WEBVTT

00:02:29.520 --> 00:02:38.760
Good evening ladies and gentlemen and welcome to the December 16th, 2024 City Council meeting. I want to confirm we have a quorum. We have all

00:02:39.400 --> 00:02:47.100
Seven first present in chambers tonight first item on the agenda is the Pledge of Allegiance if you wish to join me please rise

00:02:47.100 --> 00:03:03.350
I pledge allegiance to the Flag of the United States of America, and to the Republic for which it stands, one Nation under God, indivisible, with liberty and justice for all.

00:03:03.350 --> 00:03:14.730
Okay, we have no proclamations tonight, so first, next on the agenda is the consent calendar.

00:03:14.730 --> 00:03:16.730
Council wishes, Craig Hawkins.

00:03:16.730 --> 00:03:25.340
Here I'd like to approve the, uh, minutes from the last count, approve the consent calendar is written as a long crime say.

00:03:25.340 --> 00:03:26.340
Thank you. Is there a second?

00:03:26.340 --> 00:03:27.340
I'll second.

00:03:27.340 --> 00:03:32.460
Thank you motion by Craig Hawkins second by Chris Reed to approve a proof that

00:03:32.460 --> 00:03:48.570
consent calendar as written Rachel Rokal vote please. Yes yes. Thank you motion

00:03:48.570 --> 00:03:54.090
passes seven to zero. Okay first item under items of consideration is an

00:03:54.090 --> 00:04:00.010
action item are requests to award the Hankins pump station to construction

00:04:00.010 --> 00:04:09.570
contract to IMCO general construction in the amount of $8,074,000 with conditions

00:04:09.570 --> 00:04:13.090
and we have staff engineer Lee Gleisman. Welcome Lee.

00:04:13.090 --> 00:04:19.920
Four model filled out incorrectly. I'm an assistant city engineer now. Oh sorry.

00:04:19.920 --> 00:04:25.720
Yeah, on November 21st, bids were received for the construction of a new Hankets pump

00:04:25.720 --> 00:04:31.400
station number two. Below bid in the amount of $8,074,000 was received from Mco-General

00:04:31.400 --> 00:04:36.080
Construction at Ferndale, Washington. Staff was recommending to award the contract to Mco-General

00:04:36.080 --> 00:04:40.360
Construction with conditions. I don't know if you had a chance to look at the bit tab,

00:04:40.360 --> 00:04:45.720
but number two was very close on a project of this size. It was really good to see a

00:04:45.720 --> 00:04:48.960
a lot of bidders and CM's closest they were together.

00:04:48.960 --> 00:04:52.080
So currently there is a single water pumping station

00:04:52.080 --> 00:04:53.760
on Hankins Road near Kimberly Road,

00:04:53.760 --> 00:04:55.960
which we've called the Hankins pump station

00:04:55.960 --> 00:04:57.960
were not real creative I guess.

00:04:57.960 --> 00:04:59.280
This pump station supplies water

00:04:59.280 --> 00:05:00.920
to the Hankins pressure zone,

00:05:00.920 --> 00:05:03.000
which was recently split into two pressure zones,

00:05:03.000 --> 00:05:04.700
the Hankins pressure zone north

00:05:04.700 --> 00:05:06.600
and Hankins pressure zone south.

00:05:06.600 --> 00:05:08.520
Currently the existing station supplies water

00:05:08.520 --> 00:05:10.520
to both pressure zones.

00:05:10.520 --> 00:05:12.840
Based on the estimated growth within these pressure zones,

00:05:12.840 --> 00:05:14.720
the most recent water master plant projected

00:05:14.720 --> 00:05:17.480
that the existing pump station has enough capacity

00:05:17.480 --> 00:05:19.760
for at least another 10 years before a new pump station

00:05:19.760 --> 00:05:21.360
would be needed for the area.

00:05:21.360 --> 00:05:23.560
When built, the new pump, Hankah's pump station,

00:05:23.560 --> 00:05:25.320
would be able to supply water to one of the two

00:05:25.320 --> 00:05:28.080
new pressure zones and the existing Hankah's pressure zone,

00:05:28.080 --> 00:05:31.000
or Hankah's pump station would be able to supply water

00:05:31.000 --> 00:05:32.500
to the other.

00:05:32.500 --> 00:05:35.160
In late 2022, Chobani approached the city

00:05:35.160 --> 00:05:37.120
with a request for an additional one million gallons

00:05:37.120 --> 00:05:39.260
of water a day to support expanded production

00:05:39.260 --> 00:05:40.440
at their plant.

00:05:40.440 --> 00:05:42.560
Since the existing pump station cannot support

00:05:42.560 --> 00:05:44.040
the requested water demand,

00:05:44.040 --> 00:05:47.040
The city had no plans to build a new station for many years.

00:05:47.040 --> 00:05:49.240
Chobani and the city came to an agreement.

00:05:49.240 --> 00:05:51.600
Among other conditions needed to support their proposed growth,

00:05:51.600 --> 00:05:55.400
Chobani agreed to fund the construction of the new Hankas pump station

00:05:55.400 --> 00:05:56.880
to provide their needed water supply,

00:05:56.880 --> 00:06:00.240
and the city agreed to fund three additional pumps in the station.

00:06:00.240 --> 00:06:02.640
By adding three pumps to the new station, the new station would be able

00:06:02.640 --> 00:06:05.320
to provide dedicated water to one pressure zone,

00:06:05.320 --> 00:06:07.920
and the existing pump station would be able to provide dedicated water

00:06:07.920 --> 00:06:09.360
to the other pressure zone.

00:06:09.360 --> 00:06:11.920
By using two pump stations instead of one,

00:06:11.920 --> 00:06:17.920
Water can be supplied to the two pressure zones more efficiently, which will decrease energy cost to the city compared to a single station.

00:06:17.920 --> 00:06:26.210
As a condition of the agreement, the city agreed to not execute the construction contract for the station until Chobani provided full payment for their portion of the work.

00:06:26.210 --> 00:06:31.210
The city has already received most of the funding from Chobani as weighting a final amount.

00:06:31.210 --> 00:06:36.210
I had expected something like that maybe even before this meeting hasn't come in yet, but it's on its way.

00:06:36.210 --> 00:06:41.010
If council awards the contract, the award will need to be conditioned on receiving the

00:06:41.010 --> 00:06:43.770
full Chobani payment first.

00:06:43.770 --> 00:06:48.690
To fund the three pumps, the city agreed to pay for 1.2 million was included in the current

00:06:48.690 --> 00:06:49.690
city budget.

00:06:49.690 --> 00:06:56.610
However, the bid cost for the three pumps came to 1.425 million to cover the additional cost

00:06:56.610 --> 00:07:00.930
plus the contingency staff is requesting $300,000 from Water Reserves.

00:07:00.930 --> 00:07:03.650
Water Reserves has sufficient funds to cover this request.

00:07:03.650 --> 00:07:10.490
If council awards the contract the word will need to be conditioned on allowing the use of 300,000 from water reserves and so

00:07:11.170 --> 00:07:12.650
conclusion

00:07:12.650 --> 00:07:20.130
Recommend that council award the hankas pump station number two construction contract in co-general construction in the amount of eight million 74,000

00:07:21.050 --> 00:07:27.610
With the following conditions the ward is contingent on receiving payment friendship body to cover the construction amount and 300,000

00:07:27.610 --> 00:07:29.610
Water reserves to be used for the city's portion of construction

00:07:29.610 --> 00:07:41.420
Any questions for Lee for Jason Brown, I'll go ahead and make a motion.

00:07:41.420 --> 00:07:42.420
Thank you.

00:07:42.420 --> 00:07:48.420
I would move to award the Hankins pump station number two construction contract to M code

00:07:48.420 --> 00:07:52.670
general construction in the amount of 8,074,000.

00:07:52.670 --> 00:07:53.670
Is that right?

00:07:53.670 --> 00:07:54.670
Yeah.

00:07:54.670 --> 00:08:01.670
I just wanted to make sure with the following conditions, the award is contingent on receiving

00:08:01.670 --> 00:08:09.840
payment from Jibani to cover their construction amount and 300,000 water reserves.

00:08:09.840 --> 00:08:10.840
Thank you.

00:08:10.840 --> 00:08:11.840
Grace and Stone.

00:08:11.840 --> 00:08:12.840
Thank you, Madam Mayor.

00:08:12.840 --> 00:08:13.840
I will second.

00:08:13.840 --> 00:08:14.840
Thank you.

00:08:14.840 --> 00:08:20.280
Motion by Jason Brown, seconded by Grace and Stone to award the Hankins pump station number

00:08:20.280 --> 00:08:27.000
two construction contract to MCO, General Construction, and the amount of $8,074,000

00:08:27.000 --> 00:08:30.410
with the conditions listed.

00:08:30.410 --> 00:08:33.200
Any further discussion?

00:08:33.200 --> 00:08:36.370
Rachel Rocha-Rocha-Rocha, please.

00:08:36.370 --> 00:08:37.210
Yes.

00:08:37.210 --> 00:08:38.890
Brace and Stone.

00:08:38.890 --> 00:08:39.730
Yes.

00:08:39.730 --> 00:08:40.570
Barry Volmer.

00:08:40.570 --> 00:08:41.410
Yes.

00:08:41.410 --> 00:08:42.250
Jason Brown.

00:08:42.250 --> 00:08:43.090
Yes.

00:08:43.090 --> 00:08:43.930
Great Cockens.

00:08:43.930 --> 00:08:44.930
Yes.

00:08:44.930 --> 00:08:45.930
Chris Reed.

00:08:45.930 --> 00:08:46.930
Yes.

00:08:46.930 --> 00:08:47.930
Yes.

00:08:47.930 --> 00:08:48.930
Thank you.

00:08:48.930 --> 00:08:49.930
Motion passes seven to zero.

00:08:49.930 --> 00:08:51.190
Thank you, Lee.

00:08:51.190 --> 00:08:52.190
Thank you very much.

00:08:52.190 --> 00:08:53.190
Okay.

00:08:53.190 --> 00:08:59.150
Next item is also an action item, a request to approve the purchase of a 2024 Enviro site

00:08:59.150 --> 00:09:07.670
camera van and equipment at the cost of $310,871.44 using a cooperative

00:09:07.670 --> 00:09:11.670
purchasing agreement with Sourcewell and authorized the Public Works

00:09:11.670 --> 00:09:16.510
Director to exit the contract and we have our wastewater superintendent Doug

00:09:16.510 --> 00:09:22.840
Gonzalez welcome Doug. Good evening Mayor, Council. Come to talk about the

00:09:22.840 --> 00:09:29.280
approval to purchase our Enviresight camera. A little background, Idaho code

00:09:29.280 --> 00:09:42.240
with the approval of this governing board, a political subdivision may participate in cooperative

00:09:42.240 --> 00:09:48.760
purchasing agreements with the state of Idaho, other Idaho political subdivisions, other government

00:09:48.760 --> 00:09:52.660
entities or associations thereof.

00:09:52.660 --> 00:09:57.360
Political subdivisions may also participate in cooperative purchasing programs established

00:09:57.360 --> 00:10:01.680
by any association that offers its goods or services

00:10:01.680 --> 00:10:04.840
as a result of competitive solicitation process.

00:10:05.800 --> 00:10:08.760
Goods or services procured by participation

00:10:08.760 --> 00:10:10.720
and says cooperative agreements

00:10:10.720 --> 00:10:15.520
or programs shall be deemed to have been acquired

00:10:15.520 --> 00:10:19.280
in accordance with the requirements of this chapter.

00:10:19.280 --> 00:10:22.080
On December 19th, 2019,

00:10:22.080 --> 00:10:27.000
City Council adopted resolution 2019-014

00:10:27.000 --> 00:10:30.460
authorizing staff to use cooperative purchasing agreements

00:10:30.460 --> 00:10:33.140
and joint cooperative purchasing programs.

00:10:33.140 --> 00:10:35.060
City staff can approve purchases up

00:10:35.060 --> 00:10:37.100
to the informal bid limits.

00:10:37.100 --> 00:10:40.620
The city council must approve the purchase

00:10:40.620 --> 00:10:43.620
if the purchase exceeds the informal bid limit,

00:10:43.620 --> 00:10:46.990
which was increased to 150,000.

00:10:46.990 --> 00:10:50.830
The fleet searing committee recommended this purchase.

00:10:50.830 --> 00:10:54.030
It was later presented to and further recommended

00:10:54.030 --> 00:10:57.110
by the LTP committee and allowed to buy the council

00:10:57.110 --> 00:11:06.170
part of the FY2526 budget. This equipment is essential to the wastewater team in

00:11:06.170 --> 00:11:11.330
maintaining and evaluating through video inspection the sewer collection and

00:11:11.330 --> 00:11:17.730
stormwater systems. Current camera van and chassis are over 20 years old and are

00:11:17.730 --> 00:11:22.850
due to be replaced. There is still value in the equipment so we are reaching out

00:11:22.850 --> 00:11:27.770
to other municipalities to try and see if we can recoup some of the costs on the

00:11:27.770 --> 00:11:35.170
new van. Any existing useful equipment that is compatible with the new van

00:11:35.170 --> 00:11:43.110
will be transferred from the old van to the new one and reused. Approval a simple

00:11:43.110 --> 00:11:49.350
majority vote will approve this request. Also something to note the quote is did

00:11:49.350 --> 00:11:54.390
come in under budget so I will stand for any questions you have for me.

