24.720
improvement projects, the city has about two and a half million dollars that we can

00:44:24.720 --> 00:44:27.800
allocate for capital improvement projects.

00:44:27.800 --> 00:44:41.690
And that gets divided up within the, I was looking for projects that would be difficult

00:44:41.690 --> 00:44:45.690
to accomplish otherwise, or would take a long time to get there.

00:44:45.690 --> 00:44:48.130
Social Falls Great Road, developing this park.

00:44:48.130 --> 00:44:49.970
And so we tried to find a couple of projects

00:44:49.970 --> 00:44:53.370
that we could do, start to finish, complete,

00:44:53.370 --> 00:44:58.090
and have a complete project with the dollars,

00:44:58.090 --> 00:45:02.450
and not get stuck in something that was going to take time to do.

00:45:02.450 --> 00:45:05.370
And because this property was available,

00:45:05.370 --> 00:45:07.610
that's kind of why this one was put there.

00:45:07.610 --> 00:45:11.130
And that's why we didn't talk about the rec center at the time.

00:45:11.130 --> 00:45:31.610
Clearly, we're going back to the drawing board. We're going to sit down and talk about what some options might be, and when you break out of the box and just start looking, who knows what could happen, but at the time, this wasn't something we were thinking about other than the fact that the property is too small.

00:45:31.610 --> 00:45:36.730
Other questions for me at this point in time on this particular project.

00:45:36.730 --> 00:45:43.360
Do you have any comments at all?

00:45:43.360 --> 00:45:52.220
This goes quite a bit in the group.

00:45:52.220 --> 00:46:01.980
This was in a under-deserved community discussion with this.

00:46:01.980 --> 00:46:08.310
The park is something that levels up hard.

00:46:08.310 --> 00:46:09.910
There's a residential neighborhood park.

00:46:09.910 --> 00:46:11.550
There's a community park.

00:46:11.550 --> 00:46:13.630
There's different levels.

00:46:13.630 --> 00:46:15.830
And then this would be a park that people

00:46:15.830 --> 00:46:18.310
would drive from all areas across town

00:46:18.310 --> 00:46:20.350
to come to, similar to the first federal park.

00:46:20.350 --> 00:46:22.630
So those were a couple of things I remember

00:46:22.630 --> 00:46:40.470
from the discussions on this that were just.

00:46:40.470 --> 00:46:44.190
You do have a second.

00:46:44.190 --> 00:46:51.770
motion by Chris Reed, seconded by Craig Hawkins to approve allocation of $2 million for this

00:46:51.770 --> 00:47:40.680
step and need of our discussion. That's okay. Other discussion? Questions?

00:47:40.680 --> 00:48:27.000
Hey, Amy Rolkow, please. Yes. Motion passes 4 to 3. Thank you for thinking that through.

00:48:27.000 --> 00:48:43.000
next is the Idaho Housing Company and the amount is $1,728,460. Jason, you had some questions you'd like to ask.

00:48:43.000 --> 00:48:56.630
We'll do the same thing. We're just making sure I don't. Yes. Don't ask it. Yeah. Yep.

00:48:56.630 --> 00:50:22.860
My name is Erin Anderson. I think for your time information about falls of our proposed project. What's showing on that is affordable housing, which means

00:50:24.020 --> 00:50:39.500
housing is serving folks at 60% of the area median income and the person of the person household is $43,680 to give you an idea.

00:50:39.500 --> 00:50:48.620
We're proposing a mix of one, two, and three bedroom units that'll serve different household

00:50:48.620 --> 00:50:55.630
make-ups from individuals to seniors to also a lot of families with the three bedroom units.

00:50:55.630 --> 00:51:08.210
It's a strong history of falls in the last few years, as you know, housing affordability

00:51:08.210 --> 00:51:21.800
has become increasingly, this project is the recipient that was allocated through the

00:51:21.800 --> 00:51:34.090
state for workforce housing. It's the old project in the Falls area, a process that was selected.

00:51:35.370 --> 00:51:43.050
And so we were really excited about that, but due to the fact that costs are still out of reach

00:51:43.050 --> 00:51:52.890
at the rent levels that we're proposing, which loading utilities are somewhere between $700 and

00:51:52.890 --> 00:52:02.310
$1,100, depending on the type of unit, we still had a funding gap of $1.7 million that we've

00:52:02.310 --> 00:52:06.290
requested.