00:11:54.390 --> 00:12:02.390
Chris Reed. Doug, thanks for the presentation. If it's approved tonight, what do you think the turnaround is on something like this?

00:12:02.390 --> 00:12:12.390
So, as soon as we can get the contract signed, working with MetroQuit, this who were working through to get the Enviresite equipment in van,

00:12:12.390 --> 00:12:23.390
they said the turnaround shouldn't be horrible. If we go into January-ish, it could get a little bit longer on the chassis.

00:12:23.390 --> 00:12:35.390
the equipment and everything should be a pretty quick turnaround. We're hoping by early summer, we should be able to see something. I'm hoping, I don't know that for sure.

00:12:35.390 --> 00:12:39.390
So that's going off basically what they were telling us from magic rip.

00:12:39.390 --> 00:12:41.390
But mid next year.

00:12:41.390 --> 00:12:42.390
Yeah.

00:12:42.390 --> 00:12:43.390
Perfect. Thank you.

00:12:43.390 --> 00:12:44.390
Grayson.

00:12:44.390 --> 00:12:45.390
Thank you, Madam Mayor.

00:12:45.390 --> 00:12:51.900
Hey, Doug's just because I'm kind of a nerd and I went through our onboarding process.

00:12:51.900 --> 00:12:54.900
and we learned kind of how the video inspection works.

00:12:54.900 --> 00:12:56.900
Would you mind kind of just talking for anybody listening,

00:12:56.900 --> 00:12:59.900
anybody in the audience on how you utilize those tools?

00:12:59.900 --> 00:13:03.900
Yes, it's actually a great tool for us to use.

00:13:03.900 --> 00:13:06.900
It's probably one of the most important ones we have.

00:13:06.900 --> 00:13:10.900
Being able to have the ability to look at the pipe from the inside,

00:13:10.900 --> 00:13:14.900
not take anything out of service while we do that

00:13:14.900 --> 00:13:17.900
helps us make recommendations, all sorts of things,

00:13:17.900 --> 00:13:20.900
you know, even with backups, how to fix them.

00:13:20.900 --> 00:13:25.900
We can hopefully on the front end be able to find repairs,

00:13:26.900 --> 00:13:29.220
CIP projects, those types of things

00:13:29.220 --> 00:13:31.940
by being able to do video inspection,

00:13:31.940 --> 00:13:33.980
which really helps us with our budgeting

00:13:34.980 --> 00:13:37.620
to see what the health of our system is.

00:13:37.620 --> 00:13:40.020
So it's a very useful tool.

00:13:40.020 --> 00:13:42.980
We can use it for storm water as well.

00:13:42.980 --> 00:13:45.500
So it can help us in the future

00:13:45.500 --> 00:13:47.220
with storm water needs as well.

00:13:47.220 --> 00:13:48.060
So.

00:13:48.060 --> 00:13:49.620
Thank you.

00:13:49.620 --> 00:13:51.060
Thank you, Chris Reed.

00:13:51.060 --> 00:13:57.280
ready to make a motion if we move to approve the purchase of the 2024 Enviro site camera

00:13:57.280 --> 00:14:06.020
van and equipment at the cost of $310,871.44 using a cooperative purchase agreement with

00:14:06.020 --> 00:14:11.980
Sourcewell and authorizing the public works director to execute the contract.

00:14:11.980 --> 00:14:18.540
Thank you, Jason Brown. Thank you. Motion by Chris Reed, seconded by Jason Brown to approve

00:14:18.540 --> 00:14:29.260
the request to purchase the 2024 Enviro site camera van and equipment at a cost of 310,87144,

00:14:29.260 --> 00:14:35.100
using cooperative purchase agreement with Sourcewell and authorized Public Works Director to execute

00:14:35.100 --> 00:14:40.060
the contract. Any further discussion? Rachel Roekov, please.

00:14:40.700 --> 00:14:42.860
Grace and Stone. Yes.

00:14:42.860 --> 00:15:13.690
Yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes, yes

00:15:13.690 --> 00:15:18.690
plus closing costs, and we have our environmental manager, Nathan Erickson, welcome, Nathan.

00:15:18.690 --> 00:15:25.690
Thank you, Mayor, Council. Appreciate your time tonight. Yes, tonight I'm here because

00:15:25.690 --> 00:15:32.690
the City of Twin Falls is unique in that our wastewater treatment plant is down in the canyon,

00:15:32.690 --> 00:15:38.690
and we have three different sewer lines that take the wastewater from the city down to the

00:15:38.690 --> 00:15:44.570
treatment plant. One of these lines is the ground view trunk line that's what we

00:15:44.570 --> 00:15:49.410
call it. That's your line is it comes down Canyon Rim Road and hits the Canyon

00:15:49.410 --> 00:15:55.090
Rim drops off the Canyon Rim and goes down to the plant. We are in the process of

00:15:55.090 --> 00:16:01.330
making some improvements and on that system along the rim and below the rim

00:16:01.330 --> 00:16:06.890
and found that we really need a redundant line in that area and in

00:16:06.890 --> 00:16:12.230
process of doing that we found that currently the line that is coming off of

00:16:12.230 --> 00:16:16.930
the rim is actually not completely on the city's property. It goes on into it in a

00:16:16.930 --> 00:16:24.410
jointing property that's owned by a private owner and we have talked to the

00:16:24.410 --> 00:16:30.650
owners of that property and they have a desire to sell the property it's 37 acres

00:16:30.650 --> 00:16:39.410
It's 37 acres, it's from the canyon rim, and then it goes north to Canyon Springs Road.

00:16:39.410 --> 00:16:46.170
It's a little bit of an awkward shape, but it does cover the area of where the city would

00:16:46.170 --> 00:16:51.170
need to own to put in a redundant line and to actually own the property that our line

00:16:51.170 --> 00:16:52.170
is on.

00:16:52.170 --> 00:16:58.930
So the price for that property we've negotiated with the owners is $200,000.

00:16:58.930 --> 00:17:06.410
costs are approximately 2000. We're going to split the cost with the seller, so it'll

00:17:06.410 --> 00:17:14.510
be 200,000 plus closing costs. I guess if there's any questions at this point.

00:17:14.510 --> 00:17:32.380
Why don't we pull up the map and that way we can... Are we looking at the same thing?

00:17:32.380 --> 00:18:07.810
It's in the packet. It is in the packet. It's attachment. We all have it. I was just going

00:18:07.810 --> 00:18:23.280
show it to the audience yes it is a little bit of an odd shape but the I guess the

00:18:23.280 --> 00:18:28.400
southwest portion of it does follow along like I said the canyon rim and then it

00:18:28.400 --> 00:18:38.670
does join the property that is currently the wastewater treatment plant what is

00:18:38.670 --> 00:18:44.350
the little train who owns that property so there is a triangle that is owned by

00:18:44.350 --> 00:18:49.550
the golf course. Okay, so they own up from the golf course

00:18:49.550 --> 00:19:00.510
across the road, yes. Okay. Ask a question. Yes. What we're looking at that. Talk to us a little bit

00:19:00.510 --> 00:19:04.590
about the work that will be done once this is purchased, knowing that we do have some lines. You

00:19:04.590 --> 00:19:12.350
talked about redundancy that's needed. Yeah, so what initiated this process was, so is that line

00:19:12.350 --> 00:19:18.490
comes up so it's a 30 inch HDPE pipe currently and you can imagine that the

00:19:18.490 --> 00:19:22.370
sewer that comes off the canyon rim there's a lot of energy in that flow you

00:19:22.370 --> 00:19:27.970
know it's a big water slide so when it gets to the bottom it hits a box

00:19:27.970 --> 00:19:34.170
but the it's called an energy dissipation box at the bottom before it gets to the

00:19:34.170 --> 00:19:39.850
plant and that energy dissipation box is in need of inspection and you know

00:19:39.850 --> 00:19:45.970
making sure that it's in good condition and in looking at that we realized that

00:19:45.970 --> 00:19:50.250
there was really no way to stop the flow and hence the recommendation from the

00:19:50.250 --> 00:19:55.790
engineering firm that we put in a redundant line it would also give us

00:19:55.790 --> 00:20:18.110
future capacity for that line thank you one time I don't have a power I can

00:20:18.110 --> 00:20:20.430
and print it and hold it up.

00:20:20.430 --> 00:20:23.880
I got a picture of it here.

00:20:23.880 --> 00:20:24.880
There we go.

00:20:24.880 --> 00:20:25.880
It is.

00:20:25.880 --> 00:20:26.880
Fabulous.

00:20:26.880 --> 00:20:29.000
Thank you.

00:20:29.000 --> 00:20:30.000
Trowess.

00:20:30.000 --> 00:20:36.600
So the red is the outline shape of the 37 acres, the blue is the wastewater treatment

00:20:36.600 --> 00:20:37.600
plant.

00:20:37.600 --> 00:20:38.600
Perfect.

00:20:38.600 --> 00:20:41.900
Thank you.

00:20:41.900 --> 00:20:44.500
Nathan, Chris, did you have another question?

00:20:44.500 --> 00:20:45.500
I don't.

00:20:45.500 --> 00:20:46.500
I'm ready to make a motion.

00:20:46.500 --> 00:20:47.500
You have a question, Chris?

00:20:47.500 --> 00:20:48.500
Yeah, thank you, Madam Mayor.

00:20:48.500 --> 00:20:52.180
Is there any value in approaching the land on earth with the golf course to square

00:20:52.180 --> 00:20:58.820
that up along Canyons Springs Road. At some point I believe so but currently

00:20:58.820 --> 00:21:05.020
for the wastewater project what we are getting with this 37 acres we'll cover

00:21:05.020 --> 00:21:13.550
that need. Thank you. Okay go ahead Chris. I move that we approve the purchase of

00:21:13.550 --> 00:21:17.630
real property located in the Snake River Canyon between the Canyon rim and

00:21:17.630 --> 00:21:22.390
Canyon Springs Road south of the city's wastewater treatment plant in the amount

00:21:22.390 --> 00:21:25.110
of 200,000 plus closing costs.

00:21:25.110 --> 00:21:26.550
Thank you, Sherry Vomer.

00:21:26.550 --> 00:21:27.590
I'll second.

00:21:27.590 --> 00:21:30.470
Thank you, motion by Chris Reed, second by Sherry Vomer

00:21:30.470 --> 00:21:32.550
to approve the purchase of real property

00:21:32.550 --> 00:21:35.430
in the Snake River Canyon,

00:21:35.430 --> 00:21:37.910
between the Canyon Rim and Canyon Springs Road,

00:21:37.910 --> 00:21:40.190
south of the city's wastewater treatment plant,

00:21:40.190 --> 00:21:44.230
the amount of $200,000 plus closing costs.

00:21:44.230 --> 00:21:47.580
Any further discussion?

00:21:47.580 --> 00:21:49.660
Rachel Rolkow, please.

00:21:49.660 --> 00:21:50.620
Ruth Pierce?

00:21:50.620 --> 00:21:51.460
Yes.

00:21:51.460 --> 00:21:52.300
Chris Reed?

00:21:52.300 --> 00:21:53.140
Yes.

00:21:53.140 --> 00:21:58.140
Jason Brown, Spencer Cutler, Gary Filmer, and Grace and Stone.

00:21:58.140 --> 00:22:05.550
Thank you. Motion passes 7-0. Thank you, Nathan, but don't go away.

00:22:05.550 --> 00:22:14.550
Okay. Next on the agenda is an action item. A request approval to renew the 2024 10-year agreement

00:22:14.550 --> 00:22:22.550
between the City of Twin Falls and Operations Management International, or OMICH2M Jacobs,

00:22:22.550 --> 00:22:39.550
the wastewater treatment plant and sewer lift stations operation with the fiscal year 2024-25 budget amount of 3,906,648.37 cents and authorized the mayor to sign.

00:22:39.550 --> 00:22:41.800
Thank you.

00:22:41.800 --> 00:22:42.800
All right.

00:22:42.800 --> 00:22:53.760
So, yes, the city, as you all know, has a long-going cooperation with its operations

00:22:53.760 --> 00:22:55.400
management international.

00:22:55.400 --> 00:23:01.320
We, Jacob's engineering is who we, I guess, are more familiar with, but it's all the

00:23:01.320 --> 00:23:03.360
same entity.

00:23:03.360 --> 00:23:07.760
And they've operated our White Sword Treatment Planet for almost 40 years.

00:23:07.760 --> 00:23:15.060
This will be 40 years and we have really appreciate their cooperation and the support in running that plant and

00:23:17.000 --> 00:23:19.000
Every 10 years we

00:23:19.400 --> 00:23:24.700
Have a contract that is renewed and this is the 10-year period when we renew that contract

00:23:25.920 --> 00:23:27.920
In that renewal

00:23:28.640 --> 00:23:30.640
We did negotiate some

00:23:30.640 --> 00:23:39.480
some small changes, which did help reduce some of the contract, and so this year we did see

00:23:39.480 --> 00:23:48.300
in this annual contract amount there was reduction of almost 3%, and that was due partially to

00:23:48.300 --> 00:23:56.140
some savings and power usage and our chemical cost and then also some other negotiated changes.

00:23:56.140 --> 00:23:59.660
I do, and I was going to start out with this, I do want to recognize that we do have our

00:23:59.660 --> 00:24:05.900
plant manager Dan Black and Sean Moffatt here today from Jacobs and we really do appreciate

00:24:05.900 --> 00:24:07.900
them.

00:24:07.900 --> 00:24:17.740
But the annual renewal we come back every year to renew the amount of the contract and make

00:24:17.740 --> 00:24:21.700
some minor changes to that.

00:24:21.700 --> 00:24:28.500
We do want to recognize that with this being the 10 year renewal that Jacobs has also been

00:24:28.500 --> 00:24:34.260
generous in wanting to contribute a little bit more back to the plant. And there's a project

00:24:34.260 --> 00:24:41.700
for a micro aeration project that Dan, he's a smart guy and we appreciate him. He's always

00:24:41.700 --> 00:24:47.500
trying to save us money and he sees that there's an opportunity for us by doing this

00:24:47.500 --> 00:24:52.140
micro aeration in our digester could actually eliminate the need for us to use some of our

00:24:52.140 --> 00:24:58.380
chemical. It's being done over in Boise very successfully and so he's really

00:24:58.380 --> 00:25:04.220
wanting to help get that going and Jacobs is offering $35,000 to put

00:25:04.220 --> 00:25:10.420
towards that project. I know if there's any questions. I read somewhere that

00:25:10.420 --> 00:25:20.440
project cost is $125 that way for the aeration. The micro aeration we're not

00:25:20.440 --> 00:25:29.440
I'm not sure, I think it actually is, the 35,000 will give it a good start and it may be even more like around, you know, less than 50,000.

00:25:29.440 --> 00:25:38.190
Oh, correct me if I'm wrong, Dan.

00:25:38.190 --> 00:25:43.190
That's what it was. I knew I saw 125 numbers.

00:25:43.190 --> 00:25:49.190
And that's annually too. That's an annual savings. So this is, this is, could be big for the city.

00:25:49.190 --> 00:25:54.250
That'd be huge. Anybody have any questions for Nathan on this?

00:25:54.250 --> 00:25:58.590
I always like to save 3%.

00:25:58.590 --> 00:26:01.650
I would entertain a motion then, Jason.

00:26:01.650 --> 00:26:09.800
I'd move to approve the renewal of the 2020-24-10 year agreement between the City of Twin Falls

00:26:09.800 --> 00:26:16.360
and Operation Management International, OMICH2M and Jacobs for the wastewater treatment

00:26:16.360 --> 00:26:23.770
plant and sewer lift stations, operations for the fiscal years, 2024-2025, a budget

00:26:23.770 --> 00:26:31.490
amount of $3,906,000 to authorize the mayor to sign.

00:26:31.490 --> 00:26:32.730
Thank you, Sherry Vomer.

00:26:32.730 --> 00:26:34.490
I will second.

00:26:34.490 --> 00:26:40.810
Thank you, motion to approve the renewal of the 2024 10-year agreement between the City

00:26:40.810 --> 00:26:48.570
of Twin Falls and OMI International CH2M Jacobs for the wastewater treatment plant and sewer

00:26:48.570 --> 00:26:55.570
lift stations operation per fiscal year 24 25 budget amount of 3 million 906

00:26:55.570 --> 00:27:00.450
thousand six forty eight and thirty seven six and authorize the mayor to

00:27:00.450 --> 00:27:08.550
sign any further discussion you know Sean if we keep adding some some more

00:27:08.550 --> 00:27:16.280
names to that it'll be even better yeah for who Rachel Rojo vote please

00:27:16.280 --> 00:27:30.640
Greg Hawkins. Yes. Jason Brown. Yes. Enter Cutler. Yes. Sherry Balmer. Yes. Grayson Stone. Yes. Ruth Pierce. Yes. And Chris Sweet. Yes. Thank you. Motion passes seven to zero. Thank you, Nathan.

00:27:30.640 --> 00:27:45.850
Okay, that is it under items of consideration. We have several public hearings tonight, but before we go to public hearings, it's time on the agenda for general public input.

00:27:45.850 --> 00:27:50.350
input if there's anybody in the audience that wishes to address City Council

00:27:50.350 --> 00:27:55.930
today you can come down to the podium and state your name and you have two

00:27:55.930 --> 00:28:02.160
minutes anybody here that wishes to address City Council and this would be

00:28:02.160 --> 00:28:10.270
on items not on the public hearing tonight that helps AC no one advisory

00:28:10.270 --> 00:28:18.350
board reports pretty quiet we anything from the City Manager's office yeah

00:28:18.350 --> 00:28:21.030
Madam Mayor, members of the council,

00:28:21.030 --> 00:28:23.110
later on the agenda, item eight,

00:28:23.110 --> 00:28:25.950
you'll notice that there is an executive session

00:28:25.950 --> 00:28:30.110
hosted under matters of trade and commerce,

00:28:30.110 --> 00:28:34.710
Idaho Code Section 74-2061E.

00:28:34.710 --> 00:28:37.550
We're going to ask that the council

00:28:37.550 --> 00:28:42.550
cancel that hearing or the executive session this evening.

00:28:43.830 --> 00:28:47.430
The Idaho Supreme Court recently made a ruling

00:28:47.430 --> 00:28:51.110
on December 5th and staff and our legal counsel

00:28:51.110 --> 00:28:53.470
haven't had a full opportunity to digest

00:28:53.470 --> 00:28:56.870
the new requirements of that section of Idaho Code.

00:28:56.870 --> 00:29:01.750
And so it's probably a safer approach for us

00:29:01.750 --> 00:29:05.350
not to go into executive session until we understand

00:29:05.350 --> 00:29:08.590
the new decision and the issue at hand

00:29:08.590 --> 00:29:11.110
is not one that can't wait a couple of weeks

00:29:11.110 --> 00:29:14.430
for us to digest the new opinion.

00:29:14.430 --> 00:29:17.880
Thank you.

00:29:17.880 --> 00:29:19.450
Okay.

00:29:19.450 --> 00:29:22.450
So next we'll move into public hearings.

00:29:22.450 --> 00:29:25.490
I'm gonna go ahead and read the rules related

00:29:25.490 --> 00:29:27.650
to public hearings, even though not all these

00:29:27.650 --> 00:29:30.090
are gonna quite fall under that.

00:29:31.850 --> 00:29:35.130
The council will follow these steps for each request listed

00:29:35.130 --> 00:29:37.530
under public hearing portion of the agenda.

00:29:37.530 --> 00:29:41.090
City staff will present the request and analysis.

00:29:41.090 --> 00:29:44.090
The applicant will then present their request.

00:29:44.090 --> 00:29:47.710
Council will ask questions of the applicant or staff.

00:29:47.710 --> 00:29:49.510
After questions have been asked,

00:29:49.510 --> 00:29:52.010
the public hearing will then be opened.

00:29:52.010 --> 00:29:54.170
During that time, anyone in attendance

00:29:54.170 --> 00:29:56.510
has given the opportunity to comment.

00:29:56.510 --> 00:29:59.890
Ask questions about the request being considered.

00:29:59.890 --> 00:30:02.490
When giving testimony, please step up to the podium,

00:30:02.490 --> 00:30:04.610
state your name and address,

00:30:04.610 --> 00:30:07.010
present your comments or concerns.

00:30:07.010 --> 00:30:10.410
After giving testimony, please sign the public record sheet

00:30:10.410 --> 00:30:13.090
located in the lobby, which is upstairs,

00:30:13.090 --> 00:30:15.490
with your name and address for the record.

00:30:15.490 --> 00:30:17.330
After public comments are concluded,

00:30:17.330 --> 00:30:20.530
the applicant will be invited to answer any questions

00:30:20.530 --> 00:30:22.050
and make a closing statement.

00:30:22.050 --> 00:30:25.530
Staff will then answer, clarify any comments.

00:30:25.530 --> 00:30:27.690
After the closing statements, the public hearing

00:30:27.690 --> 00:30:29.170
will be closed.

00:30:29.170 --> 00:30:31.890
No further testimony or comments from the applicant

00:30:31.890 --> 00:30:33.890
or audience will be allowed.

00:30:33.890 --> 00:30:38.180
And then the council will have discussion and take action.

00:30:38.180 --> 00:30:43.180
Okay, so our first item on a public hearing

00:30:43.180 --> 00:30:46.500
under public hearings, is an action item.

00:30:46.500 --> 00:30:49.660
Request to authorize a new city of Twin Falls

00:30:49.660 --> 00:30:54.660
owned and operated sewer odor mitigation facility

00:30:54.760 --> 00:30:58.860
on property located at 879 Fridivration Road,

00:30:58.860 --> 00:31:00.980
here of the city of Twin Falls,

00:31:00.980 --> 00:31:04.500
PZ24-0126.

00:31:04.500 --> 00:31:07.260
We have our senior planner, Will Clayver,

00:31:07.260 --> 00:31:10.740
and I want to point out that the city is mostly applicant

00:31:10.740 --> 00:31:15.740
and the staff, so you're holding both hats, correct?

00:31:16.420 --> 00:31:17.420
Yes, and no.

00:31:17.420 --> 00:31:20.780
We're also at Nathan Erickson with our public hand.

00:31:20.780 --> 00:31:21.620
Perfect.

00:31:21.620 --> 00:31:23.260
To present.

00:31:23.260 --> 00:31:24.460
Perfect.

00:31:24.460 --> 00:31:25.620
Go ahead.

00:31:25.620 --> 00:31:28.860
All right, today we have a sewer,

00:31:28.860 --> 00:31:33.860
what we call a new use on city owned and operated parcels.

00:31:33.940 --> 00:31:36.340
This is similar to what a special use permit is.

00:31:36.340 --> 00:31:38.580
However, it's not as strict and as stringent

00:31:38.580 --> 00:31:50.580
that process would be and that's why it comes to you directly as part of Twin Falls Municipal Code 10-7-9-T.

00:31:50.580 --> 00:32:01.890
I believe it's 19. I might have, yes, I did a mistypo on your staff report. It's 10-7-19 rather than 10-7-9.

00:32:01.890 --> 00:32:09.890
The subject property that we're looking at is on the southeast corner of Grandview Drive North and Federation Road.

00:32:09.890 --> 00:32:15.890
Just to the north across Federation Road is a school.

00:32:15.890 --> 00:32:21.890
And then on the south and eastern portions are residential houses.

00:32:21.890 --> 00:32:28.890
The western portion is county jurisdiction and it has not been developed, I believe it's still used for agriculture.

00:32:28.890 --> 00:32:45.800
zoning-wise we have this as R2 it's a pretty heavy R2 area a little further

00:32:45.800 --> 00:32:53.380
south is a PUD all the center point and Connor beauty that PUD was approved however

00:32:53.380 --> 00:32:59.090
no ordinance was done so it's kind of a limbo this Canyon properties is a

00:32:59.090 --> 00:33:09.810
residential and commercial PUD as well. As far as the future land use goes, this

00:33:09.810 --> 00:33:15.130
area is heavily denoted as town neighborhood. This means primarily residential and

00:33:15.130 --> 00:33:22.410
character with desired land use of single-family duplex, triplex, and schools and civic facilities.

00:33:22.410 --> 00:33:32.640
Currently, the property is being utilized as a stormwater retention for the area and the

00:33:32.640 --> 00:33:38.400
ideas to have a proposed purpose park in that area.

00:33:38.400 --> 00:33:41.000
Google Street View shows the area.

00:33:41.000 --> 00:33:44.920
This is this road on top is Federation.

00:33:44.920 --> 00:33:47.560
This is at the corner of Federation in Grandview.

00:33:47.560 --> 00:33:52.800
You can see the school off on the left side of the picture,

00:33:52.800 --> 00:33:56.010
and then on the right side of the proposed location.

00:33:56.010 --> 00:34:02.720
On the bottom picture, you can see the surrounding area.

00:34:02.720 --> 00:34:06.480
Where this proposed sewer odor mitigation

00:34:06.480 --> 00:34:10.020
is right where my mouse is on the northwest corner,

00:34:10.020 --> 00:34:11.940
just this general facility.

00:34:13.740 --> 00:34:19.990
When reviewing this, we found that it balanced

00:34:19.990 --> 00:34:22.910
the distance between the school, the Rock Creek Elementary,

00:34:22.910 --> 00:34:27.180
and then the residential neighborhood on the eastern

00:34:27.180 --> 00:34:32.790
south portions, it really didn't balance the smell

00:34:32.790 --> 00:34:42.710
Balance the smell, the noise, if it was a placement, I was really good on this spot.

00:34:42.710 --> 00:34:47.710
This would be the most ideal location for it for that balancing aspect.

00:34:47.710 --> 00:34:53.450
It also has direct access that you could provide off federation.

00:34:53.450 --> 00:35:00.230
Here are some drawings of the proposed site.

00:35:00.230 --> 00:35:07.230
I'll just go over or just quickly go through them and then let Nathan speak

00:35:07.230 --> 00:35:13.620
to the specifics of it. Here's some

00:35:13.620 --> 00:35:17.300
pie symmetric renderings of it. There will be

00:35:17.300 --> 00:35:22.930
a wall in these applicant narrative. They do

00:35:22.930 --> 00:35:26.930
say that there will be some noise factors with the fan.