00:52:06.290 --> 00:52:18.410
We're asking for your consideration as we look to the future of the community, a place

00:52:18.410 --> 00:52:25.300
to live that stretch their budget past their means.

00:52:25.300 --> 00:52:27.700
These developments are rather complicated.

00:52:27.700 --> 00:52:30.220
We manage our own properties.

00:52:30.220 --> 00:52:36.640
We have on-site property management that's through our company.

00:52:36.640 --> 00:52:52.500
We also own, it's really one of the biggest things that's important to understand is we own these developments in the long term, the business of building something, and then selling it so that somebody else, you know, purchase it from us to make money.

00:52:52.500 --> 00:52:54.500
We're not profit organization.

00:52:54.500 --> 00:52:56.500
And we're in it for the long haul.

00:52:56.500 --> 00:53:02.980
We really appreciate that.

00:53:02.980 --> 00:53:10.300
for this approval, it really emphasizes the community's commitment to

00:53:10.300 --> 00:53:23.870
communities for all folks and so you could bring up that budget page that's

00:53:23.870 --> 00:53:28.510
an interesting part of the which everybody should have that in this green

00:53:28.510 --> 00:53:36.370
that shows where the funding is coming from that was the question that I have

00:53:36.370 --> 00:53:43.470
been asked so yep so it's about eight percent is we're requesting of the total

00:53:43.470 --> 00:53:50.470
funding sources. Do you want me to walk through each source? I would appreciate it. I guess

00:53:50.470 --> 00:54:02.580
if you just kind of let it know, because that's some of the root of the one that makes it

00:54:02.580 --> 00:54:11.820
better. Yeah, so those are the state ARPA funding. There was $50 million allocated statewide

00:54:11.820 --> 00:54:17.460
for workforce housing, and there was a competitive application process for that funding resource.

00:54:17.460 --> 00:54:23.940
one that's listed, well there's two sources there, the $1 million and the $2.5 million

00:54:23.940 --> 00:54:30.360
both came from that source. The source at the top that's $5.4 million that is

00:54:30.360 --> 00:54:37.620
just a conventional, it's a tax exempt bond with essentially conventional debt

00:54:37.620 --> 00:54:44.130
though fully amortizing loan with debt service. The next one is the tax credit

00:54:44.130 --> 00:54:50.930
equity, which is funded through an IRS program that allows an investors, this is a private

00:54:50.930 --> 00:54:56.370
public partnership where the private entity comes in and invests in the tax credits for

00:54:56.370 --> 00:55:02.730
ten years, and then provides us equity upfront that allows us to keep the rents lower.

00:55:02.730 --> 00:55:09.450
The third source is a grant from IHFA to help us provide 15 units of permanent supportive

00:55:09.450 --> 00:55:11.410
housing.

00:55:11.410 --> 00:55:13.550
The fourth is what I described earlier,

00:55:13.550 --> 00:55:19.010
the state workforce housing through the federal recovery

00:55:19.010 --> 00:55:19.690
money.

00:55:19.690 --> 00:55:24.990
Fifth is a federal longstanding affordable housing

00:55:24.990 --> 00:55:30.990
program called Home, which offers support for units.

00:55:30.990 --> 00:55:38.620
We have some units that are a little bit lower, 50% AMI,

00:55:38.620 --> 00:55:47.060
and it helps us bring it to that level.

00:55:47.060 --> 00:55:50.540
So as I already mentioned, the 2.5 is another workforce housing.

00:55:50.540 --> 00:55:55.240
And then the S, all FRF that we're here to talk about today, 1.728.

00:55:55.240 --> 00:56:15.100
So I guess where I'm coming from and some of the individuals that have reached out to me, particularly on this one, is we, in the city, we continue to say, I'm going to need to pay for itself.

00:56:15.100 --> 00:56:39.710
I know, is there no way those sources to say, hey, look, costs are rejected or...