00:35:26.930 --> 00:35:30.930
However, with the wall, we believe that will

00:35:30.930 --> 00:35:33.930
mitigate most of the noise and should bother the

00:35:33.930 --> 00:35:48.960
surrounding uses. With that, I can stand for any

00:35:48.960 --> 00:35:51.960
questions or I can turn the time over to Nathan or

00:35:51.960 --> 00:35:54.960
Any questions for Will while he's here?

00:35:54.960 --> 00:35:56.960
Yes, Mayor, quick questions.

00:35:56.960 --> 00:36:02.440
In relation to this location, where's the closest temporary

00:36:02.440 --> 00:36:05.440
motor machine that you had when you were testing things out?

00:36:05.440 --> 00:36:11.440
I will let Nathan answer that one. He knows the specifics on those temporary locations.

00:36:11.440 --> 00:36:12.440
Okay, thank you.

00:36:12.440 --> 00:36:22.000
All right. Thank you again.

00:36:22.000 --> 00:36:29.280
So as you'll remember, it's been, I was just here October 28th

00:36:29.280 --> 00:36:33.720
and presenting on the results of this last summer's order study.

00:36:33.720 --> 00:36:38.680
And that kind of, hopefully, that reminds you of the why I'm back to request this.

00:36:38.680 --> 00:36:52.680
To go to your question, Mr. B, to a map here, so looking at this aerial map, yeah,

00:36:52.680 --> 00:36:56.840
so we're proposing to put it in the kind of northwest corner.

00:36:56.840 --> 00:37:00.080
The nearest Mandel where we were able to test during the trial,

00:37:00.080 --> 00:37:08.000
the summer was actually down here by this, just by the corner of Moose Street and Grizzly Drive.

00:37:09.380 --> 00:37:17.060
It was parked right there. It was less than 100 feet from this home. And all those neighbors,

00:37:17.620 --> 00:37:22.900
I did make contact with the closest homes there and let them know to contact me if there were any

00:37:22.900 --> 00:37:29.820
issues and I heard nothing in the summer, neither about noise nor, I mean, obviously,

00:37:29.820 --> 00:37:37.180
The odors should not be an issue because that's why it's supposed to be addressing.

00:37:37.180 --> 00:37:46.220
This location, we tested here and then went over on the rim and both locations worked.

00:37:46.220 --> 00:37:49.980
We saw a significant reduction in the number of odor complaints.

00:37:49.980 --> 00:37:53.900
This area has a history of having odor issues.

00:37:53.900 --> 00:38:00.700
This odor scrubber gives us the ability to pretty much pull the air out of the sewer,

00:38:00.700 --> 00:38:07.500
run it through carbon media, and put out the clean air.

00:38:07.500 --> 00:38:13.620
It, like I said, the summer helped kind of prove that that works.

00:38:13.620 --> 00:38:22.240
We had reduction in complaints, and even the complaints we did receive were a lot more

00:38:22.240 --> 00:38:26.940
moderate in their concerns of the orders.

00:38:26.940 --> 00:38:37.820
See, the location, we've reviewed that with our Parks and Rec director, but she's aware

00:38:37.820 --> 00:38:44.500
obviously this is kind of their property that we're dealing with and the location, we're trying

00:38:44.500 --> 00:38:50.900
to get as close to that corner as possible, but also keep it out of the intersection causing

00:38:50.900 --> 00:38:56.260
problems there and also making it so that we can access it so it's not too close to that corner.

00:38:57.380 --> 00:39:04.740
We're looking at about 95 feet off of the curb of Grandview, the approximate location that would be

00:39:04.740 --> 00:39:13.950
on the map that's in the packet. The permanent order scrubber, the city has already purchased

00:39:13.950 --> 00:39:17.870
that. That's one that we've been using this last summer at our public works office.

00:39:17.870 --> 00:39:24.870
The fan that would be used is larger than the one that's been on the trailer.

00:39:24.870 --> 00:39:31.870
It's been in use, but the permanent location or the permanent fan does have several things

00:39:31.870 --> 00:39:35.870
that will help mitigate the noise because we know that that's one of the biggest concerns

00:39:35.870 --> 00:39:36.870
that people have had.

00:39:36.870 --> 00:39:44.870
It does have a shroud around the fan itself to help, you know, contain some of the noise.

00:39:44.870 --> 00:39:51.870
There's also a sound attenuator, kind of like a silencer that comes off of the fan, and then

00:39:51.870 --> 00:39:56.090
the other thing that will make a big difference also that we didn't have this year around

00:39:56.090 --> 00:40:02.430
the temporary one is the fence that will go around the unit will be a precast concrete

00:40:02.430 --> 00:40:03.430
fence.

00:40:03.430 --> 00:40:11.380
And that will obviously stop any noise from going out, it'll push it up and absorb that.

00:40:11.380 --> 00:40:16.740
And I guess that is all I have right now, unless there's any questions.

00:40:16.740 --> 00:40:20.860
And, sir, has the question.

00:40:20.860 --> 00:40:24.010
Oh, you're good, Chris.

00:40:24.010 --> 00:40:25.010
Two things.

00:40:25.010 --> 00:40:27.010
Will this be the permanent home for?

00:40:27.010 --> 00:40:28.010
I see that it doesn't have a roof.

00:40:28.010 --> 00:40:33.010
So the elements during the winter, when it's not really being used as much,

00:40:33.010 --> 00:40:35.010
or will it be used during the winter?

00:40:35.010 --> 00:40:40.010
So, yeah, it would be turned off during the colder months.

00:40:40.010 --> 00:40:41.010
So it would be turned off.

00:40:41.010 --> 00:40:43.010
And, yeah, there's not a roof.

00:40:43.010 --> 00:40:48.810
We actually have a unit, it's similar, but it's a little more complicated, it has a little

00:40:48.810 --> 00:40:49.810
bit more to it.

00:40:49.810 --> 00:40:55.050
It's an odor you understand by the golf course in the canyon, right by the zipline, not many

00:40:55.050 --> 00:41:00.050
people realize it's there unless it's not working, but that it has also, it's an odor

00:41:00.050 --> 00:41:03.050
strip that's pulling air out of the sewer.

00:41:03.050 --> 00:41:06.290
You can't see what's in there, but there's no roof on that either.

00:41:06.290 --> 00:41:10.290
And it's okay to have these out or would they be removed during this period of time?

00:41:10.290 --> 00:41:15.530
No, this would be, once it's placed, it'll be there permanently.

00:41:15.530 --> 00:41:17.300
Jason.

00:41:17.300 --> 00:41:21.660
Nathan, I think you talked about it when you were here last,

00:41:21.660 --> 00:41:24.820
but how often are we anticipating to have to regenerate

00:41:24.820 --> 00:41:28.160
that unit with the carbon?

00:41:28.160 --> 00:41:35.640
Yeah, so our temporary unit is about a fourth of the capacity

00:41:35.640 --> 00:41:37.440
as far as the media that's in it.

00:41:37.440 --> 00:41:40.680
And we've been able to use that for over a year.

00:41:40.680 --> 00:41:45.000
we actually about mid-summer had to replace the media. This will have more media, more

00:41:45.000 --> 00:41:50.760
capacity. We're expecting probably every, you know, somewhere between two to five years

00:41:50.760 --> 00:42:01.290
could be longer, depending on once the media absorbs all the car or the all the hard hydrogen

00:42:01.290 --> 00:42:06.690
sulfide, it starts to smell and you know, you can tell pretty much immediately and then

00:42:06.690 --> 00:42:12.330
can get in there and we already have the media on site to replace it so if it you

00:42:12.330 --> 00:42:16.890
know when it does reach capacity in a few years we can just replace it.

00:42:16.890 --> 00:42:27.220
We'll have a question can we scroll up to the actual picture itself of the right there?

00:42:27.220 --> 00:42:32.980
Is there a particular reason why the wall doesn't go to the top?

00:42:32.980 --> 00:42:38.100
So they found the air circulation or no actually that's one consideration this is

00:42:38.100 --> 00:42:39.620
probably the best picture here.

00:42:39.620 --> 00:42:43.060
So the unit itself is seven and a half feet tall.

00:42:43.060 --> 00:42:45.060
This fence right now that's shown

00:42:45.060 --> 00:42:47.220
is the six foot fence.

00:42:47.220 --> 00:42:50.940
We can do a seven foot fence without happily engineering

00:42:50.940 --> 00:42:53.060
and it would almost cover it.

00:42:53.060 --> 00:42:54.420
There will only be half a foot showing

00:42:54.420 --> 00:42:57.740
and I think that would be a little bit more money,

00:42:57.740 --> 00:43:03.620
but I think that would be a good option.

00:43:03.620 --> 00:43:10.810
Any other questions for Nathan?

00:43:10.810 --> 00:43:18.350
Okay, do you have anything to add, Will at all?

00:43:18.350 --> 00:43:22.790
Nothing to add, just concluding that this will be an

00:43:22.790 --> 00:43:28.510
approval of a new use, and that's the verage that I

00:43:28.510 --> 00:43:32.100
recommend utilizing.

00:43:32.100 --> 00:43:36.420
And then also, if you would like that fence to be 7 feet,

00:43:36.420 --> 00:43:41.380
I recommend the condition to be placed upon it as well.

00:43:41.380 --> 00:43:46.380
Okay, so next we'll open it up for public input.

00:43:48.220 --> 00:43:50.180
Again, when you come down to the podium,

00:43:50.180 --> 00:43:53.260
please state your name and your address.

00:43:53.260 --> 00:43:54.940
State your comments.

00:43:54.940 --> 00:43:57.940
You will be given three minutes

00:43:57.940 --> 00:44:01.580
and I believe somebody will be timing.

00:44:01.580 --> 00:44:04.110
You have the timer ready.

00:44:04.110 --> 00:44:17.900
So anybody here wishes to address perfect?

00:44:17.900 --> 00:44:19.280
[Muted for privacy: home address]

00:44:19.280 --> 00:44:22.500
[Muted for privacy: home address]

00:44:22.500 --> 00:44:26.340
[Muted for privacy: home address]

00:44:26.340 --> 00:44:27.860
[Muted for privacy: home address]

00:44:29.380 --> 00:44:31.180
I come to you with two hats on as well.

00:44:31.180 --> 00:44:32.940
I also work at Rock Creek Elementary,

00:44:32.940 --> 00:44:34.980
and I do have some concerns with the elementary

00:44:34.980 --> 00:44:36.260
across the street as well.

00:44:36.260 --> 00:44:38.660
So I live in the house right on the corner,

00:44:38.660 --> 00:44:40.820
right across the street from the elementary,

00:44:40.820 --> 00:44:43.860
and I do know that you guys are hoping

00:44:43.860 --> 00:44:46.060
to put that in at the corner.

00:44:46.060 --> 00:44:50.940
I would like to point that it is the main crosswalk where students are crossing.

00:44:50.940 --> 00:44:54.740
I do fear that there would be some visibility issues for students crossing especially at

00:44:54.740 --> 00:44:58.420
nighttime or during daylight savings time.

00:44:58.420 --> 00:45:03.540
If you increase the fence that would make it less visible for people to see, it's going

00:45:03.540 --> 00:45:08.080
to be an eyesore.

00:45:08.080 --> 00:45:12.760
A lot of people in my neighborhood have reached out to me that weren't able to come but they

00:45:12.760 --> 00:45:14.880
did have other concerns.

00:45:14.880 --> 00:45:20.800
They asked about the flooding that happens anytime that there's massive flooding, to the

00:45:20.800 --> 00:45:24.440
point where people use kayaks in the back of that area.

00:45:24.440 --> 00:45:29.480
What are we going to do when it floods in that exact area about two feet?

00:45:29.480 --> 00:45:31.480
How are they going to work with that?

00:45:31.480 --> 00:45:35.080
Are they rebuilding the entire section over there?

00:45:35.080 --> 00:45:40.560
Other concerns I had, obviously, as I'm probably the closest house would be sound, smell, issues

00:45:40.560 --> 00:45:41.560
like that.

00:45:41.560 --> 00:45:44.680
Again, it's a huge eyesore.

00:45:44.680 --> 00:45:51.400
When it is dry, when it's not used for that, it is used for our neighborhood.

00:45:51.400 --> 00:45:55.880
We do neighborhood events there, there's practices that go on in that section.

00:45:55.880 --> 00:46:01.520
So if you're going to reestablish it for a new purpose, it is being used right now.

00:46:01.520 --> 00:46:06.480
So I want to say that it is being used for football practice for people using it as a

00:46:06.480 --> 00:46:08.680
park and playground all the time.

00:46:08.680 --> 00:46:14.200
And again, my biggest concerns would be student safety on that crosswalk, that lack of visibility

00:46:14.200 --> 00:46:19.000
when people are crossing there. I'd also be worried about the eyesore it would create.

00:46:20.840 --> 00:46:28.220
Again, see what else they want to talk about. The flooding was the big one. Another neighbor.

00:46:28.220 --> 00:46:41.240
Your time is up. I'm sorry. I'm sorry. Okay. Thank you. Go ahead.