00:56:39.710 --> 00:56:48.060
So on the states we're first housing,

00:56:48.060 --> 00:56:51.820
there's a maximum amount that you can ask for per project

00:56:51.820 --> 00:56:59.630
and the scoring matrix that also packs the amount

00:56:59.630 --> 00:57:01.590
that you can request.

00:57:01.590 --> 00:57:04.630
And so I believe we've maxed out that source

00:57:04.630 --> 00:57:09.590
on the home funds, essentially for every dollar

00:57:09.590 --> 00:57:13.230
of home funds that we receive or reducing the rent

00:57:13.230 --> 00:57:15.270
almost exactly the same amount.

00:57:15.270 --> 00:57:17.630
And it kind of ends up being awash.

00:57:17.630 --> 00:57:25.020
Because the permanent loan would have to decrease, we can't get an additional permanent financing.

00:57:25.020 --> 00:57:37.140
Less interest rates go down, so that's this grant, full that we could get more of that.

00:57:37.140 --> 00:57:46.140
I guess that's one I could look at, but I know for certain we wouldn't be able to get 1.7 million to the most they've ever given away to a single project.

00:57:46.140 --> 00:57:55.200
on the tax credit equity, that's based on the project cost.

00:57:55.200 --> 00:57:58.700
So on that one, that is somewhat variable

00:57:58.700 --> 00:58:00.700
because these are 4% tax credits,

00:58:00.700 --> 00:58:05.700
which means that the amount floats based on the costs,

00:58:05.940 --> 00:58:09.750
but it doesn't cover all of the costs of the project.

00:58:09.750 --> 00:58:12.750
If costs go up, the tax credit equity goes up

00:58:12.750 --> 00:58:18.440
and it'll cover either costs of that construction.

00:58:18.440 --> 00:58:20.920
It's only towards eligible costs,

00:58:20.920 --> 00:58:24.240
which is mostly just the construction costs architecture.

00:58:24.240 --> 00:58:26.240
certain costs, they're not eligible.

00:58:26.240 --> 00:58:32.780
And so this 1.7 million is there a specific area of the project?

00:58:32.780 --> 00:59:04.930
Our engineer put together an estimate of costs for the public improvements involved in this project.

00:59:04.930 --> 00:59:12.930
So the road that we're improving is Hankins, and then Kimberly is also,

00:59:12.930 --> 00:59:16.930
while we're not really widening it, we are improving it.

00:59:16.930 --> 00:59:26.500
So, the Hankins Road Improvement is estimated around 246,000 during

00:59:26.500 --> 00:59:42.690
engineering, irrigation, or thousand, scaping, and things like that. That's about 345,000.

00:59:42.690 --> 00:59:52.990
So, the grand total of those is 675. Hankins is a pretty substantial project. There is

00:59:52.990 --> 01:00:05.480
a new water line going in there of the really nice landscaping and also pretty

01:00:05.480 --> 01:00:29.140
what for an attractive on this funding source have they been secured or are you

01:00:29.140 --> 01:01:01.570
waiting on it?

01:01:01.570 --> 01:01:06.530
But he also have any other questions?

01:01:06.530 --> 01:01:13.740
Chris Reed?

01:01:13.740 --> 01:01:21.200
Ons 728,728,460 dollars.

01:01:21.200 --> 01:01:23.200
Thank you, Alex Koval.

01:01:23.200 --> 01:01:25.200
Second the motion.

01:01:25.200 --> 01:01:30.560
Thank you, Emotion by Christopher Reed, second by Alex Koval to approve the

01:01:30.560 --> 01:01:42.300
funding for the housing project of 1.728460. Any further discussion? Amy Rokovo please?

01:01:42.300 --> 01:02:09.640
Yes. Yes. Thank you. Motion passes 7 to 0. Thank you. Okay. The next item is the

01:02:09.640 --> 01:02:19.460
Shoshone Falls grading. No, Chris had some questions for $2,895,000. Welcome Troy.

01:02:19.460 --> 01:02:51.930
is a project that starts, you guys can see this on the screen in front of you, this is the game, our shush on falls for the stars out there.

01:02:51.930 --> 01:06:16.270
Chris 3, it's awesome to you.

01:06:16.270 --> 01:07:44.030
I'm just looking at the pictures, that's what it looks like, but I think to me, I'd be in favor of most of the road damages from the watersline section almost entirely this area.

01:07:44.030 --> 01:07:59.900
Through this you think this is a highly traveled area, I think it's...

01:07:59.900 --> 01:08:24.630
That later, come on, Jason. Thank you, Spencer Coler.

01:08:24.630 --> 01:08:32.720
All the good humor I can express. I'd like to move that we'd name this knob in honor of the House of the Crown.

01:08:32.720 --> 01:08:34.170
I know.

01:08:34.170 --> 01:08:44.170
These are the text of projects. Eventually, we're going to have to use text per minute to take care of.

01:08:44.170 --> 01:08:47.170
These are the types of things I actually wanted to see more of in the list.

01:08:47.170 --> 01:08:51.170
But like I said, I supported the list as a whole because of the work of the community.

01:08:51.170 --> 01:10:25.160
and Christine as we have some parts to this that has been said, it is such a jewel we have.

01:10:25.160 --> 01:10:32.420
Especially because this amount we don't even know how exact it is now given when you put it together.

01:10:32.420 --> 01:10:41.740
Yeah, it's MIDI overall had the same sentiment, which was it's a jewel.

01:10:41.740 --> 01:10:51.750
It's a destination and a lot of our community citizens go utilize the park,

01:10:51.750 --> 01:10:56.420
and so perfect example of what these funds were for.

01:10:56.420 --> 01:10:59.160
So, Jason, are you?

01:10:59.160 --> 01:11:22.730
Move to. I move.

01:11:22.730 --> 01:11:37.170
So the motion has been made by Jason Brown and seconded by Craig Hawkins to approve the $2,895,000 allocation to the Shoshone Falls grade.

01:11:37.170 --> 01:11:38.730
Chris Reed, did you have it?

01:11:38.730 --> 01:11:49.810
I just wanted to verify that yes, no matter-

01:11:49.810 --> 01:11:53.370
Any other questions or concerns?

01:11:53.370 --> 01:11:55.410
Amy Roll, call, vote please.

01:11:55.410 --> 01:12:14.130
Yes, thank you. Motion passes 7 to 0. Okay, next is fleet maintenance. I know

01:12:15.130 --> 01:12:17.130
Norm there have been

01:12:17.130 --> 01:12:27.110
Lots of questions, so come on down and if you can enlighten everyone as to what your request is

01:12:27.110 --> 01:12:44.200
Do the presentation initially so basically additional space at the shop?

01:12:44.200 --> 01:13:21.970
Currently being used for storage. It's cold storage is no heat.

01:13:21.970 --> 01:14:04.550
In our up here now is printed a copy of your presentation from me for with pictures.

01:14:04.550 --> 01:14:21.760
Do we happen to have that available kind of step us through what you're talking about on these various?

01:14:21.760 --> 01:14:56.480
Chirrs are just kind of a snapshot of how crowded the shop gets on it on a busy day

01:14:57.740 --> 01:15:27.360
Sometimes in the summertime we get all two inspections and all that fills up this existing work area

01:15:41.470 --> 01:16:52.550
and then storage of us. This is a entry our existing bathroom. We have one of this would actually give us an additional bathroom

01:17:03.630 --> 01:17:32.320
It's a little bit hard. This is actually more than that central receiving area

01:17:43.160 --> 01:18:49.510
but also in that room are chemicals, aerosols, in office.

01:18:49.510 --> 01:19:39.680
The questions was the 1.5 million,

01:19:39.680 --> 01:19:42.680
seemed like a kind of a round number.

01:19:42.680 --> 01:19:49.550
How comfortable are you that that number is solid?

01:19:49.550 --> 01:19:52.550
So that was the architect's estimate that he gave us.

01:19:52.550 --> 01:19:55.500
Okay.

01:19:55.500 --> 01:19:57.500
The last time I was in contact with him was,

01:19:57.500 --> 01:20:47.730
I believe it was in 2020's to do this roughly.

01:20:47.730 --> 01:20:58.190
So we got started into the project, we found out that there was some engineering and architectural work that needed to be,

01:20:58.190 --> 01:21:06.750
that's a design work that we got them and we also got our fire marshal involved and our building inspectors involved.