00:46:42.740 --> 00:46:47.860
[Muted for privacy: home address]

00:46:47.860 --> 00:46:54.260
[Muted for privacy: home address]

00:46:54.260 --> 00:47:00.860
[Muted for privacy: home address]

00:47:00.860 --> 00:47:06.460
school being right there is going to be an obstructed area where people are going to have

00:47:06.460 --> 00:47:08.740
trouble seeing around that corner.

00:47:08.740 --> 00:47:14.260
I did notice that the place where they put the temporary facilities, we've had irrigation

00:47:14.260 --> 00:47:15.260
problems there.

00:47:15.260 --> 00:47:18.620
And so a lot of that smell is just coming from stagnant water.

00:47:18.620 --> 00:47:22.420
So I don't know if that's the same smell we're talking about when we're saying sewer water

00:47:22.420 --> 00:47:25.460
or if we're just talking stagnant water that's sitting there

00:47:25.460 --> 00:47:29.460
per month on end because the drainage is not done properly there.

00:47:29.460 --> 00:47:33.780
So my biggest concern is is this being done just because of poor drainage

00:47:33.780 --> 00:47:37.380
or is it being done for some other reason? Something we don't know about like the sewer going

00:47:37.380 --> 00:47:40.180
underneath the area. But we have noticed I've lived there

00:47:40.180 --> 00:47:44.820
before I moved there in 2019 and there was a long time where we just have

00:47:44.820 --> 00:47:47.620
stagnant water sitting there and that's kind of what the smell was

00:47:47.620 --> 00:47:53.780
that I found, but I do live down the street and we do walk our animals around there, so if there's

00:47:53.780 --> 00:47:58.740
noise like there was this summer, I think that might be a concern just because people aren't used

00:47:58.740 --> 00:48:03.700
to seeing it. So when we saw it there, we just like, okay, what is this? We didn't really know how to act

00:48:03.700 --> 00:48:09.060
or basically how long it was going to be there. So that's basically it. Put that whole neighborhood

00:48:09.060 --> 00:48:14.460
does utilize that space serve as a part of the future. That's it. Thank you. Thank you.

00:48:14.460 --> 00:48:20.290
[Muted for privacy: home address]

00:48:20.290 --> 00:48:36.320
[Muted for privacy: home address]

00:48:36.320 --> 00:48:43.760
[Muted for privacy: home address]

00:48:43.760 --> 00:48:50.990
[Muted for privacy: home address]

00:48:50.990 --> 00:49:00.590
is taking care of is a sewer smell and it I see it's it sounded like it was 95 feet off

00:49:00.590 --> 00:49:06.180
of the corner but I don't see that that's a problem for visibility around the corner

00:49:06.180 --> 00:49:13.820
and that's pretty far from houses it seems like a pretty fence that it is

00:49:13.820 --> 00:49:19.340
around there so I don't see an eyesore kids across the street of the school

00:49:19.340 --> 00:49:29.300
is probably 300 feet away from it and it doesn't put out smell. This is a

00:49:29.300 --> 00:49:36.140
difficult situation for the people that it affects negatively and so I think

00:49:36.140 --> 00:49:43.260
that thing that we have to do here is find the best scenario that it affects

00:49:43.260 --> 00:49:48.580
the least amount of people in a negative fashion and it seems like this is a

00:49:48.580 --> 00:49:57.060
a pretty good spot in my opinion. So I am definitely for it. We have to do

00:49:57.060 --> 00:50:02.420
something. I cannot continue to have the smells come directly into my house. And

00:50:02.420 --> 00:50:12.340
so I'm going to say I'm ready to fistfight anybody. No, it's a bad deal and I

00:50:12.340 --> 00:50:21.340
I get that people are around there and it's not ideal, but trust me, it's definitely something

00:50:21.340 --> 00:50:22.340
that's made.

00:50:22.340 --> 00:50:23.340
Thank you.

00:50:23.340 --> 00:50:25.500
Thank you, sir.

00:50:25.500 --> 00:50:28.500
Is there anybody else out in the audience that wishes to speak?

00:50:28.500 --> 00:50:35.620
I see no one.

00:50:35.620 --> 00:50:40.640
Any comments from you have anything else to add, Nathan?

00:50:40.640 --> 00:50:42.630
Yes.

00:50:42.630 --> 00:50:48.630
And actually, I think the stormwater part, I did not, I guess, address out fully like I needed

00:50:48.630 --> 00:50:49.630
to.

00:50:49.630 --> 00:50:52.350
So it is a stormwater retention area.

00:50:52.350 --> 00:50:55.150
So if you go out there, it is lower.

00:50:55.150 --> 00:50:58.270
And the location where we're proposing to put this,

00:50:58.270 --> 00:51:03.950
it is a lower spot in that stormwater retention area.

00:51:03.950 --> 00:51:06.190
So we would have to build that up.

00:51:06.190 --> 00:51:08.230
It's about an 800 square foot footprint

00:51:08.230 --> 00:51:10.830
of where the fence would be.

00:51:10.830 --> 00:51:12.150
But it'd have to be built up.

00:51:12.150 --> 00:51:13.870
And in building that up, we would have

00:51:13.870 --> 00:51:24.510
to add storage capacity for that stormwater retention area elsewhere on the property.

00:51:24.510 --> 00:51:28.150
It would be maybe an opportunity to address some of the drainage issues.

00:51:28.150 --> 00:51:33.510
However, the odors that we were addressing were from the sewer, not from any standing

00:51:33.510 --> 00:51:35.070
water or anything in that area.

00:51:35.070 --> 00:51:41.870
In fact, our complaints of odor issues are not, they're kind of everything north of about

00:51:41.870 --> 00:51:42.870
that location.

00:51:42.870 --> 00:51:45.950
It seems like that's where the issues are.

00:51:45.950 --> 00:51:49.030
What this grubber does is by sucking the air out,

00:51:49.030 --> 00:51:51.670
it relieves the pressure on the system.

00:51:51.670 --> 00:51:56.990
And so further down, we actually have higher H2S levels

00:51:56.990 --> 00:52:00.590
in the sewer along, ground view, kind of along that neighborhood,

00:52:00.590 --> 00:52:02.510
but the pressure's not there.

00:52:02.510 --> 00:52:05.430
So it's going down the line and coming out

00:52:05.430 --> 00:52:06.670
into some of the homes down further.

00:52:06.670 --> 00:52:15.670
So I think we will have to adjust some of that storage capacity in the stormwater retention area.

00:52:15.670 --> 00:52:26.250
It is set back off the road in a ways, and if there's a request to have it further,

00:52:26.250 --> 00:52:29.250
we could look at that if it's a concern.

00:52:29.250 --> 00:52:35.780
But I do believe that it's off of the sidewalk,

00:52:35.780 --> 00:52:42.460
and that sidewalk is about, it's 10 foot wide sidewalk right there, more four feet south of that,

00:52:42.460 --> 00:52:45.550
where the fence starts.

00:52:45.550 --> 00:52:56.950
You're actually, sorry, I have the mouse here, so they're looking at the site, so from the

00:52:56.950 --> 00:53:07.430
curb you have six feet of grass and then there's a 10 foot sidewalk and then there'd be a four

00:53:07.430 --> 00:53:11.890
foot before you would get to the fence.

00:53:11.890 --> 00:53:17.790
But it's 90 some feet from the intersection is that yeah 95 feet okay

00:53:17.790 --> 00:53:24.490
from to the intersection to the west is 95 can they zoom in on that small map up

00:53:24.490 --> 00:53:33.550
in the corner kind of see it's a way the way from that crosswalk that's a concern

00:53:33.550 --> 00:53:43.290
and our site triangles are 40 feet by 40 feet so that's well above it's well

00:53:43.290 --> 00:53:48.600
out of the site triangle for city code.

00:53:48.600 --> 00:53:51.430
That was my question.

00:53:51.430 --> 00:53:54.230
And I guess one more thing, I mean, as far as an eyesore,

00:53:54.230 --> 00:53:58.870
I mean, we're trying to use the precast fence,

00:53:58.870 --> 00:54:02.390
and you know, going seven foot would not be a problem

00:54:02.390 --> 00:54:03.670
to try and make it look nice.

00:54:03.670 --> 00:54:06.070
The other thing is, is with that precast,

00:54:06.070 --> 00:54:10.310
we're also going to have it coated with an anti-grifidi

00:54:10.310 --> 00:54:12.990
coating so that that was one thing

00:54:12.990 --> 00:54:18.630
Wendy, our Parks and Rec director, she requested just, she's worried if any any

00:54:18.630 --> 00:54:25.790
at graffiti occurred. What about climbing? Those pre-castes are not like, I don't

00:54:25.790 --> 00:54:30.030
think that there's really finger holes enough to climb it and being

00:54:30.030 --> 00:54:34.350
seven foot, it should be more of a deterrent for kids trying to climb the fence.

00:54:34.350 --> 00:54:42.590
We would hope. Or a challenge, hopefully not. Okay, anybody else that wishes to

00:54:42.590 --> 00:54:48.250
to address City Council on this issue.

00:54:48.250 --> 00:54:51.290
Okay, then I'll close the public hearing.

00:54:51.290 --> 00:54:53.210
No further testimony or comments

00:54:53.210 --> 00:54:55.810
from the applicant or audience will be allowed.

00:54:55.810 --> 00:54:58.530
So Council, what are your wishes?

00:54:58.530 --> 00:55:00.050
Yeah, I think, great.

00:55:01.810 --> 00:55:03.130
Thank you, Madam Mayor.

00:55:03.130 --> 00:55:09.390
I kind of had the same issues as the guy that came up

00:55:09.390 --> 00:55:11.190
and talked about the side triangle

00:55:11.190 --> 00:55:15.110
and also about utilizing that space for practices

00:55:15.110 --> 00:55:20.070
for football and soccer, but I believe there's quite a bit of variant in that 26 feet, because

00:55:20.070 --> 00:55:24.230
that's on the slope leading down to the drainage, correct? So that wouldn't necessarily be utilized

00:55:24.230 --> 00:55:28.670
for practice space. So it kind of eats up some of that grade.

00:55:28.670 --> 00:55:37.310
Full of water too. Yeah, I would be inclined to raise the fence to max capacity without

00:55:37.310 --> 00:55:45.090
engineering. Hey, Chris Reed. I was just going to add that I'm in favor of bringing it up

00:55:45.090 --> 00:55:47.090
to seven feet as well.

00:55:47.090 --> 00:55:48.090
Thank you.

00:55:48.090 --> 00:55:49.090
Chair Volmer.

00:55:49.090 --> 00:55:52.240
I'll echo the seven foot fence.

00:55:52.240 --> 00:55:56.550
I think that definitely needs to be done.

00:55:56.550 --> 00:55:58.830
Looking at the map, the vicinity map,

00:55:58.830 --> 00:56:03.590
and taking into consider her concerns over,

00:56:03.590 --> 00:56:05.270
or that it's not just her concerns.

00:56:05.270 --> 00:56:08.710
She's neighborhood concerns over the site.

00:56:08.710 --> 00:56:13.700
It does appear that it's further off,

00:56:13.700 --> 00:56:16.060
which would not, it doesn't appear

00:56:16.060 --> 00:56:21.860
that it would impede visual of walking on the sidewalk.

00:56:23.870 --> 00:56:25.910
And then looking to see to understand

00:56:25.910 --> 00:56:31.810
that it's being used right now in a park sense,

00:56:33.780 --> 00:56:37.760
looking at the vicinity map that looks pretty small on there.

00:56:37.760 --> 00:56:42.940
Does that, and when we can't ask questions.

00:56:42.940 --> 00:56:47.300
You can ask staff.

00:56:47.300 --> 00:56:49.940
I was just wondering if that,

00:56:49.940 --> 00:56:51.780
you've seen it on the vicinity map

00:56:51.780 --> 00:57:04.500
if it seemed smaller than what the neighbors had had envisioned.

00:57:04.500 --> 00:57:07.460
We know that it's an 800 square foot upward from a fence.

00:57:07.460 --> 00:57:11.700
There have some rating to go down from the fence into the area.

00:57:11.700 --> 00:57:14.780
And this still needs to go through to get a permit.

00:57:14.780 --> 00:57:17.020
So we'll get some building permit, kind of placement permits,

00:57:17.020 --> 00:57:18.660
and go through all of the development services

00:57:18.660 --> 00:57:22.700
for all of the required codes for that back or those types

00:57:22.700 --> 00:57:25.340
of things from the intersection, just to assure

00:57:25.340 --> 00:57:28.740
that that will happen.

00:57:28.740 --> 00:57:31.620
I don't just looking at what the neighbors' concerns were

00:57:31.620 --> 00:57:38.430
on there and very valid concerns versus what we're trying

00:57:38.430 --> 00:57:41.350
to do here, and we're not just putting up the storage building.

00:57:41.350 --> 00:57:46.360
We're trying to combat the older issue as well.

00:57:46.360 --> 00:57:51.950
I think this will probably be the minimal spacing

00:57:51.950 --> 00:57:57.270
and I think the seven-foot fence would probably be a monster.

00:57:57.270 --> 00:57:59.820
Spencer.

00:57:59.820 --> 00:58:02.020
Tonight's hearing just brought to light the issue

00:58:02.020 --> 00:58:05.740
or the conundrum we have with water retention in parks.