01:21:06.750 --> 01:21:32.880
And the project was, that's how we ended up doing it.

01:21:32.880 --> 01:21:35.610
Jason Brown.

01:21:35.610 --> 01:21:45.610
I'm trying to figure out spatially so the center part of the building, that's going to get revamped and then the other part is the east part or the west part from the center.

01:21:45.610 --> 01:21:58.440
So are you part of this is is it HVAC for the whole building or just that's

01:21:58.440 --> 01:22:01.560
missing everything else is everything else is already got

01:22:01.560 --> 01:22:34.310
I was that was the secret that was the secret you guys could fix and keep everything running

01:22:34.310 --> 01:23:11.480
so when I look varsity employee I like that's a question so this edition would add about

01:23:11.480 --> 01:23:15.880
3500 square feet of space for you what's your current what current space square

01:23:15.880 --> 01:23:21.320
footage are you operating in?

01:23:21.320 --> 01:23:30.780
So, Bays in the main area of the shop, which is when this building was originally built,

01:23:30.780 --> 01:23:40.970
Jason called the center section, was actually the wastewater department, expanded into their

01:23:40.970 --> 01:23:53.120
storage, their center section, I'm going to call it that we need, if I cated, there's

01:23:53.120 --> 01:24:21.750
the potential for three bays, we're currently on the other questions before.

01:24:21.750 --> 01:24:42.180
Do you have a second?

01:24:42.180 --> 01:24:50.280
Thank you, motion by Nikki Boyd, second by Alex Koval to improve the allocation of

01:24:50.280 --> 01:24:55.280
at $1.5 million for the Fleet Maintenance Project.

01:24:55.280 --> 01:24:58.490
Any further discussion?

01:24:58.490 --> 01:25:00.880
Amy Rokov, please.

01:25:00.880 --> 01:25:14.650
Yes, and thank you.

01:25:14.650 --> 01:25:16.650
Motion passes 7-0.

01:25:16.650 --> 01:25:17.650
Thank you.

01:25:17.650 --> 01:25:19.900
Thank you.

01:25:19.900 --> 01:25:22.480
Norley, lost my list.

01:25:22.480 --> 01:25:23.480
Okay.

01:25:23.480 --> 01:25:31.480
So the next on the agenda, actually, the last item is $125,000 for the Economic Development

01:25:31.480 --> 01:25:37.720
Development Events Center Feasibility Study, and Sean Berger, our Economic Development Director,

01:25:37.720 --> 01:25:40.600
is here to discuss. Welcome, Sean.

01:25:40.600 --> 01:25:45.880
During Council, I noticed that Briana was looking for my amazing presentation that I made,

01:25:45.880 --> 01:26:05.610
I believe, in that week five of the influenza-fancy. And he so pillars his prospers community. So,

01:26:05.610 --> 01:26:12.090
focus area six, having a vision of assisting in ensuring that the community residents have

01:26:12.090 --> 01:26:19.680
access to employment and that supports personal and family. So as I looked at

01:26:19.680 --> 01:26:34.450
this particularly these funds being allocated to help support there's

01:26:34.450 --> 01:26:39.370
hospitality, restaurants, and the jobs that those create and the taxes that they

01:26:39.370 --> 01:26:44.210
generate to support the state certainly took a tremendous hit. So as I looked at

01:26:44.210 --> 01:26:48.650
our strategic plan and some of the initiatives utilizing tourism as a tool

01:26:48.650 --> 01:26:56.510
for economic development, finding ways to look spaces to seek community partners, to hose

01:26:56.510 --> 01:27:03.840
on task other community events, looking at a feasibility study for some sort of space convention

01:27:03.840 --> 01:27:12.320
conference event, multipurpose, seemed a good request to bring forward to this committee.

01:27:12.320 --> 01:27:17.320
As I shared with the committee, I have care, so my previous employment at the chamber, this

01:27:17.320 --> 01:27:27.110
This is the last comprehensive study of a convention center for the City of Twin Falls.

01:27:27.110 --> 01:27:30.960
So that's years old.

01:27:30.960 --> 01:27:32.960
And at that time it said we needed a convention center.

01:27:32.960 --> 01:27:33.960
And we still have.

01:27:33.960 --> 01:27:39.970
Originally I had requested $200,000.

01:27:39.970 --> 01:27:45.970
Again, I was in week five of employment, reaching out to some consultants who have done this type of work.

01:27:45.970 --> 01:27:48.970
We chopped that number back to about $125,000.

01:27:48.970 --> 01:27:55.910
I do we can still seek community partners and perhaps that final funding could even be less than that

01:27:55.910 --> 01:28:03.040
But in order to enhance its needs of type of facility

01:28:09.160 --> 01:28:17.260
Funded those types of things fine in the consultants who provide information to have sort of a ready-made

01:28:19.400 --> 01:28:23.240
Partnership and when I say public private that doesn't necessarily mean the city

01:28:23.800 --> 01:28:40.040
checks

01:28:40.040 --> 01:28:45.760
and consultant.

01:28:45.760 --> 01:28:59.880
Greg, you were the one.

01:28:59.880 --> 01:29:07.760
I should know in chambers of the night of tourism.

01:29:07.760 --> 01:29:25.360
Chris Reed, Alex, I think has a couple of questions.

01:29:25.360 --> 01:29:31.360
On this one, if you do a feasibility study,

01:29:31.360 --> 01:29:33.360
is it going to be similar to the Rec Center one

01:29:33.360 --> 01:29:35.360
where you need to find a location first before you can?

01:29:35.360 --> 01:29:46.920
Oh, so certainly we had a lot of things developed over the last,

01:29:46.920 --> 01:29:49.920
since November 14th, when I originally presented this.

01:29:49.920 --> 01:29:54.720
So Wendy and I have actually visited, I understand that the presentation

01:29:54.720 --> 01:30:23.090
of that its current vision includes some convention center, or certainly study that was mentioned center did not necessarily require a location.

01:30:23.090 --> 01:30:31.000
So we'll say if it's located downtown, we'll see if it's located.

01:30:31.000 --> 01:31:22.510
So if you consider a few, so the study may say something, or it may say tells that it'll be, so it'll be, that says, build it in this location.

01:31:22.510 --> 01:31:30.550
So, yes, the current master planning process is going on for downtown, which you all received

01:31:30.550 --> 01:31:45.090
the eligibility report to district, is in some sort of destination.

01:31:45.090 --> 01:31:47.790
And so I do any facility like this.

01:31:47.790 --> 01:31:52.670
It's that vision, whether that's exactly what goes or not.

01:31:52.670 --> 01:31:59.940
But I believe it would help as the agency moves forward with the district, with the city's

01:31:59.940 --> 01:32:42.800
The Council's creation of the next several months and sunsets, big gives us yet another tool towards trying to cultivate a couple of other questions for Sean.

01:32:42.800 --> 01:32:44.660
Chris Reed?

01:32:44.660 --> 01:32:55.620
Then to Center Feasibility Study.

01:32:55.620 --> 01:33:10.280
Can you motion by Chris for a read, second by Nicky Boyd, to approve the allocation of 125,000 or the Economic Development Events Center Feasibility Study?

01:33:10.280 --> 01:33:12.280
Any further discussion?

01:33:12.280 --> 01:33:14.280
Amy Roll-call-vote please.

01:33:14.280 --> 01:33:15.980
Jason Brown?

01:33:15.980 --> 01:33:34.810
Yes, motion passes seven to zero. Thank you, Rhianna. Do you have anything you want to wrap up?

01:33:51.520 --> 01:34:27.120
Several left.

01:34:27.120 --> 01:34:30.400
Thank you, and thank you, Rhianna.

01:34:30.400 --> 01:34:37.750
Okay, that's all under items of consideration. Next is time for public input.

01:34:37.750 --> 01:34:45.750
There's anybody in the public that wishes to address City Council on an item not on today's agenda.

01:34:45.750 --> 01:35:00.050
open mic time. Okay, see no one advisory board reports. Advisory board. City

01:35:00.050 --> 01:35:06.970
manager's office. Hey, we have no public hearing. So the meeting is adjourned.

01:35:06.970 --> 01:35:09.890
Thank you everyone.