00:58:05.740 --> 00:58:11.860
The EPA requires that water is retained on site, storm water cannot run off.

00:58:11.860 --> 00:58:19.020
So it's less expensive up front when the water is retained there in a situation like this.

00:58:19.020 --> 00:58:23.460
The downside is it floods when it rains and it's not usable space.

00:58:23.460 --> 00:58:27.980
I think it's accurate to say generally this is not permitted anymore.

00:58:27.980 --> 00:58:32.740
The downside is that it adds more up front costs to lots when people are buying homes

00:58:32.740 --> 00:58:37.540
in the future because the developers had to take other means to try to manage stormwater.

00:58:37.540 --> 00:58:45.220
So it's one of those pros and cons to doing it either way, but it's not an oversight or

00:58:45.220 --> 00:58:46.220
a mistake.

00:58:46.220 --> 00:58:49.460
It was actually designed that way on purpose when the developer built this to comply with

00:58:49.460 --> 00:58:50.460
the regulations.

00:58:50.460 --> 00:58:52.460
So I just wanted to clarify that.

00:58:52.460 --> 00:58:53.460
Good point.

00:58:53.460 --> 00:58:54.460
Thank you.

00:58:54.460 --> 00:58:55.460
Jason Brown.

00:58:55.460 --> 00:58:56.460
Yeah.

00:58:56.460 --> 00:59:02.540
Well, if on Hankins, go over to Hankins and go to Street View on your map, can you just

00:59:02.540 --> 00:59:11.570
of the map on your side, so I'll give you a general idea of what I think the precast concrete

00:59:11.570 --> 00:59:23.940
wall would be there by Pillar Falls on Hankins. Pillar Falls Elementary School, sorry, on Hankins.

00:59:27.230 --> 00:59:34.300
Hankins and stadium would be a good, yeah, that's okay. Where are you from? I'll be a little bit

00:59:34.300 --> 00:59:38.860
more specific on my direct right there. So if you go to Street View there, I think it gives a good

00:59:38.860 --> 00:59:45.460
indication of what what this precast wall would would generally look like.

00:59:45.460 --> 00:59:50.720
I think that's what you would end up with. I drive I drive by there on a regular

00:59:50.720 --> 00:59:58.300
almost daily basis and you don't even really recognize that structure.

00:59:58.300 --> 01:00:02.580
Obviously this is going to be something that would be new. People would recognize

01:00:02.580 --> 01:00:08.280
it for a while. But I think with the site triangle and some of the engineering

01:00:08.280 --> 01:00:12.940
practices that we put in place also following other standards. I'm not sure

01:00:12.940 --> 01:00:18.240
that would be a huge issue with with traffic particularly because once they

01:00:18.240 --> 01:00:24.600
start going east you know you can see you should be able to see that intersection

01:00:24.600 --> 01:00:27.720
pretty well the one that we're talking about but I thought that was a good

01:00:27.720 --> 01:00:33.440
visual representation of what I guess I'm assuming the old castle or the

01:00:33.440 --> 01:00:43.280
precast whether we go to seven foot or not I guess I'm okay if we need to

01:00:43.280 --> 01:00:55.520
make a huge difference. Anybody else? Well I think the issue that Mr. Bishop

01:00:55.520 --> 01:01:01.040
talked about is huge and and I know we've had complaints and complaints and you know

01:01:01.040 --> 01:01:06.200
this is a to me a great long-term solution that we've been looking for to

01:01:06.200 --> 01:01:12.780
help mitigate that and I would concur that the seven-foot wall is probably the

01:01:12.780 --> 01:01:17.360
direction they had. So I'm entertaining a motion.

01:01:17.360 --> 01:01:24.840
I move that we approve the authorization of a new City of Twin Falls owned and

01:01:24.840 --> 01:01:30.520
operated sewer order mitigation facility. I'm properly located at 879

01:01:30.520 --> 01:01:35.920
Federation Road, care of the City of Twin Falls with a condition of a seven-foot

01:01:35.920 --> 01:01:36.920
Thank you.

01:01:36.920 --> 01:01:39.460
Do I have a second?

01:01:39.460 --> 01:01:40.460
Okay.

01:01:40.460 --> 01:01:41.460
Thank you.

01:01:41.460 --> 01:01:42.460
Motion by Chris Reed.

01:01:42.460 --> 01:01:48.660
Second by Craig Hawkins to authorize the new city of Twin Falls Zone and operated a sewer

01:01:48.660 --> 01:01:56.460
odor mitigation facility on property located at 879 Federation Road with a condition of

01:01:56.460 --> 01:01:59.220
a seven foot fence.

01:01:59.220 --> 01:02:02.170
Any further discussion?

01:02:02.170 --> 01:02:04.170
Rachel Roquevo, please.

01:02:04.170 --> 01:02:35.640
Councillor. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes. Yes.

01:02:35.640 --> 01:02:40.640
and we have our URA Executive Director, Sean Baraker.

01:02:41.640 --> 01:02:43.280
Welcome, Sean.

01:02:43.280 --> 01:02:44.440
Thank you, one moment,

01:02:44.440 --> 01:02:47.040
because I figured you're gonna ask me for a mask.

01:02:47.040 --> 01:03:08.000
The delay there.

01:03:08.000 --> 01:03:09.280
Thank you.

01:03:09.280 --> 01:03:10.760
Thank you, Mayor and Council.

01:03:10.760 --> 01:03:14.000
So this is, I believe the third time

01:03:14.000 --> 01:03:16.760
you've heard some information and presentation

01:03:16.760 --> 01:03:20.440
on this item that we've been working on for the last several

01:03:20.440 --> 01:03:24.320
months back in June, the Urban Renewal Agency,

01:03:24.320 --> 01:03:29.320
had Cushlin Associates work through an eligibility report

01:03:29.600 --> 01:03:33.180
for this new proposed urban renewal area.

01:03:35.600 --> 01:03:37.780
There's the map on the screen up there,

01:03:37.780 --> 01:03:41.840
so it's South Washington and then Diamond Avenue

01:03:41.840 --> 01:03:44.400
up to South Park Avenue, out to Grandview

01:03:44.400 --> 01:03:49.400
and down to Orchard, encompassing approximately 352 acres.

01:03:50.320 --> 01:03:52.880
The area provides an opportunity for future commercial

01:03:52.880 --> 01:03:57.800
and industrial development, and it is supported,

01:03:57.800 --> 01:04:00.760
that would be supported by eligible public improvements

01:04:00.760 --> 01:04:03.640
that could be initiated by the Herbrominal Agency.

01:04:03.640 --> 01:04:06.160
So the eligibility report was conducted

01:04:06.160 --> 01:04:09.760
and found that it was suitable for an Herbrominal Project

01:04:09.760 --> 01:04:12.280
in accordance with Idaho Code.

01:04:12.280 --> 01:04:15.040
Following that, an Economic Feasibility Study

01:04:15.040 --> 01:04:21.230
was conducted that spoke to anticipated private improvements

01:04:21.230 --> 01:04:22.950
that would incur in that area,

01:04:22.950 --> 01:04:26.190
and the associated public improvements

01:04:26.190 --> 01:04:28.030
that could be supported by that.

01:04:29.420 --> 01:04:33.140
That was all reported back to the Urban Renewal Agency,

01:04:33.140 --> 01:04:36.860
and then recommended to the Council

01:04:36.860 --> 01:04:40.820
for consideration of adoption of the eligibility report,

01:04:40.820 --> 01:04:44.040
which you did back in August.

01:04:44.040 --> 01:04:47.160
There are many steps, as you know,

01:04:47.160 --> 01:04:50.080
to creating an urban renewal area

01:04:50.080 --> 01:04:52.800
that includes drafting the plan itself,

01:04:52.800 --> 01:04:58.440
receipt of agricultural consents for property owners within the area whose properties are

01:04:58.440 --> 01:05:03.240
currently agricultural operations of which there are several in this reviewed by the

01:05:03.240 --> 01:05:07.940
Planning and Zoning Commission for concurrence with the comprehensive plan, formal adoption

01:05:07.940 --> 01:05:13.180
of the plan by the agency board, communication with the overlapping taxing districts and

01:05:13.180 --> 01:05:18.760
ultimately the formal adoption of the ordinance by the city council following noticed public

01:05:18.760 --> 01:05:22.280
hearing, which is what we're doing tonight. So each of those steps has been

01:05:22.280 --> 01:05:28.760
completed for this urbrenal area and are outlined in the ordinance that's in

01:05:28.760 --> 01:05:33.360
your packet. The purpose of the item tonight is to hold a public hearing on the

01:05:33.360 --> 01:05:37.360
creation of a new revenue allocation area on the property

01:05:37.360 --> 01:05:41.200
referenced. The council is also being asked this

01:05:41.200 --> 01:05:45.680
evening to consider adopting the ordinance which would create the new

01:05:45.680 --> 01:05:51.920
area that would need to be done with a dispensing of the rules and placing it on

01:05:51.920 --> 01:05:57.160
third and final reading by title only. If the ordinance is adopted this new area

01:05:57.160 --> 01:06:00.720
will assist in funding again those eligible public improvements such as

01:06:00.720 --> 01:06:06.080
streets, stormwater management facilities, water and sewer systems, pedestrian and

01:06:06.080 --> 01:06:11.840
bicycle facilities, irrigation system modifications, rail spur, relocation and

01:06:11.840 --> 01:06:16.540
electrical and gas improvements.

01:06:16.540 --> 01:06:21.940
So you must, again, if you determine following the public hearing that you wish to adopt the

01:06:21.940 --> 01:06:26.840
ordinance this evening, you'll have to do the additional motion to suspend the rules and so

01:06:26.840 --> 01:06:28.140
forth.

01:06:28.140 --> 01:06:33.020
So current, I will say that the adoption of this ordinance doesn't have a direct impact

01:06:33.020 --> 01:06:36.980
on the city's current or future budgets.

01:06:36.980 --> 01:06:41.900
After the area would sunset in 20 years if it's adopted, then the city and all the other

01:06:41.900 --> 01:06:46.900
other taxing entities would be able to claim the increment value that in the meantime could

01:06:46.900 --> 01:06:52.900
be utilized by the Urban Renewal Agency to support public improvements. So with that I will stop

01:06:52.900 --> 01:06:59.860
talking, you can do the public hearing and then I can come back up and speak to the proposed

01:06:59.860 --> 01:07:00.860
motions.

01:07:00.860 --> 01:07:11.200
Perfect. Okay. I will open up the public hearing for this particular item, the Urban Renewal Agency

01:07:11.200 --> 01:07:15.440
plan for Southwest Urban Renewal Project.

01:07:15.440 --> 01:07:17.360
Is there anybody in the audience that wishes

01:07:17.360 --> 01:07:28.390
to address City Council on this public hearing?

01:07:28.390 --> 01:07:31.380
Hey, see no one?

01:07:31.380 --> 01:07:33.020
Have anything to add?

01:07:33.020 --> 01:07:35.780
No, I would just emphasize again that tonight

01:07:35.780 --> 01:07:38.260
would be held the hearing.

01:07:38.260 --> 01:07:43.320
If you wish to move forward with the adoption of the ordinance,

01:07:43.320 --> 01:07:45.640
can suspend the rules and place an unthird and final reading

01:07:45.640 --> 01:07:48.800
by title only, and then take that action.

01:07:48.800 --> 01:07:53.800
The following steps for this, we will publish a summary

01:07:53.800 --> 01:07:56.720
of the ordinance, because as you noted, it's lengthy.

01:07:56.720 --> 01:07:59.240
I will have a summary published, and then communication

01:07:59.240 --> 01:08:02.920
to all of the overlapping taxing districts,

01:08:02.920 --> 01:08:05.680
as well as recording the plan and communicating

01:08:05.680 --> 01:08:07.160
with the State Tax Commission.

01:08:07.160 --> 01:08:09.480
All of those entities are well aware of this process.

01:08:09.480 --> 01:08:12.320
They've been engaged since we started it back this summer.

01:08:12.320 --> 01:08:13.240
So.

01:08:13.240 --> 01:08:14.080
Thank you.

01:08:14.080 --> 01:08:17.160
So I'm gonna officially close the public hearing

01:08:17.160 --> 01:08:20.600
and move on to council discussion, Grace and Stone.

01:08:20.600 --> 01:08:21.440
Thank you Madam Mayor.

01:08:21.440 --> 01:08:24.440
I guess my question's directed more to Director Berger.

01:08:24.440 --> 01:08:27.540
If you can answer it, if I'm allowed to ask,

01:08:27.540 --> 01:08:30.800
will that reset the sunset clause

01:08:30.800 --> 01:08:34.040
on the existing parcel with alphigurs,

01:08:34.040 --> 01:08:35.680
right there on West Washington,

01:08:35.680 --> 01:08:37.560
or will it just absorb it?

01:08:37.560 --> 01:08:42.240
So the South Washington Erbournole project area

01:08:42.240 --> 01:08:44.120
was terminated earlier this year.

01:08:44.120 --> 01:08:47.040
So it does not exist anymore.

01:08:47.040 --> 01:08:49.280
It is encompassed within this property,

01:08:49.280 --> 01:08:52.240
but that area is already terminated.

01:08:52.240 --> 01:08:54.460
Perfect, thank you.

01:08:54.460 --> 01:08:55.860
Jason Brown.

01:08:55.860 --> 01:08:58.140
I'll make a motion if there are no other questions.

01:08:58.140 --> 01:08:59.460
That'd be great.

01:08:59.460 --> 01:09:01.900
I move we dispense with the reading of the rules

01:09:01.900 --> 01:09:06.900
and put ordinance number 2024-C21 on third and final,

01:09:09.580 --> 01:09:11.340
reading by title only.

01:09:11.340 --> 01:09:13.140
Thank you to have the second.

01:09:13.140 --> 01:09:14.140
Second.

01:09:14.140 --> 01:09:19.020
Thank you motion by Jason Brown, seconded by Craig Hawkins,

01:09:19.020 --> 01:09:21.500
to dispense with the reading of the rules

01:09:21.500 --> 01:09:26.500
in place ordinance 2024-021 on third and final reading

01:09:26.780 --> 01:09:29.560
by title only.

01:09:29.560 --> 01:09:32.610
Amy, Rachel Rolkalvo, please.

01:09:33.570 --> 01:09:34.450
Ruth Pierce.

01:09:34.450 --> 01:09:35.290
Yes.

01:09:35.290 --> 01:09:36.130
Chris Reed.

01:09:36.130 --> 01:09:36.970
Yes.

01:09:36.970 --> 01:09:37.810
Craig Hawkins.

01:09:37.810 --> 01:09:38.650
Jason Brown.

01:09:38.650 --> 01:09:39.490
Yes.

01:09:39.490 --> 01:09:40.330
Spencer Cutler.

01:09:40.330 --> 01:09:41.170
Yes.

01:09:41.170 --> 01:09:42.170
Yes.

01:09:42.170 --> 01:09:43.170
Yes.

01:09:43.170 --> 01:09:44.170
Thank you.

01:09:44.170 --> 01:09:45.170
Motion passes 7-0.

01:09:45.170 --> 01:09:46.170
Okay.

01:09:46.170 --> 01:09:54.290
I will read the ordinance 2024-021, an ordinance of the City Council of the City of Twin Falls,

01:09:54.290 --> 01:10:00.850
Idaho approving the Urban Renewal Plan for the Southwest Urban Renewal Project, which plan

01:10:00.850 --> 01:10:08.130
includes revenue allocation, financing provisions, authorizing the City Clerk to transmit a copy

01:10:08.130 --> 01:10:14.290
of this ordinance and other required information to county and state officials and the effect

01:10:14.290 --> 01:10:23.730
in taxing entities providing severability, codification and publication by summary, providing

01:10:23.730 --> 01:10:27.970
for waiver of the reading rules and provided an effective date.

01:10:27.970 --> 01:10:29.520
Chris Reed.

01:10:29.520 --> 01:10:32.520
Move to approve ordinance number 2024-021.

01:10:32.520 --> 01:10:33.520
Thank you.

01:10:33.520 --> 01:10:36.240
Do I have a second, Jason Brown?

01:10:36.240 --> 01:10:37.240
Second.

01:10:37.240 --> 01:10:43.480
Thank you motion by Chris Reed second by Jason Brown to approve the adoption of Ordinance

01:10:43.480 --> 01:10:55.130
2024-0 to do you have something Grayson okay Rachel Roel call vote please yes Chris Reed

01:10:55.130 --> 01:11:08.320
yes yes Jason Brown yes yes yes yes yes yes thank you motion passes 70-0 thank you Sean

01:11:08.320 --> 01:11:13.320
Okay, the next action item is a request for a zoning title

01:11:13.320 --> 01:11:16.780
amendment to repeal and replace title 10,

01:11:16.780 --> 01:11:22.260
focusing on chapter one general provisions,

01:11:22.260 --> 01:11:27.160
PZ24-0129, and we have Jonathan Stenlove

01:11:27.160 --> 01:11:29.240
our planning and zoning director.

01:11:29.240 --> 01:11:32.230
Welcome, Jonathan.

01:11:32.230 --> 01:11:33.950
Thank you, Madam Mayor, members of the council.

01:11:33.950 --> 01:11:38.550
This will kick off the first,

01:11:38.550 --> 01:11:42.830
I don't know of how many public hearings that we're going to go to to go to each chapter. We have

01:11:43.350 --> 01:11:46.870
Well, we're 13. I think now we're going to cover the first three. We're going to

01:11:47.630 --> 01:11:53.990
Step into the kiddie pool really lightly with a few chapters that have not a lot of changes

01:11:54.590 --> 01:11:57.570
Per say from what we have but the look will be different

01:11:58.290 --> 01:12:01.210
I'm going to go where I'm not going to

01:12:01.850 --> 01:12:05.990
Go through everything line by line. I'm going to show you what we currently have

01:12:05.990 --> 01:12:08.270
I'm going to show you what we are proposing.

01:12:08.270 --> 01:12:10.310
A lot of the language is going to be the same.

01:12:10.310 --> 01:12:11.790
I like a few of the changes.

01:12:11.790 --> 01:12:13.790
And I will often look over at Will,

01:12:13.790 --> 01:12:14.830
as we've kind of worked on this.

01:12:14.830 --> 01:12:18.070
He's going to remind me of some of the things I don't say.

01:12:18.070 --> 01:12:21.790
This is what our current Title 10, Chapter 1, which

01:12:21.790 --> 01:12:24.310
is the general provisions looks like.

01:12:24.310 --> 01:12:28.470
As you go to our website, it's actually hosted by Am Legal.

01:12:28.470 --> 01:12:31.800
And it goes through the title of the authority,

01:12:31.800 --> 01:12:34.960
the jurisdiction, how we are able to create these rules.

01:12:34.960 --> 01:12:38.700
This is the, I'm gonna say the boring stuff of the title.

01:12:38.700 --> 01:12:42.040
This is what you point to, say here's our policies,

01:12:42.040 --> 01:12:45.140
land subdivisions, the purpose of why we're here

01:12:45.140 --> 01:12:46.940
and some of this stuff is given actually

01:12:46.940 --> 01:12:48.780
by the state of Idaho.

01:12:48.780 --> 01:12:52.360
A lot of it is the health and welfare

01:12:52.360 --> 01:12:54.520
for the community and some of the police power

01:12:54.520 --> 01:12:58.040
of the zoning code.

01:12:58.040 --> 01:13:02.200
The proposed look is a little bit different.

01:13:02.200 --> 01:13:05.160
We went to a two column look.

01:13:05.160 --> 01:13:07.800
We kept a lot of the same, I guess,

01:13:07.800 --> 01:13:08.840
the nuts and bolts of the words,

01:13:08.840 --> 01:13:10.440
but we made it look different.

01:13:10.440 --> 01:13:12.560
We have an effective date, the purpose and tend,

01:13:12.560 --> 01:13:17.090
the authority, and we're gonna go through,

01:13:17.090 --> 01:13:18.890
I think I'll touch on a few sections of this one.

01:13:18.890 --> 01:13:21.570
This is the longest of the three chapters.

01:13:21.570 --> 01:13:25.070
It's just a lot of those general purpose statements.

01:13:25.970 --> 01:13:30.970
In the end, we took some sections from other places.

01:13:31.330 --> 01:13:33.810
Mediation is a newer one that was somewhere else,

01:13:33.810 --> 01:13:36.980
I think we brought into chapter one.

01:13:36.980 --> 01:13:40.220
most of these end up being just what the state statute or what a loop of

01:13:40.220 --> 01:13:43.460
requires us to have our local land use planning act from the state about how

01:13:43.460 --> 01:13:50.330
requires us to have and it has just some other general provisions in it. I'm just

01:13:50.330 --> 01:13:54.210
going to scroll slowly and I'm going to pause for questions if anybody had any

01:13:54.210 --> 01:14:04.360
specific ones on any particular section. Is there anything major? We clarify a

01:14:04.360 --> 01:14:09.320
lot of things but there are no major changes from what we currently have. Most

01:14:09.320 --> 01:14:13.160
of these things all have the violations penalties effective dates it just looked

01:14:13.160 --> 01:14:17.680
different. When we pulled in mediation that was in a separate code section we

01:14:17.680 --> 01:14:22.280
brought it in the general provisions because that mediation portion is

01:14:22.280 --> 01:14:26.200
actually a state requirement and so we have to list it somewhere. That's a general

01:14:26.200 --> 01:14:31.640
provision that's not a specific zoning district provision. There are no real

01:14:31.640 --> 01:14:37.200
major changes we clarified because the one I stopped on this transitional

01:14:37.200 --> 01:14:42.280
development. Basically if you've applied for a permit at one point in time and the

01:14:42.280 --> 01:14:48.200
check code changes, you don't go with the new rule, you go with the older rule. So

01:14:48.200 --> 01:14:51.440
you have some things about unexpired permits and what provision governs. It's

01:14:51.440 --> 01:14:54.840
the provision when you apply for a permit. Now that wasn't explicitly stated. That's

01:14:54.840 --> 01:15:01.120
just been a, quite frankly, it's a Supreme Court case type of thing. So you just kind

01:15:01.120 --> 01:15:06.160
of do it. We just put it in here as a very clear what our expectation is and what

01:15:06.160 --> 01:15:11.880
we're going to do. Same with the violations and penalties. Other than that we kind of clarified

01:15:11.880 --> 01:15:17.520
who's the administrator, who's actually making decisions on what that person does. These were

01:15:17.520 --> 01:15:23.000
found part of it in like the bylaws section, but really that's an administrative general

01:15:23.000 --> 01:15:28.400
provision section. We pulled things from different chapters to create this chapter one that actually

01:15:28.400 --> 01:15:33.970
deals with the general provisions of the entire title. Otherwise, no, we ended up putting all

01:15:33.970 --> 01:15:40.630
that into this instead of multiple chapters now they're just into one. Thank you. I'm trying to think

01:15:40.630 --> 01:16:04.290
on the on the bylaws we did one of the changes I know we made looking for where it is. Two things.

01:16:04.930 --> 01:16:11.090
One has to do with when you give us information when somebody sends information in or public comment

01:16:11.090 --> 01:16:16.660
is going to be accepted. That is a change you're going to make. Talk about that one and we'll talk

01:16:16.660 --> 01:16:21.450
We talk about the hearing procedures.

01:16:21.450 --> 01:16:25.250
We currently allow public comment, written public comment to be received up till noon

01:16:25.250 --> 01:16:26.730
the day of the public hearing.

01:16:26.730 --> 01:16:31.010
We've heard from multiple council members and our planning zoning commission at times

01:16:31.010 --> 01:16:35.250
that is almost a disservice because we can't get through, we have a lot of them in that

01:16:35.250 --> 01:16:39.330
one day from noon to five, essentially.

01:16:39.330 --> 01:16:46.030
We have changed that to, I think it's 72 hours, basically the Friday before the hearing, so

01:16:46.030 --> 01:16:49.150
that any written comments have to be delivered and they can be part of the packet or sent

01:16:49.150 --> 01:16:50.150
to over the weekend.

01:16:50.150 --> 01:16:52.390
People can still come and speak during hearing.

01:16:52.390 --> 01:16:57.970
Was there a written comment or two business days, that's what it is, it's F.

01:16:57.970 --> 01:17:02.360
If I will see here, help me right here.

01:17:02.360 --> 01:17:05.400
Written comments shall be received two business days prior to the hearing to be accepted for

01:17:05.400 --> 01:17:08.390
consideration by the hearing body.

01:17:08.390 --> 01:17:13.150
There have been times where we received ten pages of comments from one person and from

01:17:13.150 --> 01:17:16.470
a council or commission standpoint the day of the meeting.

01:17:16.470 --> 01:17:22.190
There's not enough time to go through 10 pages or 20 pages of comments to address any of those

01:17:22.190 --> 01:17:23.190
comments.

01:17:23.190 --> 01:17:25.710
That doesn't mean people can't come and speak and still have those heard.

01:17:25.710 --> 01:17:30.070
It was the written comments of two business days to try and get that to as part of the packet

01:17:30.070 --> 01:17:33.100
over the weekends.

01:17:33.100 --> 01:17:37.700
The other change was, I'm going to go back, during the public hearing, the rules that you've

01:17:37.700 --> 01:17:43.620
been reading were, was the directive some years ago.

01:17:43.620 --> 01:17:44.620
That yellow sheet?

01:17:44.620 --> 01:17:46.620
Yeah, that yellow sheet you read.

01:17:46.620 --> 01:17:51.500
we've that sheet was a directive from Council to change and then we're basically just reflecting

01:17:51.500 --> 01:17:58.500
that into the code now. One of the things were we swapped who went first. That was a directive

01:17:58.500 --> 01:18:03.980
some time ago that we as staff present first the bylaws have said that it was the applicant

01:18:03.980 --> 01:18:08.580
first but there was always a confusion. We've gone first but that's basically reflecting

01:18:08.580 --> 01:18:14.240
that currently in the code is that's how we're going to do it.

01:18:14.240 --> 01:18:22.150
Yeah, ten, one, ten, um, introduces rules of language construction, so essentially defines

01:18:22.150 --> 01:18:27.350
how we're gonna, how someone needs to read it. So, shall, will, and must, are all with always

01:18:27.350 --> 01:18:33.030
mandatory and may as permissive. So, like three. We didn't have any of these sections here before.

01:18:33.030 --> 01:18:44.480
Just clarifies what those words will mean in terms of this code. Really, as the majority of the

01:18:44.480 --> 01:18:53.090
changes. We fully expect there to be spelling errors, or where has County City, as we copied

01:18:53.090 --> 01:18:58.290
and we've kind of used things from other places, punctuation, those things were going to be clarifying

01:18:58.290 --> 01:19:03.160
as we go along. There's just a lot of pages to go through, so we think we're going to miss

01:19:03.160 --> 01:19:10.230
some. We'll hopefully fix them all before the final public hearing some months from now.

01:19:10.230 --> 01:19:15.780
That is all for chapter one, unless there's any more questions. That's great. Thank you.

01:19:15.780 --> 01:19:23.140
Any questions before I open up the public hearing?

01:19:23.140 --> 01:19:25.140
I will, yes.

01:19:25.140 --> 01:19:30.140
Do we not do all three public hearings, or do they have to be individual?

01:19:30.140 --> 01:19:32.620
You can do them all if you'd like.

01:19:32.620 --> 01:19:39.620
We advertise them all to have separability because some of the chapters, later chapters, might be more,

01:19:39.620 --> 01:19:45.000
the controversial will have more input, so you'll want to separate those so there's not one motion.

01:19:45.000 --> 01:19:49.640
but tonight we could use it go and present the next chapter until we can do a

01:19:49.640 --> 01:19:58.810
public unit with that be appropriate as the next ones are pretty short chapter

01:19:58.810 --> 01:20:09.050
three I'm going to show you what the current chapter three we pulled from two

01:20:09.050 --> 01:20:11.930
different sections are a couple different there's a warehouse historic

01:20:11.930 --> 01:20:15.850
overlay district which has a lot of provisions about historic preservation

01:20:15.850 --> 01:20:20.600
and we also that's the only one that was in the zoning called the rest of the

01:20:20.600 --> 01:20:29.030
rest and re-referenced by other decisions, we've truncated it down into one chapter and

01:20:29.030 --> 01:20:35.740
one page. And it talks about what's applicable, the certificate of appropriateness, and how

01:20:35.740 --> 01:20:42.960
they go about applying for a certificate, as well as denoting the areas right in here what

01:20:42.960 --> 01:20:48.000
districts we have. We currently have downtown historic city park district and the warehouse

01:20:48.000 --> 01:20:53.920
district. We have three total historic districts. We're going to reference all of them just as

01:20:53.920 --> 01:20:58.240
historic districts. Removing the warehouse has an overlay because that's more of a zoning thing,

01:20:58.240 --> 01:21:04.320
not a historic district thing. And these will now be referenced with their own maps that we have

01:21:04.880 --> 01:21:12.560
that we'll be providing. We didn't change much else other than make this certificate of appropriateness

01:21:12.560 --> 01:21:19.770
from, it was in a weird section, it was in the building code section under chapter 13. And we just said

01:21:19.770 --> 01:21:22.470
said you need a certificate of appropriateness, whether you need a building criminal or not,

01:21:22.470 --> 01:21:26.770
this reflects truly what the statute talks about a certificate of appropriateness for.

01:21:26.770 --> 01:21:28.270
And it's just one page.

01:21:28.270 --> 01:21:30.040
Great.

01:21:30.040 --> 01:21:31.040
Sim, did you have something?

01:21:31.040 --> 01:21:32.040
Yeah, thank you, Madam Mayor.

01:21:32.040 --> 01:21:39.540
So in 10, 14, 4, subsection C, if the request is not in accordance with the conference, a plan

01:21:39.540 --> 01:21:43.540
that requests shall be submitted to the commission or in its absence of the council, which shall

01:21:43.540 --> 01:21:46.540
recommend the council, what does it in its absence mean?

01:21:46.540 --> 01:21:54.770
So, I have to pull up the code because you pulled up a section that I don't want to talk about right now, but let me look.

01:21:54.770 --> 01:21:56.770
I'm sorry, I had the wrong one.

01:21:56.770 --> 01:22:00.910
I don't know.

01:22:00.910 --> 01:22:01.910
I was looking at the...

01:22:01.910 --> 01:22:02.910
That's not even...

01:22:02.910 --> 01:22:04.910
No, I was looking at the...

01:22:04.910 --> 01:22:06.710
What was that?

01:22:06.710 --> 01:22:08.540
How am I?

01:22:08.540 --> 01:22:14.970
I was looking at the P&D minutes on this one.

01:22:14.970 --> 01:22:17.320
That's a different...

01:22:17.320 --> 01:22:19.320
It was part of the... I may be wrong.

01:22:19.320 --> 01:22:23.060
You wanted a riff raise.

01:22:23.060 --> 01:22:26.440
I was just wondering what it meant.

01:22:26.440 --> 01:22:28.440
In the absence of a commission...

01:22:28.440 --> 01:22:31.440
If it's referring to a planning and zoning commission,

01:22:31.440 --> 01:22:33.780
not all cities have a planning and zoning commission,

01:22:33.780 --> 01:22:36.440
the council retains that decision.

01:22:36.440 --> 01:22:38.520
Thank you.

01:22:38.520 --> 01:22:41.520
But those are the main changes about historic districts.

01:22:41.520 --> 01:22:43.940
Any questions specifically on those?

01:22:43.940 --> 01:22:50.660
Any questions for Jonathan on this one?

01:22:50.660 --> 01:22:53.550
Chapter three.

01:22:53.550 --> 01:23:04.400
Okay, moving on to Chapter 11, Area of Impact.

01:23:04.400 --> 01:23:09.400
So we go from this section here, multiple portions that basically say

01:23:09.400 --> 01:23:14.980
the area of impact is the jurisdiction of the county. We pretty much say that again

01:23:14.980 --> 01:23:21.680
but even fewer words that it is the administration is of the County Board of

01:23:21.680 --> 01:23:26.960
Commissioners and this provision here which is persons living within the area

01:23:26.960 --> 01:23:29.600
of impact shall be entitled to representation that's actually a state

01:23:29.600 --> 01:23:35.000
statute so we can't remove that and then the enforcement is the county and they

01:23:35.000 --> 01:23:40.080
can renegotiate it at any time upon the request which is still sort of a

01:23:40.080 --> 01:23:43.280
state statute and I say sort of if it's changed a bit, it's not really an

01:23:43.280 --> 01:23:46.560
negotiation, but we can certainly talk with the county about it and submit any

01:23:46.560 --> 01:23:52.140
recommendations to them. We still need this chapter, but it's a pretty short one.

01:23:52.140 --> 01:23:58.880
As you can see, that is all. Excellent. Any questions on that one? Chapter 11.

01:23:58.880 --> 01:24:08.910
Okay, so I will open up the public hearing and public hearing 4, looking at

01:24:08.910 --> 01:24:16.450
Chapter 1, Chapter 3, and Chapter 11. Chapter 1 is General Provisions. Chapter 3 is

01:24:16.450 --> 01:24:21.960
Historic District and Regulations in Chapter 11 is Area of Impact. Is there

01:24:21.960 --> 01:24:26.840
anybody in the audience that wishes to address City Council on these three

01:24:26.840 --> 01:24:38.150
chapters in the Code? Title 10. Seeing no one, I will close the public hearing and

01:24:38.150 --> 01:24:49.990
Council discussion. Craig Hawkins. I just think it's pretty well straight

01:24:49.990 --> 01:24:53.310
forward to make sense. Any problem with it?

01:24:53.310 --> 01:25:00.310
Mr. Reed, I just want to thank everyone who's worked very hard on that. We talked about this

01:25:00.310 --> 01:25:01.310
in...

01:25:01.310 --> 01:25:02.310
Was it 18?

01:25:02.310 --> 01:25:04.310
Was it 18? 17?

01:25:04.310 --> 01:25:08.310
Somewhere around there, and I know a ton of work has gone into this, so thank you.

01:25:08.310 --> 01:25:09.720
I agree.

01:25:09.720 --> 01:25:10.720
Grayson?

01:25:10.720 --> 01:25:16.170
Well, Madam Mayor, I'm willing to make a motion. There's no further discussion.

01:25:16.170 --> 01:25:19.870
And can we can include all three and one motion you want three motions

01:25:24.480 --> 01:25:26.480
okay

01:25:27.240 --> 01:25:30.240
First one Grayson. Oh, thank you Madam Mayor

01:25:30.240 --> 01:25:37.240
I will make a motion that we approve a zoning title amendment to repeal and replace title 10 folks on chapter one general provisions

01:25:37.560 --> 01:25:42.320
easy to nine dash zero one two nine. Thank you. Can I have a second second?

01:25:42.600 --> 01:25:45.760
Thank you motion by Grayson Stone second by Chris Reed

01:25:45.760 --> 01:25:52.080
to approve the zoning title amendment to replace repeal and replace title 10

01:25:52.080 --> 01:25:59.080
focusing on chapter one general provisions any discussion Rachel

01:25:59.080 --> 01:26:10.520
Rokavo please yes yes yes yes yes yes yes yes yes yes yes yes yes yes yes thank

01:26:10.520 --> 01:26:12.520
Thank you. Motion passes 7-0.

01:26:12.520 --> 01:26:15.520
Okay. Next item, chapter 3.

01:26:15.520 --> 01:26:21.140
Jason Brown.

01:26:21.140 --> 01:26:32.670
Would move to amend the zoning title, or move to approve the zoning title amendment to repeal

01:26:32.670 --> 01:26:37.670
and replace title and focusing on chapter 3 historic districts and regulations.

01:26:37.670 --> 01:26:39.670
Thank you, Chris Reed. Second.

01:26:39.670 --> 01:26:45.670
Thank you. Motion by Jason Brown. Seconded by Chris Reed to approve the zoning title amendments

01:26:45.670 --> 01:26:50.490
to repeal and replace Title 10, focusing on Chapter 3,

01:26:50.490 --> 01:26:54.730
historic district and regulations.

01:26:54.730 --> 01:26:57.740
Rachel Roquevo, please.

01:26:57.740 --> 01:26:58.240
Yes.

01:26:58.220 --> 01:26:58.980
Jason Brown.

01:26:58.980 --> 01:26:59.480
Yes.

01:26:59.480 --> 01:27:00.340
Spencer Cutler.

01:27:00.340 --> 01:27:00.840
Yes.

01:27:00.780 --> 01:27:01.980
Sherry Vomer.

01:27:01.980 --> 01:27:03.020
Grace Nstone.

01:27:03.020 --> 01:27:03.860
Yes.

01:27:03.860 --> 01:27:04.500
Ruth Pierce.

01:27:04.500 --> 01:27:05.000
Yes.

01:27:04.940 --> 01:27:05.780
And Chris Rie.

01:27:05.780 --> 01:27:07.140
Yes.

01:27:07.140 --> 01:27:09.860
Thank you, Motion passes 7-0.

01:27:09.860 --> 01:27:11.060
OK, we have one more.

01:27:11.060 --> 01:27:14.620
Now, this is Chapter 11 Spencer color.

01:27:14.620 --> 01:27:16.620
Well, I'll make this motion.

01:27:16.620 --> 01:27:20.620
So I move to approve the proposed zoning text amendment

01:27:20.620 --> 01:27:24.420
to the area of the impact chapter of Title 10 as presented.

01:27:24.420 --> 01:27:27.460
Thank you, do you have a second?

01:27:27.460 --> 01:27:28.300
Second.

01:27:28.300 --> 01:27:31.940
Thank you, motion by Spencer Cutler, second by Sherry Volmer.

01:27:31.940 --> 01:27:34.700
To approve the zoning title amendments to replace

01:27:34.700 --> 01:27:42.500
and repeal Title 10, focusing on Chapter 11 area of impacts.

01:27:42.500 --> 01:27:44.340
Rachel Rohe, call vote please.

01:27:44.340 --> 01:27:45.260
Ruth Pierce.

01:27:45.260 --> 01:27:45.760
Yes.

01:27:45.760 --> 01:27:46.460
Chris Reed.

01:27:46.460 --> 01:27:46.960
Yes.

01:27:46.960 --> 01:27:47.660
Ray Cawkins.

01:27:47.660 --> 01:27:48.160
Yes.

01:27:48.160 --> 01:27:48.860
Jason Brown.

01:27:48.860 --> 01:27:49.360
Yes.

01:27:49.360 --> 01:27:51.400
Mr. Cutler, to share your mama.

01:27:51.400 --> 01:27:51.900
Yes.

01:27:51.900 --> 01:27:52.720
In Grace and Stone.

01:27:52.720 --> 01:27:53.760
Yes.

01:27:53.760 --> 01:27:54.260
Thank you.

01:27:54.200 --> 01:27:56.680
Motion passes 7 to 0.

01:27:56.680 --> 01:27:57.640
Thank you, guys.

01:27:57.640 --> 01:27:59.560
That was great.

01:27:59.560 --> 01:28:03.000
So next on the agenda is the canceled executive session.

01:28:03.000 --> 01:28:04.920
And so we are adjourned.

01:28:04.920 --> 01:28:07.000
Thank you, everyone.